Patricia Baquero, Sr. Procurement Specialist February 27, 2008

Slides:



Advertisements
Similar presentations
European Union Cohesion Policy
Advertisements

ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
Financial Management in projects involving Output- based Aid Xavier Chauvot de Beauchêne GPOBA SDN Week Washington, DC February 27, 2008.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – February 2004.
Company LOGO Performance- or Output-Based Procurement (PBP): Basics and Applications in Bank Projects Patricia Baquero
Flowchart on Procurement Guidance for a proposed OBA scheme Is the project involving an existing service provider (SP) ? YES NO PROJECT PREPARATION Are.
PRE-AUDIT/POST AUDIT PRESENTATION
MODULE 8 MONITORING INDIANA HPRP Training 1. Role of Independent Financial Monitors 2 IHCDA is retaining an independent accounting firm to monitor its.
Very Small-Value Procurement Under World Bank/IDA Small Grants, Loans and Credits Zagreb Regional Procurement Training Feb. 27 – March 3, 2006.
ARMENIA: OBA SCHEME FOR PROVISION OF GAS AND HEATING GPOBA SDN week Washington D.C. February, 2008.
Practical Information and Guidance to Applicants Green Industry Innovation Programme Bulgaria Official Launch, Sofia, 4 th December 2012 Practical Information.
This project is funded by the EUAnd implemented by a consortium led by MWH Expenditure verification Estonia Latvia Russia ENPI CBC Programme Project Management.
Key issues for the Grant Scheme on Green Investments / Requirements for an effective and transparent Grants scheme management Lucian FLOREA 30 April 2009.
SEMINAR on the EEA Financial Mechanism THE EUROPEAN COMMISSION DIRECTORATE- GENERAL REGIONAL POLICY Brussels 13 June 2005 Control and Audit Nicholas Martyn.
Designing Output-Based Aid Projects. Designing OBA and SIB Projects Basic Elements A. A.Determining the output: What service is to be provided? B. B.Reaching.
OPCPR- 03/26/20081 Procurement Under OP/BP 8.0 This presentation will cover…  Organizational and Institutional Support  Simplified Procurement Arrangements.
Statutory Audit of SSA Accounts for A PROGRAMME FOR UNIVERSAL ELEMENTARY EDUCATION MANUAL ON FINANCIAL MANAGEMENT AND PROCUREMENT Ministry of Human.
Legal Issues in design, preparation and implementation of projects involving Output-based Aid Legal Issues in design, preparation and implementation of.
Islamic Financial Accounting Standard-1
Innovative funding for infrastructure services: the use of Output Based Aid in the Honduras water sector Cledan Mandri-Perrott Infrastructure, Economics.
Safeguard Training Workshop Zagreb, Croatia May 7, 2009 Ruxandra Floroiu (Environmental Engineer)
BSBPMG505A Manage Project Quality Manage Project Quality Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG505A.
Designing and Implementing an Output- Based Aid (OBA) Project in the Bank Patricia Veevers-Carter, Program Manager Global Partnership on Output-Based Aid.
Mainstreaming OBA in the Bank: Urban and Energy Examples Patricia Veevers-Carter Program Manager Global Partnership on Output-Based Aid (GPOBA) Finance,
WSSB Capacity Enhancement Workshops 1 Session 2: Legal & Institutional Background for Management of Small-Town Water Systems.
OBA to date: Lessons, Challenges and Mainstreaming Yogita Mumssen Infrastructure Economist Global Partnership on Output-Based Aid (GPOBA) Finance, Economics.
Quality Management Systems FIETA Providers Herman Letoka ETQA MANAGER.
FM for Specialized Operations Fiduciary Forum’08 Washington DC.
OUTPUT BASED AID (OBA) Financial Management Perspective Saidou Diop Financial Management Specialist Senegal and The Gambia Co AFTFM The World Bank Washington.
April Why a New Instrument? Change in client demand: Clients want Bank support for government’s own programs and increased focus on results. This.
FOURTH AFRICA CENTERS OF EXCELLENCE (ACE) PROJECT WORKSHOP FIDUCIARY COMPLIANCE – PROCUREMENT November 17-19, 2015 Cotonou Presented by : Wole Afuye &
GPOBA and Conclusions Patricia Veevers-Carter, Program Manager Global Partnership on Output-Based Aid (GPOBA) Finance, Economics and Urban Development.
Procurement in SWAps Seminar on Procurement of Goods, Works and Consultancy Contracts financed from World Bank Loans and IDA Credits, February 27 - March.
BOS 1 Procurement of Goods and Works Asian Development Bank Business Opportunities.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
USAID/West Africa’s Trade And Investment Hub Laurencia Tettey Grants Manager, Trade Hub Aminata Mbaye DCOP Trade Hub April 12 – 13, 2016 AGOA/Trade Resource.
Procurement Issues in Structuring OBA Projects: Guidance Note for Staff Procurement Issues in Structuring OBA Projects: Guidance Note for Staff Xavier.
Roland Gilbert BSc MRICS; Prince 2 Practitioner
Procurement Process WFP Logistics, We Deliver.
Sound Financial Management
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Working with your AoA Project Officer
Bangladesh access to sanitation
Asha Ayoung Lead Procurement Specialist, OPCPR
2016 Procurement Framework Mandatory Direct Payment & Beneficial Ownership Private Sector seminar April 2018.
Engineering Processes
PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE
Role & Responsibilities
Management Verifications & Sampling Methods
April 2011.
INTERREG IPA CBC “GREECE ALBANIA ”
Preparatory Action 2011 European Voluntary Humanitarian Aid Corps Call for proposal
Procurement Plan and Procedures Code of Standards of Conduct
Multijurisdictional Agreements
Design-Build Acquisition and Contract Incentives July 19, 2018
PROCUREMENT POLICIES AND GUIDELINES
UN – WB Fiduciary Principles Accord
Internal controls 01-Nov-2017.
WORLD BANK PROCUREMENT PLANNING.
Management Verifications & Sampling Methods
The evaluation process
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Expert Panel Medical Diagnostic Imaging Specialist Consultants
dcsdgrantaid.com February 2019
Design-Build Acquisition and Contract Incentives May 9, 2019
ACCESS TO SUSTAINABLE ENERGY PROJECT
Africa Centers of Excellence Project Financial Management
Slovak Republic - International Investment Bank Technical Assistance Fund
Africa Centers of Excellence (ACE II) Project Financial & Disbursement Management NAIROBI, May 13 14,2019.
Presentation transcript:

Patricia Baquero, Sr. Procurement Specialist February 27, 2008 Designing and Implementing an Output-Based Aid (OBA) Project in the Bank: Understanding the Procurement Process Patricia Baquero, Sr. Procurement Specialist February 27, 2008

Guidance Note for Procurement Staff on Procurement Issues in OBA Projects Financed by the World Bank Developed jointly by GPOBA, FEU & OPCPR Incorporates lessons learned from procurement assessments conducted under OBA pilot regional operations & peer reviewer comments Provides guidance to PS/PAS on how to ensure compliance with the Procurement Guidelines Also provides checklist for procurement capacity assessment of incumbent service providers Includes flowchart showing different scenarios and actions required by PS/PAS

Key Issues in Guidance Note 1/3 OBA subsidy levels determined through Competitive process to select a service provider (SP), or Establishment of standard costs or agreement on a unit cost schedule (verified by independent consultants) Usual award criteria for competitive selection of SP Least subsidy required per pre-determined output, Greatest coverage per fixed offered subsidy, Least connection cost per fixed offered subsidy, or Combinations of the above Payment of the OBA Subsidy On output delivery - upon independent verification of pre-defined output(s) In pre-agreed amount for the specified service – regardless of actual cost

Key Issues in Guidance Note 2/3 Types of operations with Bank-financed OBA components Projects where there is no existing service provider [Para. 3.13 (a) of Procurement Guidelines] SP to be selected under “an ICB process acceptable to the Bank” (meeting procurement principles; not necessarily Bank ICB process and may include NCB if conditions grant it) SP so selected is free to use own procedures to procure inputs (goods, works & services) required to produce the outputs on which basis the OBA disbursement will be made Projects where there is already an existing (incumbent) service provider [Para. 3.13 (b) of Procurement Guidelines]

Key Issues in Guidance Note 3/3 Projects where there is already an existing (incumbent) service provider If SP selected under an ICB process acceptable to the Bank, SP free to use own procedures to procure inputs required to produce outputs If SP not selected under an ICB process acceptable to the Bank, SP shall procure inputs using Bank ICB procedures If SP not selected under an ICB process acceptable to the Bank but Incumbent SP is privately- or independent government-owned, Incumbent SP is engaged in expansion of an existing system, and Upon assessment, SP procurement systems & capacity are deemed acceptable and adequate, then Incumbent SP free to use its own procedures to procure inputs required to produce outputs, and Bank may conduct post-reviews to ensure assessed conditions remain unchanged (per OPCS OM of Nov. 7, 2005)