Marek Stavinoha Legal officer DG MOVE A4 European Commission

Slides:



Advertisements
Similar presentations
SPUTNIC – Strategies for Public Transport in Cities Strategies for Public Transport in Cities Funded by the EU PT Market.
Advertisements

Natasa Mauko Slovenian Association of Disabled Students.
HAYLEA CAMPBELL SUSTAINABLE PROCUREMENT IN THE EU.
Context In the EU CSR strategy from October 2011 „A renewed EU strategy for Corporate Social Responsibility“, the EU Commission announced to „present.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Introduction to the Albanian Public Procurement System Central Asia Regional Public Procurement.
Public Procurement in Albania in the framework of recent reforms PUBLIC PROCUREMENT AGENCY 1.
Comments on the 2011 draft SGEI Package Damien Geradin Covington & Burling, Tilburg University and College of Europe Bruges, 30 September 2011.
1 Directorate-General for Energy and Transport / Air Transport Directorate EU Directive on Airport Charges Background and content.
1 / LiveLink number Passenger Land Transport in Portugal: Improving Competition by Legislative Reform José Luís Moreira de Silva Ana Pereira de Miranda.
Road charging and vehicle taxation - the EU perspective
The European Railway Agency in development
1 The Current Situation Regarding PPPs and Concessions in the EU Olivier Moreau European Commission, DG MARKT.C1
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
Audit of Public Procurement
Public Procurement in the Republic of Cyprus By: Theodosis Tsiolas Public Procurement Directorate Treasury of the Republic.
Nov/Dec 2003ElectraNet BSP-2 Workshop (khb) 1 EU Telecoms Regulatory Status Governing Legislation Package 2002  Directive 2002/19/EC Access to, and interconnection.
Smooth travel in all transport modes EU Passenger Law – Towards 2020 LTTL - Forum 6 December 2011 Salvatore D’ACUNTO Head of Unit Passenger Rights European.
Study on the Implementation of the European Regulation (EC) N° 1370/2007 on public passenger transport services by rail and by road of 23 October 2007.
A EUROPEAN WORKS COUNCIL WHAT IS IT FOR ? the legal framework.
European Commission Rita L’ABBATE Legal aspects linked to internal market DG Enterprise and Industry MARKET SURVEILLANCE COMMUNITY FRAMEWORK UNECE “MARS”
ESCWA Expert Group Meeting on transport and trade facilitation in the ESCWA region Beirut 7./ Proposal for a work schedule for ESCWA Work Group.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Transport Modification of the PSO Regulation in the framework of the 4 th railway package Jan Scherp European Commission, DG Transport and Mobility Roundtable.
The 4 th Railway Package: Impact for the keepers Clio Liégeois.
Study on the implementation of the European Regulation (EC) N° 1370/2007 on public passenger transport services by rail and by road of 23 October 2007.
Cooperationand consortium building Luis Araque de Juan European Commission International Cooperation and Development DEVCO/EuropeAid Unit R.3 Legal Affairs.
The Fourth Railway Package - National Regulatory Body’s Perspective Dr Iris Henseler-Unger, Federal Network Agency, Vice President.
Jonathan Goldberg - EMTA Draft regulation on public passenger transport services by rail and by road Progress report - October 2006 EMTA General meeting.
Laurent SARAZIN Head of Unit, DG EuropeAid R/3 – Legal Affairs
Directive on the Authorisation of electronic communications networks & Services Directive (2002/20/EC) Authorisation Directive Presented by: Nelisa Gwele.
EMTA General Meeting Prague May 2012 Round table on PSO Regulation 1370/2007 “Two years after enforcement, where are we? How efficient is the regulation?
1 This project is supported by the European Union 3 rd MEDREG-IMME Seminar Reform and Opening of Maghreb Electricity Markets September 2013 MRA (Malta)
1 M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 9 – Financial Services Bilateral.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 15 – Energy – Upstream Hydrocarbons.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 14 – Transport Bilateral screening:
Ex-ante state aid control initial assessment of the planned state aid performed by the Ministry of Finance.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Best practices related to procurement within a project (for part of the expenditure) implemented by the beneficiary itself (art. 67, par. 4 of Regulation.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Concessions laws from EU procurement directives perspective.
PHILIPPINE COMPETITION ACT
competition rules in inland transport
Public Procurement Agency - Bulgaria
The European Accessibility Act
The European Accessibility Act
The European Accessibility Act
PRESENTATION OF MONTENEGRO
European Union Law Week 10.
Nuclear and Treaty Law Section Office of Legal Affairs
NAB/RB Training Workshop In Valenciennes, April 2016
PRESENTATION OF MONTENEGRO
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
The New Italian Law on Ports in the European Perspective
UNCITRALThird International Colloquium on Public-Private Partnerships (PPPs) October 2017, Vienna Experts for Chapter IV October 2017.
The Mutual Recognition Regulation
Meeting of the WG on Rail Transport Statistics 2-3 April 2009
The new regulatory framework for suburban railways
Marine knowledge presentation to eighth meeting of Marine Observation and Data Expert Group presentation to eighth meeting of Marine Observation and.
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
Communication on passenger rights in all transport modes
ESF INFORMAL TWG Prague, 2-3 April 2009 Lump sums grants
Meaning, evaluation and legislative procedure of new draft regulation on public passenger transport services by rail and by road (COM (2005) 319 final.
The evaluation process
Pedro Cruz Yábar Brussels, 21st June 2016
Future Monitoring and Evaluation: Focus on results Antonella Schulte-Braucks Ines Hartwig ESF Evaluation Partnership Brussels 17 November 2011.
Andrea Sundstrand Associate Professor
The Treaty of Lisbon and Administrative Cooperation
PRESENTATION OF MONTENEGRO
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Outline Background: development of the Commission’s position
THE EU LEGAL FRAMEWORK ON EMPLOYEE INVOLVEMENT
Presentation transcript:

Competitive tendering for rail public service contracts – amendment of Regulation 1370/2007 Marek Stavinoha Legal officer DG MOVE A4 European Commission Warszawa, 12 April 2017

Purpose of Regulation (EC) No 1370/2007 Regulation defines how competent authorities may act in the field of public passenger transport to guarantee the provision of services of general interest which are among other things more numerous, safer, of a higher quality or provided at lower cost than those that market forces alone would have allowed.

Scope of Regulation (EC) No 1370/2007 Regulation lays down the conditions under which competent authorities, when imposing or contracting for public service obligations, compensate public service operators and/or grant exclusive rights in return for the discharge of public service obligations. This Regulation applies to the national and international operation of public passenger transport services by rail and by road.

Content of Regulation (EC) No 1370/2007 Mandatory content of public service contracts General rules under which the Member States may impose tariffs Award of public service contracts Compensation for discharging of public service obligations Reporting on public service contracts State aid rules

Types of award of public service contracts On the basis of procurement directives if concerning service contracts or public service contracts for public passenger transport services by bus or tram Direct award to an internal operator Direct award if the value of the contract or amount of services fall under certain value (de minimis)

Types of award of public service contracts Direct award in case of disruption of the service (emergency award) Direct award in case the public service contract concerns transport by rail Award on the basis of a competitive tendering procedure

Objectives of the Commission's proposal (2013) Improvement of the quality of rail passenger services and increase of their operational efficiency. Introduction of the principle of mandatory tendering of rail public service contracts. Introduction of additional measures to improve the tendering procedures.

What can we expect from competitive tendering What can we expect from competitive tendering? (from the Commission's impact assessment) Savings of public funding for tendered rail public service contracts: NL 20%-50% DE ca. 20% SE 20%-30% Improvements in rail service quality: DE: transport volume increased by 30% thanks to improved frequency and quality UK: punctuality increased between 2002-2009 despite increasing traffic intensity

Regulation 2016/2338 Amending Regulation (EC) No 1370/2007 Outcome of difficult negotiations, balancing out very diverging political positions between the European Parliament and the Council Concerns primary rail transport but has an impact also on other modes falling within the scope of Regulation (EC) No 1370/2007

Main changes brought by Regulation (EU) 2338/2016

Definition of public passenger transport services by rail New definition of "public passenger transport services by rail" excludes passenger transport by other track-based modes, such as metros or tramways. These modes are therefore not concerned with specific provisions encompassed in the Regulation which are applicable to rail (e.g. performance-based exemption).

Specification of public service obligation Obligation to lay down specifications of public service obligations while respecting proportionality principle. Possibility to group cost-covering services with non-cost-covering services.

Specification of public service obligation and compensation Specifications and compensation must achieve the objectives of the public transport policy in a cost-effective manner, and be consistent with the policy objectives stated in public transport policy documents of the Member States.

Social rights Public service operators must comply with obligations applicable in the field of social and labour law established by Union law, national law or collective agreements. Possible additional social standards or rights of employees subject to transfer between two operators must be included in the tender documents and in the public service contracts. Mandatory transfer of staff in cases when Directive 2001/23/EC applies.

Provision of information in the competitive procedure The operator must provide the competent authority with the information necessary for the preparation of the tender (e.g. passenger demand, fares, costs and revenues). Competent authority must provide this information to all interested parties for the preparation of an offer.

New conditions of award to an internal operator In case a group of authorities award a rail public service contract to an internal operator controlled by one them, their area of competence may not be national. The public service contract awarded in this way may only cover the transport needs of urban agglomerations or rural areas.

Introduction of principle of mandatory competitive tendering for all public service contracts Public service contracts for public passenger transport services by rail must, in principle, be awarded through mandatory competitive tendering.

Exemptions from the principle of mandatory competitive tendering Exceptional circumstances: a competent authorities are already carrying out other tenders, which could have an impact on the number and quality of bids or competent authority wants to change the scope of public service contracts (only railways). Simplified procedure: The competent authority has received only one bid following the announcement of the award of public service

Exemptions from the principle of mandatory competitive tendering De minimis: value / size of the public service contract is lower than the newly elevated thresholds specified in the Regulation. Railway infrastructure manager and operator of the public service obligation on its infrastructure are the same entity and the infrastructure is excluded from the scope of the Directive (EU) No. 2012/34 (only railways).

Exemptions from the principle of mandatory competitive tendering Emergency situation in the event of a disruption of services or the immediate risk of such a situation

Performance based exemption Where competent authority considers that the direct award is justified by structural and geographical characteristics of the market or network, and if the contract results in an improvement in quality of services or cost-efficiency, in comparison to the previous one.

Performance based exemption Competent authority must define in contract measurable, transparent and verifiable performance requirements and periodically check whether the operator fulfils them. In case of a failure to fulfil the requirements, the competent authority must take deterrent measures, including suspension or termination of the contract. The decision of competent authorities may be assessed by an independent body.

Limitation of number of contracts awarded to the same operator Competent authorities may decide that contracts for public passenger transport services by rail covering parts of the same network or package of routes are to be awarded to different railway undertakings. To this end, the competent authorities may, decide to limit the number of contracts to be awarded to the same railway undertaking.

Access to the rail rolling stock With a view of competitive tendering, competent authorities must make public an assessment whether it is necessary to take measures to ensure effective access to rail rolling stock. Competent authorities may take measures to ensure such an access: acquisition of rolling stock, guarantees for the financing of rolling stock, commitment to takeover rail vehicles after the contract finishes, creation of rolling stock pool

Transition arrangements 2017: (24.12.) entry into force of new Regulation 2019: Application of the principle of competitive award and of new performance based exemption next to possibility of direct award 2023: Expiry of application of direct award possibility max. duration of existing rail PSC of 10 years direct award only in exceptional cases (exemptions)

Implementing the new law: Consequences for market stakeholders Member States: To decide whether to prohibit exemptions to competitive award Competent authorities: To acquire administrative competence and resources to prepare and organise competitive award procedures To create trust in their capacity to ensure non- discriminatory award conditions (e.g. rail rolling stock) To decide whether transfer of staff is needed to facilitate competition

Implementing the new law: Consequences for market stakeholders Railway undertakings To undertake activities in accordance with new rules Rail Regulatory Bodies To fully use their competencies to facilitate effective market opening European Commission to reap synergies between enforcing rail legislation on market opening and applying EU competition rules Passengers will be able to benefit of competitive rail transport services

Thank you for your attention!