Update on the PSB Cooling and Ventilation Systems

Slides:



Advertisements
Similar presentations
Stem Challenge Energy management systems, CHP, Harvester tank, green roofs and underfloor heating. 1.
Advertisements

Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Equation solvers Matlab Free versions / open source codes: –Scilab MathCad: Mathematica:
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
IT-4103/EN Bidder’s conference Technical Specification for the Design, Supply, Installation and Commissioning of an HVAC system, a Smoke Extraction system.
EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group.
N O R T H A M E R I C A C O M M E R C I A L TDP
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
Cooling Loads. Critical System P&ID Critical system Main issues Oversized chillers Issues with switch over By-pass valve AHU5A/B? Looking at the T and.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
PSB Beam Dump Cooling Constraints Glen Mason EN-CV 30 August 2012.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Cooling and Ventilation Activities M. Battistin – EN/CV/PJ IEFC Workshop th March 2012 « CONSOLIDATION and UPGRADE PLANS for the INJECTOR COMPLEX.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
LS2 Cooling & Ventilation Activities M. Battistin EN/CV Acknowledgements: P. Barriere, R. Bozzi, A. Broche, O. Crespo,
Building 180 NORMATEF TEST FACILITY Demineralized cooling water station upgrade R. Bozzi / EN-CV.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
N-TOF review HVAC and cooling systems Proposal to be validated by the project CERN TS/CV 13th February 2008.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
S A Griffiths CM42 June 2015 Electrical & Control.
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Demineralised water cooling system
EN-CV activities for LHC during LS2
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Lecture Objectives: Discuss Final Project
CERN Data Centre ‘Building 513 on the Meyrin Site’
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
Cooling systems for HL-LHC (WP17.3)
CEDAR Detector Ventilation System Review
EN-CV interventions during EYETS for PS and PSB
COOLING & VENTILATION INFRASTRUCTURE
Lecture Objectives: Answer questions related to HW 4
ATLAS Thermosiphon Electrical Distribution and Run Modes
East Area Cooling & Ventilation Status
Insertable B Layer Cooling System
EN-CV: P8 systems and Detector Cooling
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Discuss HW4 parts
Maintenance at ALBA facility: Strategy for the conventional services
Aziz AMAMOU EACM – 21th May 2019
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

Update on the PSB Cooling and Ventilation Systems LIU-PSB Working Group Meeting, 01.08.2017 Work Packages: Cooling (Demi Water) Ventilation Chilled water plant Gabor Petrika EN-CV

Scope: Progress report: New cooling towers; User Requirements Critical user branch P&ID Hydraulic Modifications 3D Integration Bdg. 361 Cooling towers Cooling centre Preliminary Planning Scope: New cooling towers; New cooling station (pumps, heat exchanges…); New electrical & control system; New instrumentation; Distribution network modifications Pressure rating upgrade; Progress report: UR + WP (EDMS 1758628) Preliminary P&ID P&ID Bdg. 361 - 3D integration Bdg. 141 & Bdg. 237 – 3D Implementation Engineering Specification → 10.2017 (started 06.2017) → 11.2017 (started 08.2017) → 12.2017

Hydraulic modifications Dedicated branch for the critical users Cooling Scope Progress report User Requirements Critical user branch P&ID Hydraulic Modifications 3D Integration Bdg. 361 Cooling towers Cooling centre Preliminary Planning UR: New equipment's with high pressure drop + 20% load Tunnel / Surface circuit separation (RP) PN16 PN25 Hydraulic modifications Dedicated branch for the critical users

Critical user locations New hydraulic branch Cooling Scope Progress report User Requirements Critical user branch P&ID Hydraulic Modifications 3D Integration Bdg. 361 Cooling towers Cooling centre Preliminary Planning Critical user locations New hydraulic branch Tunnel circuit 153 m3/h Tunnel circuit Critical users 149 m3/h

Roof 237 Bdg 141 Bdg 237 Surface Circuit 85m3/h Tunnel circuit Cooling Scope Progress report User Requirements Critical user branch P&ID Hydraulic Modifications 3D Integration Bdg. 361 Cooling towers Cooling centre Preliminary Planning Cooling towers 5 MW Bdg 237 Surface Circuit 85m3/h 440 kW Tunnel circuit 153 m3/h 4500 kW Tunnel circuit Critical users 149 m3/h

New pipes Surface Circuit Existing pipes Cooling Scope Progress report User Requirements Critical user branch P&ID Hydraulic Modifications 3D Integration Bdg. 361 Cooling towers Cooling centre Preliminary Planning Existing pipes New pipes Surface Circuit

New pipes Tunnel Critical users New pipes Surface Circuit Cooling Scope Progress report User Requirements Critical user branch P&ID Hydraulic Modifications 3D Integration Bdg. 361 Cooling towers Cooling centre Preliminary Planning Existing pipes New pipes Surface Circuit New pipes Tunnel Critical users

New cooling station Bdg. 237 / 141 Scope Progress report User Requirements Critical user branch P&ID Hydraulic Modifications 3D Integration Bdg. 361 Cooling towers Cooling centre Preliminary Planning Existing pipes Tunnel Primary circuit Bat. 141 Secondary circuit 361 Booster Bat. 237 141 New Pipes Surface Piping gallery 237 Chillers Primary New Cooling Towers New cooling towers Bdg. 237 New cooling station Bdg. 237 / 141

NO Cooling Cooling Scope Progress report User Requirements Critical user branch P&ID Hydraulic Modifications 3D Integration Bdg. 361 Cooling towers Cooling centre Preliminary Planning NO Cooling

Progress report: Scope: UR + WP (EDMS …) Preliminary P&ID → 08.2017 Ventilation Scope Progress report Heat loads, Air condition Filtration Smoke extraction Discharge Air flow pattern Op. modes AHU refurbishment Redundancy Temporary ventilation Planning Scope: New AHUs; Filtration; New, separated smoke extraction system; New electrical & control system; New instrumentation; Existing air distribution network; Progress report: UR + WP (EDMS …) Preliminary P&ID P&ID 3D integration Engineering Specification → 08.2017 → 12.2017 → 12.2017 → 02.2018

Data provided by the users Ventilation Scope Progress report Heat loads, Air condition Filtration Smoke extraction Discharge Air flow pattern Op. modes AHU refurbishment Redundancy Temporary ventilation Planning Area User group Heat load Comments Data provided by the users EN-EL Long term measurement EN-CV on-site measurement EN-EL + EN-CV On-site measurement Surface RF 196 kW User data confirmed EPC 150 kW Racks - 600 W/rack Mean value Other 10 kW Estimated Tunnel Water cooled magnets 177 kW (5% of cooling) Air cooled magnets 20 kW Kickers, septums + 50 kW Increase RF cavities 5 kW Transformers 3 kW Vacuum + B. ins. 15 kW

Heat loads → Surface: 511 kW; Tunnel: 390 kW; Ventilation Scope Progress report Heat loads, Air condition Filtration Smoke extraction Discharge Air flow pattern Op. modes AHU refurbishment Redundancy Temporary ventilation Planning User Data: RF → 196 kW EPC → 150 kW Air cooled magnets → 20 kW Water cooed magnets → 175 kW (5%) Kickers, septums → + 50 kW EN-EL and EN-CV measurements: Racks → 600 W/rack Heat loads → Surface: 511 kW; Tunnel: 390 kW; Room temperature: 25 ±5°C / dew point < 14 °C

PSB Ventilation – Air filters Scope Progress report Heat loads, Air condition Filtration Smoke extraction Discharge Air flow pattern Op. modes AHU refurbishment Redundancy Temporary ventilation Planning PSB Ventilation – Air filters Area Today Upgraded Surface supply G4 G3 + F8 Surface discharge w/o Surface smoke ext. Tunnel supply Tunnel discharge F8 Tunnel smoke ext. Vertical discharge min. 5 [m/s] PSB – Smoke extraction Area Today Upgraded Surface smoke extraction Smoke extractor fan in the mechanical room Smoke extractor fan on the roof Surface fresh air ICO fire Via AHU Supply fan + openings Tunnel smoke extraction Tunnel fresh air ICO fire Supply fan Ventilation and smoke extraction systems shall be separated!

Ventilation Scope Progress report Heat loads, Air condition Filtration Smoke extraction Discharge Air flow pattern Op. modes AHU refurbishment Redundancy Temporary ventilation Planning

Ventilation Scope Progress report Heat loads, Air condition Filtration Smoke extraction Discharge Air flow pattern Op. modes AHU refurbishment Redundancy Temporary ventilation Planning

Terminal heater units to be dismantled AHU – concrete structure Ventilation Scope Progress report Heat loads, Air condition Filtration Smoke extraction Discharge Air flow pattern Op. modes AHU refurbishment Redundancy Temporary ventilation Planning Terminal heater units to be dismantled AHU – concrete structure AHU refurbishment: Demolishing only the front concrete walls of each AHU. Refurbishment the remaining concrete structures, ensure leak tightness and cleaning by a new inner surface envelope. No changes in the steel support structure. Installing new AHU modules (dampers, filters, fans etc.) inside the remaining, refurbished concrete structure. Front walls: installing new panel structure.

Temporary ventilation Scope Progress report Heat loads, Air condition Filtration Smoke extraction Discharge Air flow pattern Op. modes AHU refurbishment Redundancy Temporary ventilation Preliminary Planning Temporary ventilation