Bert Peters Chair, Path Operator Task Force

Slides:



Advertisements
Similar presentations
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Advertisements

WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
Unscheduled Flow Administrative Subcommittee Report David Lemmons March 27, 2013 Salt Lake City, UT.
Western Electricity Coordinating Council Status of NERC Standards Activity WECC PCC Meeting March 6-7, 2008.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
POTF Status update.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
Phase II – Analyze the Identified Issues from Perspectives of Alternative Approaches Determine which of the identified issues remain under alternate approaches.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
Path Operator Task Force Recommendation
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
Path Operator Task Force Report Joint Guidance Committee December 1, 2014.
Path Operator Implementation Team Report to OC March 25, 2015.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
WECC Path Concept Task Force Report to PCC March 26, 2014 Chifong Thomas.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Peak RCCo Performance Metrics Draft –November 2013.
JJ Jamieson MIC Chair MIC Report for ISAS August 2014 Salt Lake City.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Andy Meyers Bonneville Power Administration Market Interface Committee Update ISAS April 2015 Salt Lake City, UT.
Andy Meyers Bonneville Power Administration Operating Committee Update ISAS April 2015 Salt Lake City, UT.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
JJ Jamieson MIC Chair MIC 2015 GOALS March 24, 2015 SLC.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC – NERC Standards Update
Kenneth Silver Los Angeles Department of Water & Power
RASRS Report to Operating Committee March 21, 2017
Interchange Scheduling & Accounting Subcommittee
Brett Wangen Director of Engineering, Peak Reliability
WECC Regional Standards Update
Path Operator Implementation Task Force
Updates to the Path Rating Process for Approval by the PCC
Western Electricity Coordinating Council
Unscheduled Flow Administrative Subcommittee MIC/OC Report
Project WECC-0100 Update Load Modeling Task Force
Determine Facility Ratings, SOLs and Transfer Capabilities
NERC Cyber Security Standards Pre-Ballot Review
Mgr. Interconnection Reliability Initiatives
WECC RC Forum October 12, 2018.
Enhanced Curtailment Calculator (ECC)
Path Operator Task Force Kickoff April 3, 2013 Webinar
Project Definition of Bulk Electric System
Planning Coordinator Gap Update March 25, 2014
OC Report ISAS Subcommittee August 2015 Salt Lake City, UT
NERC Reliability Standards Development Plan
Project WECC-0100 Update Reliability Subcommittee
Steve Rueckert – Director of Standards
Path Operator Task Force Kickoff April 3, 2013 Webinar
Eric Baran, WIRAB Staff April 30, 2018
WECC RC Forum October 12, 2018.
NERC Reliability Standards Development Plan
Project WECC-0100 Update Load Modeling Task Force
Variable Generation Subcommittee Update to PCC
WECC – NERC Standards Update
Bert Peters Chair, Path Operator Task Force
Presentation transcript:

Bert Peters Chair, Path Operator Task Force Path Operator Task Force Update March 26, 2014 Salt Lake City, UT

Path Operations Issues The Path SOL Concept muddies the waters between reliability limitations and commercial limitations. Path SOLs do not take into consideration real-time tools and information. The Path SOL paradigm potentially disguises other critical limitations The Path SOL paradigm results in “Chasing the SOL” The Path SOL paradigm results in increased TOP compliance risk

Path Operations Issues (cont’d) The Path SOL paradigm pre-supposes the need for monitoring all WECC Paths The Path SOL concept is extraneous and duplicative in light of the revised SOL Methodology The Path Operators and the TOPs have limited ability to manage Path SOL exceedances Path operators have responsibility without the authority to mitigate path exceedances. Path Operator is not a NERC defined term.

Alternatives Considered Define the Authority of Path Operator Eliminate Path Operator Flow Based Methodology Peak Reliability(PR)/RC as Path Operator Develop Coordinate procedures/agreements

Alternatives Considered (cont’d) Split Path Operator Role by task Rater: Responsible for developing the TTC Monitor: Monitors system performance and real-time flow Response Initiator: Initiates the response to pre and post contingency SOL exceedances. Action Taker(s): responsible for taking action (i.e. cutting schedules, generation redispatch, shedding load, reconfiguring the system, operating phase shifters etc.) Overseer/Director: Oversees/monitors/directs at a higher level to ensure actions are taken (Peak RC)

Brief Concept The “OTC/Path SOL” concept is retired. SOLs are now simply BES Facility Ratings, voltage limits, and stability limits. All of which are not to be exceeded in both the pre- and post-contingency state. Paths do have Transfer Capability as defined by NERC. But the TTC is separate and distinct from SOLs (though overlap may occur for stability limits). TTC is not the SOL itself (as in the current paradigm); rather, TTC respects SOLs. Commercial considerations are upheld, but they do not determine the SOL. Commercial considerations, like the TTC, respect SOLs. More complete description and explanations included in the “Draft” white paper located (link).

Next Steps Reach out to the following entities: Peak Reliability Board of Directors. WECC Board WECC Standing Committees (i.e. Operating Committee, Planning Coordination Committee, and Market Interface Committee). WECC Chief Dispatchers. Other WECC groups or industry groups concerned with operations of the Bulk Electric System.

Next Steps WECC OC concurrence adoption to memorialize the recommendations.   Develop criteria to outline what facilities are included in TOP-007-WECC-1. This will facilitate the modification of Attachment 1. Assemble WECC standards drafting team to retire TOP-007-WECC-1. Soliciting Industry comments to the Draft white paper.

Questions? Bert Peters, APS 602-250-1112 Albert.peters@aps.com