ORIO Project Plan Procurement Bas Schilperoort Opening slide.

Slides:



Advertisements
Similar presentations
Joint WTO/WB Regional Workshop on Procurement Reform and Transparency Session 9: Technical Cooperation and Capacity Building Capacity Building in Government.
Advertisements

The use of Procurement Agents
Ministry of Foreign Affairs, Latvia 1 EC Cooperation with Third Countries EC Procurement to Third Countries prepared by Mauro Napodano
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – February 2004.
Session 8 Implementing PPPs
Flowchart on Procurement Guidance for a proposed OBA scheme Is the project involving an existing service provider (SP) ? YES NO PROJECT PREPARATION Are.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
18 June 2014 State of the Pacific, ANU Chinese assistance in the Pacific: Agency, effectiveness, and the role of Pacific Island governments Philippa Brant.
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
Phases of A BOT Project Prepared By :Afaf Bu-khawa Course title: Technology Implementation,MGT 620.
World Bank’s new methodology In Country procurement assessment World Bank’s Methodology for Procurement laws: back to country systems?
Horizontal Research Activities involving SMEs Joachim Ball, European Commission, DG RTD B3 n Co-operative Research n Collective Research General Introduction.
1 Business Opportunities Istanbul, Turkey 30 April 2010 Asian Development Bank.
1 Case Helsinki City Education Department - purchasing process Susanna Sarvanto Training Manager HAUS, Finnish Institute of Public Management Ltd.
Working with EBRD – Consultant Opportunities for Dutch Consultants Selection & Contracting of Consultants under EBRD’s Procurement Policies and Rules (PP&R)
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
System of Public Procurement in Turkmenistan
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
Overall Considerations
Public Procurement Exchange Platform Efficient implementation of Procurement - Centralized Purchasing Mr. Safet Hoxha, President of PPRC Mr. Ilaz Duli,
© Dr. John T. Whiting All Rights Reserved Slide 1 The Rationale for Integrating IT Assets into the Strategic Business.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Procurement Supervision and Monitoring State Agency on Public Procurement of Goods, Works and Services under the Government of the Republic of Tajikistan.
Safeguard Training Workshop Zagreb, Croatia May 7, 2009 Ruxandra Floroiu (Environmental Engineer)
Overcoming HIV/AIDS Epidemic in Ukraine National programme supported by GFATM Presentation by Alvaro Bermejo and Andriy Klepikov at the Stakeholders Meeting.
Coordination Trafficking in persons.  ROLES AND RESPONSIBILITIES  Coordinator  The Ministry of Foreign Affairs and the Ministry of Social Solidarity.
State Agency on Public Procurement and Material Reserves under the Government of the Kyrgyz Republic Public Procurement System of the Kyrgyz Republic.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
Improving Aid Coordination in Tajikistan Aid Coordination in Tajikistan Improving and Challenges Aid Coordination in Tajikistan Improving and Challenges.
PUBLIC PROCUREMENT SYSTEM IN TAJIKISTAN RAVSHAN KARIMOV AGENCY FOR PUBLIC PROCUREMENT UNDER THE GOVERNMENT OF THE REPUBLIC OF TAJIKISTAN.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
Dialogue Facility – Bridging Phase November 2015 Workshop DIRCO.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Consulting Opportunities in IDB Private Sector Operations.
Inter-American Development Bank Works, Goods and Consulting Services in projects financed by IDB April PROCUREMENT.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
PRE-BID MEETING CONSTRUCTION OF THE MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING WORLD BANK GUIDELINES Presented by: Brendah Shange.
EU - China 11 Guidelines for Applicants rules for applications European Union Delegation to China & Mongolia Beijing Information Session 14 th November.
CONSTRUCTION PROCUREMENT, CONTRACTING AND CONTRACTS MANAGEMENT IN GHANA PREPARED BY: SURV. OSEI AGYEMANG-BADU MSc, BSc, MGhIS. (PROCUREMENT SPECIALIST)
SACPCMP CONSTRUCTION MANGEMENT SUMMIT
Procurement Process WFP Logistics, We Deliver.
Supplying ITS Equipment to World Bank Projects
WP3 - Evaluation and proposal selection
Infrastructure Investment at ADB
TECHNICAL ASSISTANCE FUND IIB– Slovak Republic
Procurement Management
HELLASCO CONFERENCE 2017 The recent developments in the external aid consulting sector September 29, 2017 Ines Ferguson, Chair of EFCA European.
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
EUROPEAID/121737/D/SV/RO - Training in Project Cycle Management, Procurement and Contracting of Pre-Accession Projects and Management of EU Structural.
Content of Tender Dossier Instructions to Tenderers
Particular Conditions of Contract & Appendix to Tender
PRESENTATION OF MONTENEGRO
Contract Award Procedures
PRAG PRACTICAL GUIDE TO CONTRACT PROCEDURES FOR EXTERNAL ACTIONS
PRAG PRACTICAL GUIDE FOR CONTRACT PROCEDURES
Guidelines on participation in EU External Assistance Programmes
Enterprise Content Management Owners Representative Contract Approval
Particular Conditions of Contract & Appendix to Tender
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
PROCUREMENT POLICIES AND GUIDELINES
EXTERNAL ASSISTANCE PROGRAMMES
Guidelines on participation in EU External Assistance Programmes
PRAG WORKSHOP Introduction to Practical Guide (PRAG)
Cofindustria OVERVIEW OF THE WORLD BANK PROGRAM IN SERBIA
The Preparation Phase: Part III: financial issues
European Spallation Source ERIC Procurement
MTENDER DIGITAL PROCUREMENT - MOLDOVA
Slovak Republic - International Investment Bank Technical Assistance Fund
Presentation transcript:

ORIO Project Plan Procurement Bas Schilperoort Opening slide

ORIO procurement ODA money Untied aid Goods and services for the project should be purchased in a transparent and efficient manner in accordance with legislation in the Applicant's country, the OECD Good Procurement Practices for Official Development Assistance, CSR compliance form: OECD Guidelines for Multinational Enterprises (edition 2011). IFC Performance Standards Conventions of the International Labour Organisation

Procurement plan Procurement guidelines: Describe the procurement method and approach for each of the phases for goods and services, including the partners' division of roles. What type of tender procedure (International Competitive Bidding, Limited International Bidding, National Competitive Bidding) will be used or, in case of direct negotiations, how will the firm be selected? Explain how the procurement method complies with local procurement rules, OECD Good Procurement Practices for Official Development Assistance

Procurement plan # Name of package Original price of package in Grant Arrangement Method of ' selection Contractors' selection time Contract impl. time Sources of finance Type of contract EUR local currency 1   ICB/NCB/ Direct app. Q. Year… # months ORIO/CA donor/ loan works, goods services 2 3 4 5 Total - Procurement plan

Procurement plan (example) No. Name of package Budget Method of contractors' selection and bidding methods Contractors' selection time Contract implementation time Sources of finance % Type of contract 1 Project coordination and supervision 3.533.544 ICB Q3 2015 48 months ORIO (35%) + MioB (65%) Services 2 Construction Works Section A (Dalb-Gdal) 42.910.395 Q2 2016 22 months Works 3 Construction Works Section B (Chag-Gestamova) 36.713.720 33 months 4 Construction Works Section C (Duurtuu-Daga) 31.364.977 5 Operation & Maintenance ( All 3 Packages) 4.263.440 NCB Q4 2016   Total 123.786.076 EUR 1= SEN 65.48

No objection process ORIO “no objection” needed for next step in procurement process: The complete draft set of tender/bidding documents including: media for notice, draft contracts and proposed independent engineer or employers representative Tender evaluation report Final draft contract prior to signing

Type of contract Reflects the structure of the project; Affects the procurement process; Reflects the organisation of the imlementation of the project and the rights and obligations of the client and the contractor. Use internationally accepted standards.

Supervision Works contracts > EUR 2.5 million Contracted before start tender procedure works contract Employed by client, but acts in the interest of the project Main responsibility: Supervise implementation of the contract. Additional: CSR Preparation of progress and monitoring reports for CA / ORIO

Questions? Final slide of the general presentation.