advices for advancing the productivity of the construction industry:

Slides:



Advertisements
Similar presentations
Construction Technologies. The study and application of building or assembling a structure. All people are affected in one way or another by construction.
Advertisements

The Modular Building Institute is pleased to present members of NAFIS with an opportunity to: RETHINK CONSTRUCTION.
Industrialization of Electrical Contracting Supply Chain and Logistics Management Santa Clara University School of Engineering Department of Civil Engineering.
PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Company Profile National specialized in steel-House technology exploitation, designing, construction, National has had invested 2 million USD at first.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Strategic Decisions (Part II)
Chapter 12 Pricing Masonry Carpentry, and Finishes Work.
Flexible Manufacturing Systems (FMS)
Ch 1 Introduction Sections: Production Systems
INDUSTRIAL & SYSTEMS ENGINEERING
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
David O’Sullivan Industrial Automation (IE423 Computer Integrated Manufacturing) (IE215 Design and Make) David O’Sullivan
What is a Hallmark Modular Home? A Hallmark Modular Home is designed, engineered and built in the controlled environment of a modern factory. It is computer.
© 2010 Fluor. All Rights Reserved. 17 Terawatts to 30 Terawatts – a building perspective February 2, 2015.
B & M Industrial Services “The Leader in Industrial Contract Services”
BUILT TO LAST Assessing the Benefits of Modular Construction for Military Applications.
Dr. Hany Abd Elshakour 9/7/ :22 PM1. Dr. Hany Abd Elshakour 9/7/ :22 PM2 Engineering Project: Participants and Life Cycle.
THE MITCHELL FRAMING SYSTEM A building system that encourages homeowners to have a direct involvement in driving building growth and expansio n Neal Mitchell.
Construction Contracts and Project Delivery Methods
Construction Engineering and Management 1 Cost Benefits Structural Safety Architect Feasibility Assessment of architects Functional Aesthetic constructability.
Object-Oriented Software Engineering Practical Software Development using UML and Java Chapter 1: Software and Software Engineering.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
CHAPTER 1 MANAGEMENT IN THE ENGINEERING AND CONSTRUCTION INDUSTRY CONSTRUCTION'S FUTURE:  Increasing size of projects & Organizations  Increasing technological.
Construction Eng 221 Project Management and Administration.
Printing: This poster is 48” wide by 36” high. It’s designed to be printed on a large-format printer. Customizing the Content: The placeholders in this.
Overview of Building Information Modeling What does it mean for Civil Engineering?
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
BCN 4708 Fall 2008 Chapter 1 The Construction Industry.
Manufacturing Systems at the enterprise level
PRODUCTION MANAGEMENT SOFTWARE. WHICH DO YOU PREFER? 2.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
Aim - Customer satisfaction at optimum cost. PRODUCTION MANAGMENT.
The Benefits of Modular Offices & Prefabricated Buildings For Businesses.
Project Stakeholder Integration in Off-Site Construction May 24, 2016 Partners in Progress.
Chapter 7: Manufacturing Processes
Report #3 Scheduling in Modular Construction
DESIGN TOOLS UPDATE.
Design – BIM – Build – Operate
The Stuckeman Family Building
Profession Practices (ECIV-5105)
CIM Modeling for E&U - (Short Version)
Maintenance Scheduling
The Times 100 Business Case Studies
The University of Jordan Mechatronics Engineering Department
Graduation Project (II): Operations Improvement at Mhanna Factory
Allen Dennis Sr. Program Manager Electrification Program
GIS Day Site Layout Optimization Using GIS Sulyn Gomez Mohd Samrah
Chapter 16 Nursing Informatics: Improving Workflow and Meaningful Use
How do we address the skills crisis?
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Operations Management & Planning
Module 5: Facilitating Compliance with Prefabrication
The Evolution of Building Methods Traditional Methods
Facilities Planning and Design Course code:
MANUFACTURING SYSTEMS
ARCH 435 PROJECT MANAGEMENT
Purchasing and Supply Chain Management
Manufacturing Systems at the enterprise level
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
Dominant Improvements of BIM Modeling Services and Building Information Modeling Firms BIM Modeling Services Building Information Modeling Firms.
DBIA Manual of Practice
Offsite Construction Manufacturing BACH
ABCPhD Doctoral Program in architecture, built environment and construction engineering ABCPhD Call4Scholarship 34 RESEARCH TOPIC: Automation, Robotics.
Ch 1 Introduction Sections: Production Systems
Presentation transcript:

advices for advancing the productivity of the construction industry: 1. Widespread deployment of Building Information Modeling (BIM)   2. Improved job-site efficiency 3. Greater use of prefabrication, preassembly, modularization, and off-site fabrication techniques. 4. Innovative, widespread use of demonstration installations 5. Effective performance measurement to drive efficiency and support innovation.

Manufacturing building components off-site: More controlled conditions for weather, quality control, improved supervision of labor, easier access to tools, and fewer material deliveries.   Fewer job-site environmental impacts Compressed project schedules Fewer conflicts in work crew scheduling and better sequencing of crafts persons. Reduced requirements for on-site materials storage, and fewer losses of materials. Increased workers safety.

Definition of Modular Construction: A resource efficient, off-site delivery method to construct code-compliant buildings in a quality-controlled setting

Advantages of Modular Construction: Less Materials Waste Less Material Exposure to Inclement Weather Less Site Disturbance Safer Construction Flexibility Adaptability Built to Code With Shorter Build Times

Modular Building Usage: Permanent Modular Construction Temporary Buildings Education Healthcare Commercial Housing Office Administration Security Emergency Workforce housing Assembling the entire fleet of modules rely on optimization of the crane position Based on one case study in Muhlenberg college in Pennsylvania , over 90 modular units were delivered in a record time of 10 days by optimizing of crane position.

Issues and Impediments about Modular Construction: Typically 40-50% of modular building construction is left to be completed in the field Geographic location of the factory Engineering requirements Specific dimension or loading limitations due to transportation constraints Changes in design during manufacturing can be difficult and expensive to accommodate. the complexity of transportation activity is increased in modular construction. The increased demand for very effective coordination and communication among participants For a factory and manufacturer the repetition of prefabricated components is essential in order to meet quantity for cost effectiveness.

The regulations set down by transport Quebec:

Suitable project delivery system in Modular Construction: Most modular building projects are fixed-price contracts many modular construction projects are being completed faster and for less money by utilizing Design-Build or Construction Manager at Risk(CMR). most architects are not experienced enough in the modular construction when modular manufacturing is responsible for the design or is involved the project is more likely to be successful. If projects use Design-Build: direct line of communication between the owner and modular manufacturer costs are easier to control workload upon the owner is increased publicly funded projects

In case of using Design-Bid-Build: amount of involvement of owner in the project is reduced if the designer firm is not familiar with modular construction it could bring high initial cost to the project because of additional layers of communication the project duration would be increased in case of using CMR: it works very well when the modular company is either the construction manager or is a key subcontractor with a design assist role.

Implementation of BIM in Modular Construction: The MEP coordination and fabrication process extensive demand of pre project planning Implementation of BIM systems in modular construction: Visualization Modeling Code reviews Fabrication/ shop drawings Communication Cost estimating Construction sequences Conflict, interference and collision detection

six factors which influence the productivity of Nuclear Power Plants: low material availability low tool availability high rework rates needless interference with other crews overcrowded work areas and time consuming inspection delays Reducing the amount of on-site labor with factory produced power plant modules

References: “Improving Construction efficiency & productivity with Modular Construction” , by Modular Building Institute Christopher W.Lapp , Michael W.Golay,1997, “ Modular Design and Construction techniques for nuclear power plants”,nuclear engineering and design  Na Lu ,Thomas Korman , 2010 , “Implementation of Building Information Modeling (BIM)in Modular Construction: Benefits and Challenges” , Construction Research Congress 2010  J.Olearczyk,Mohamed Al-Hussein,Ahmed Bouferguène,2014, “Evolution of the crane selection and on-site utilization process for modular construction multilifts” , Automation in Construction 43 (2014) 59–72  Calvin van Mulligen, 2012, Master thesis, “Improving the efficiency, productivity and cost-effectiveness of modular design and construction processes”, University of Alberta Lara Jaillon,C.S.Poon, 2009, “ the evolution of prefabricated residential building systems in Hong Kong: A review of the public and private sector’, Automation in Construction18(2009)239-248 Thesis by Stefan J. Wiedeman ,McGill University, “ Modular prefabrication versus conventional construction as a cost effective alternative for the construction of single family detached housing in the Montreal area” Thesis by Yasir Kadhim, University of New Brunswick,” Analysis of the adoption and implementation of virtual reality technologies for modular construction”