EuCARD-2 4th Annual Meeting Preparation Final Reporting

Slides:



Advertisements
Similar presentations
Science and Policy Integration for COastal Systems Assessment
Advertisements

6. September 2004 Technological Implementation Plan (TIP)
Introduction to EuCARD2 & WP4: Applications of Accelerators AccApplic  EuCARD2  WP4: Applications of Accelerators  The applications  Current workshops.
PREPARE Final reporting period Months February 2013 to 31 July 2014.
Gloria Peasso APRE Communication & Dissemination of project results Sunny Beach, 19-20/09/2013.
AIDA Governing Board meeting 11 Dec 2014 Final Project Reporting 1 AIDA Governing Board meeting, 11 Dec 2014.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT Progress / objectives (WP and project level) Progress / milestones (WP and project level) Progress / deliverables.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
NOV-3733-SL-9715 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Communication.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
DIRAC Phase 1 Reporting, Dec. 1 st, 2005 Reporting to the Commission Periodic Reports Interim Activity Reports Project Deliverables Final Reports.
EuCARD2  Third in a series of FP6/7 IAs on Accelerator R&D: Coordinated Accelerator Research in Europe(FP6) to coordinated by CEA - 22 partners.
Welcome! Rob Edgecock University of Huddersfield, UK  EuCARD2  WP4: Applications of Accelerators  This workshop  A few practical details EuCARD-2 is.
S 1 Annual Meeting 2013 Crediting EC contribution Open access requirements Chiara Bearzotti NACLIM project manager.
Aims of the Workshop  EuCARD2  WP4: Applications of Accelerators  Past workshops  Future workshops  Plans  Aims of this workshop EuCARD-2 is co-funded.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 3rd Annual.
1 EuCARD2/WP 12.4, R.M. Jones, Cockcroft Inst., 23 rd November 2015 WP 12.4 HOM Diagnostics Roger M. Jones Contribution from Cockcroft Institute and The.
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No Advanced European.
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WP8 DISSEMINATION AND COMMUNICATION Przemysław Dana ASM – Market Research and Analysis Centre.
ARTEMIS Industry Association Title Presentation - 1 e.g. SCALOPES e.g. SCAlable LOw Power Embedded PlatformS.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
AMICI WP1 – Management, coordination and dissemination
WP3 - Evaluation and proposal selection
BENCH-CAN Internal evaluation 2nd semester
EC project periodic and continuous reporting
AVA Communication Magda Klimontowska University of Liverpool
European Network for Novel Accelerators (EuroNNAc)
From EuCARD-2 to ARIES TIARA Meeting, Warsaw, 19 June 2017
Venue: WIIW, Vienna Loredana Marmora and Margaret Pesuit, ISIS
Almost there … …but not just yet
Roger M. Jones The University of Manchester and Cockcroft Inst.
Project Management Financial management
Accelerator Research and Innovation for European Science and Society
Governing Board Meeting Maria MAIA
Annual Report Instructions
WP8: Outreach and Liaison
EuCARD2 WP11 Topical Meeting
EQAVET Annual Network Meeting
FP7 SCIENTIFIC NEGOTIATIONS Astrid Kaemena European Commission
PLUG-N-HARVEST ID: H2020-EU
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
INTELLECTUAL PROPERTY RIGHTS (IPR) IN FP7
AMICI WP1 – Management, coordination and dissemination
Communication and Dissemination Obligations, Guidelines, Best Practice
Technical and Financial Reporting
WP2-DCO Dissemination, Communication & Outreach Month 3 Report
Presentation transcript:

EuCARD-2 4th Annual Meeting Preparation Final Reporting M. Vretenar, Coordinator Glasgow, 28 March 2017

The final sprint Only 1 month to go before the end of the project, all reporting to be completed by end of June. Overload of project management work at CERN (deliverables, final reporting, last meeting) with a reduced support team (new assistant, new communication manager). We try to cope as we can (additional temporary assistant hired from April 1st, complete transfer of communication responsibilities to J. Toes). We’ll make our best but we count on the collaboration of all partners to successfully complete the project.

Deliverable progress 45/63 completed 2 delayed and justified to EC: 13.5(FLASH NRF cavity and FB system, M36 to M48) and 10.4 (Magnet cold test, M44 to M48). 10 due end of February (M46), 7 received, 2 in work (Mike, Yannis), 1 expected mid-April (Ralph). M48: 5 scientific deliverables + 7 management deliverables.

Remaining deliverables 1 Deliverable 3.6 Efficient RF systems and heat recovery M46 Followed by M. Seidel. In preparation. 2 Deliverable 6.6 Low Emittance Ring Technology final report Y. Papaphilippou, in preparation 3 Deliverable 7.2 Final EuroNNAc2 report - a European roadmap will be done in April (R. Assmann) 4 Deliverable 11.3 Irradiation test results A. Rossi (received) 5 Deliverable 1.4 3rd EuCARD-2 Periodic Report M48 Maurizio with SC 6 Deliverable 1.5 Final EuCARD-2 Project Report 7 Deliverable 1.6 Final plan for use and dissemination of foreground Jennifer with SC 8 Deliverable 1.7 EuCARD-2 project monograph Ryszard (only front page & number) 9 Deliverable 8.1 Transnational Access to ICTF@STFC Roy Preece 10 D9.1 Transnational Access to HiRadMat@SPS A. Fabich 11 D9.2 Transnational Access to MagNet@CERN M. Bajko 12 Deliverable 12.10 Cavity deposited and qualified at CEA C. Antoine 13 Deliverable 12.11 Final report of task 12.3 P. McIntosh, in preparation 14 Deliverable 12.12 Report on characterisation of HOMs in XFEL coupled 3HC cryomodule Followed by P. McIntosh 15 Deliverable 12.13 Results of DAC implementation in SRF guns 16 Deliverable 13.6 Optimum beam-plasma configuration Victor Malka (received) + 2 delayed: 13.5(FLASH NRF cavity and FB system, M36 to M48) – in preparation 10.4 (Magnet cold test, M44 to M48) – L. Rossi + INFN

Milestones

Final reporting Periodic Report 3 (M36-M48): contributions due to Coordinator on 30.3, to complete by 30.4 – only few contributions received so far. Please go back home and start writing! Final Report: templates to be distributed 30.3, deadline for contributions to coordinator 15.5, to be completed by 15.6. Societal impact questionnaire: will be sent to all institutes (technical contacts!) on 10.4, deadline for reply 30.4.

Final Report Covers the whole period from M1 (May 2013) -M48 (April 2017) Due end date (30 April 2017) + 60 days = 30 June 2017 Single submission: all project deliverables/milestones+ P3 + Final Report 3 parts: Final publishable summary Plan for use and dissemination of foreground (D1.6) Societal implications (questionnaire)

Final publishable summary Will be public on the dedicated EC platform Page limit 40 pages! (max. 3 pages per WP) Should address a wide audience Parts: Executive summary (1 page) Summary of project context and objectives (4 pages) Main scientific and technical results/foregrounds (25 pages) Potential impact incl. dissemination activities (10 pages) Valeire will send templates on 30 March (yesterday…) Deadline for contributions 30 April

Final Plan for use and dissemination of foreground Section A - tables All scientific (peer-reviewed) publications relating to the foreground All dissemination activities (non-peer reviewed articles, conferences, workshops, websites, presentations, brochures, flyers, video, media briefing, thesis, posters) Section B List of applications for patents, trademarks, registered designs, etc. List of exploitable foreground Will be made public unless the project indicates otherwise! Foreground Number Type of Exploitable Foreground Description of exploitable foreground Confident ial (yes, no) Foreseen embargo date dd/mm/yy yy Exploitable product(s) or measure(s) Sector(s) of applicatio n Timetable for commercial or any other use Patents or other IPR exploitation (licences) Owner & Other Beneficiary(s) involved Its purpose How the foreground might be exploited, when and by whom IPR exploitable measures taken or intended Further research necessary, if any Potential/expected impact (quantify where possible)

Input for the Final Report The WP Coordinators have to send the following text by April 30th: WP context and objectives (1/3 of page) The main scientific and technical results of the WP (2 pages, including figures). Potential impact of the WP (1/2 page). Tables of exploitable foreground from their WP: patents, new ideas, technologies, etc. Easy job: only 3 pages and one table per WP ! For the exploitable foreground, think large, it is easier to delete than to invent!

Examples Applications for patents are self-evident. Exploitable foreground: example of EuCARD type of foreground: General advancement of knowledge, Commercial exploitation of R&D results, Exploitation of R&D results via standards, exploitation of results through EU policies, exploitation of results through (social) innovation.

Example: EuCARD Foreground

EuCARD

EuCARD

Societal implications form A form to be sent out to all beneficiaries Statistics and indicators on societal and socio-economic issues addressed by the project Project replies will not be made public by the EC

Societal impact questionnaire See AIDA example Total 6 pages