Initial Project Screening Method - Payback Period

Slides:



Advertisements
Similar presentations
Capital Budgeting.
Advertisements

PRESENT WORTH ANALYSIS
Lecture No. 23 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Contemporary Engineering Economics, 4 th edition, © 2007 Initial Project Screening Method - Payback Period Lecture No.15 Chapter 5 Contemporary Engineering.
Evaluating Business and Engineering Assets Payback Period.
MANAGERIAL ACCOUNTING
© 2012 Pearson Prentice Hall. All rights reserved. Capital Budgeting and Cost Analysis.
Capital Investments Chapter 12. Capital Budgeting How managers plan significant outlays on projects that have long-term implications such as the purchase.
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 17 Investment Analysis.
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
ACCT 2302 Fundamentals of Accounting II Spring 2011 Lecture 20 Professor Jeff Yu.
Lecture 5 Engineering Economics ENGR 3300 Department of Mechanical Engineering Inter American University of Puerto Rico Bayamon Campus Dr. Omar E. Meza.
Engineering Economy Lecture 8 Evaluating a Single Project IRR continued Payback Period.
Chapter 17 Investment Analysis
Capital Budgeting and Cost Analysis
Lecture No.15 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Evaluating Business and Engineering Assets – Part II Part II Professor C. S. Park Copyright © 2005.
Flash back before we compare mutually exclusive alternatives.
Contemporary Engineering Economics, 4 th edition, © 2007 Initial Project Screening Method - Payback Period Lecture No.15 Chapter 5 Contemporary Engineering.
Contemporary Engineering Economics, 4 th edition, © 2007 Rate of Return Analysis Lecture No. 24 Chapter 7 Contemporary Engineering Economics Copyright.
Contemporary Engineering Economics, 4 th edition, © 2007 Process of Developing Project Cash Flows Lecture No.38 Chapter 10 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
C Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, or posted to a publicly accessible website, in whole or in part.
Capital Budgeting and Investment Analysis
Engineering Economics Contemporary Engineering Economics, 5 th edition, © 2010.
8- 1  2001 Prentice Hall Business Publishing Management Accounting, 3/E, Atkinson, Banker, Kaplan, and Young Capital Budgeting Chapter 8.
Long-Term (Capital Investment) Decisions
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Project Screening Method – Payback.
Contemporary Engineering Economics, 4 th edition, © 2007 Initial Project Screening Method - Payback Period Lecture No.15 Chapter 5 Contemporary Engineering.
L14: Evaluating Business and Engineering Assets – Part II ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
Lecture No. 9 Chapter 3 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas – Equal Payment.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Only Operating and Investing Activities Lecture No. 39 Chapter 10 Contemporary.
Compound Interest Howard Godfrey, Ph.D., CPA Copyright © 2011, Dr. Howard Godfrey Edited August 3, 2011.
Part II: Evaluating business & engineering assets Ch 5: Present worth analysis Ch 6: Annual equivalence analysis Ch 7: Rate-of-return analysis.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
Chapter 12 Analyzing Project Cash Flows. Copyright ©2014 Pearson Education, Inc. All rights reserved.12-2 Slide Contents Learning Objectives 1.Identifying.
Welcome Back Atef Abuelaish1. Welcome Back Time for Any Question Atef Abuelaish2.
Part 1 : Understanding Money And Its Management (Ch1,2,3,4) Part 2: Evaluating Business and Engineering Assets (5,6,7)
Project Screening Method – Payback Period
Capital Budgeting and Cost Analysis
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
CIMA P2 Advanced Management Accounting
Rate of Return Analysis
Rate of Return Analysis
Equivalence Calculations with Continuous Payments
Equivalence Calculations with Continuous Payments
Capital Budgeting and Cost Analysis
Capital Budgeting and Cost Analysis
Interest Formulas – Equal Payment Series
Capital Budgeting 2 2.
Discounted Cash Flow Analysis
Lecture: 6 Course Code: MBF702
Chapter 6 Principles of Capital Investment
Long-Term (Capital Investment) Decisions
Capital Budgeting and Investment Analysis
10 C Strategy Management of Capital Expenditures hapter
Capital Budgeting and Cost Analysis
Chapter 7 Present Worth Analysis
Investment Appraisal A set of tools which allow a company to make an informed decision on whether or not to proceed with a given investment. These tools.
Initial Project Screening Method - Payback Period
Rate of Return Analysis
PLANNING FOR CAPITAL INVESTMENTS
PRESENT WORTH ANALYSIS Chapter 5
Capital Budgeting Techniques
AMIS 3300 Capital Budgeting.
Presentation transcript:

Initial Project Screening Method - Payback Period Lecture No.15 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010

Chapter Opening Story – GE’s Healthymagination Project GE Unveils $6 Billion Health-Unit Plan: Goal: Increase the market share in the healthcare sector. Strategies: Develop products that will lower costs, increase access and improve health-care quality. Investment required: $6 billion over six years Desired project outcome: Would help GE’s health-care unit grow at least twice as fast as the broader economy. Contemporary Engineering Economics, 5th edition, © 2010

Ultimate Questions GE’ s Point of View: Would there be enough demand for their products to justify the investment required in new facilities and marketing? What would be the potential financial risk if the actual demand is far less than its forecast or adoption of technology is too slow? If everything goes as planned, how long does it take to recover the initial investment? Contemporary Engineering Economics, 5th edition, © 2010

Bank Loan vs. Project Cash Flows Contemporary Engineering Economics, 5th edition, © 2010

Example 5.1 Describing Project Cash Flows – A Computer-Process Control Project XL Chemicals is thinking of installing a computer process control system in one of its process plants. The plant is used about 40% of the time, or 3,500 operating hours per year, to produce a proprietary demulsification chemical. During the remaining 60% of the time, it is used to produce other specialty chemicals. Annual production of the demulsification chemical amounts to 30,000 kilograms, and it sells for $15 per kilogram. Contemporary Engineering Economics, 5th edition, © 2010

Example 5.1 Describing Project Cash Flows – A Computer-Process Control Project The proposed computer process control system will cost $650,000 and is expected to provide the following specific benefits in the production of the demulsification chemical: First, the selling price of the product could be increased by $2 per kilogram because the product will be of higher purity, Second, production volumes will increase by 4,000 kilograms per year as a result of higher reaction yields, Contemporary Engineering Economics, 5th edition, © 2010

Example 5.1 Describing Project Cash Flows – A Computer-Process Control Project Third, the number of process operators can be reduced by one per shift, which represents a savings of $25 per hour, Finally, the new control system would result in additional maintenance costs of $53,000 per year and has an expected useful life of eight years. Given: The preceding cost and benefit information. Find: Net cash flow in each year over the life of the new system. Contemporary Engineering Economics, 5th edition, © 2010

Example 5.1 Describing Project Cash Flows – A Computer-Process Control Project Revenues from the price increases are 300,000 kg/year × $2/kg = $60,000/year. The added production volume at the new pricing adds revenues 4,000 kg/year × $17/kg = $68,000/year The elimination of one operator results in an annual savings of 3,500 hrs./year × $25/hr = $87,500/year Contemporary Engineering Economics, 5th edition, © 2010

Example 5.1 Describing Project Cash Flows – A Computer-Process Control Project The net benefits in each of the eight years that make up the useful lifetime of the new system are the gross benefits less the maintenance costs: $60,000 +$68,000+ $87,500-$53,0002 =$162,500/year Contemporary Engineering Economics, 5th edition, © 2010

Example 5.1 Describing Project Cash Flows – A Computer-Process Control Project Year (n) Cash Inflows (Benefits) Cash Outflows (Costs) Net Cash Flows $650,000 -$650,000 1 215,500 53,000 162,500 2 … 8 Contemporary Engineering Economics, 5th edition, © 2010

Cash Flow Diagram for the Computer Process Control Project Contemporary Engineering Economics, 5th edition, © 2010

Payback Period Principle: How fast can I recover my initial investment? Method: Based on the cumulative cash flow (or accounting profit) Screening Guideline: If the payback period is less than or equal to some specified bench-mark period, the project would be considered for further analysis. Weakness: Does not consider the time value of money Contemporary Engineering Economics, 5th edition, © 2010

Example 5.3 Payback Period Autonumerics Company has just bought a new spindle machine at a cost of $105,000 to replace one that had a salvage value of $20,000. The projected annual after-tax savings via improved efficiency, which will exceed the investment cost, are as follow: Contemporary Engineering Economics, 5th edition, © 2010

Example 5.3 Payback Period Given: Cash flow series as shown in previous figure Find: Conventional payback period Contemporary Engineering Economics, 5th edition, © 2010

Example 5.3 Payback Period N Cash Flow Cum. Flow 1 2 3 4 5 6 -$105,000+$20,000 $15,000 $25,000 $35,000 $45,000 -$85,000 -$70,000 -$45,000 -$10,000 $35,000 $80,000 $115,000 Contemporary Engineering Economics, 5th edition, © 2010

Example 5.3 Payback Period N Cash Flow Cum. Flow 1 2 3 4 5 6 -$105,000+$20,000 $15,000 $25,000 $35,000 $45,000 -$85,000 -$70,000 -$45,000 -$10,000 $35,000 $80,000 $115,000 Payback period should occurs somewhere between N = 3 and N = 4. Contemporary Engineering Economics, 5th edition, © 2010

Cumulative cash flow ($) $45,000 $45,000 $35,000 $35,000 $25,000 $15,000 Annual cash flow 1 2 3 4 5 6 Years $85,000 150,000 3.2 years Payback period 100,000 50,000 Assumption: cash flows occur continuously throughout the year Cumulative cash flow ($) -50,000 -100,000 1 2 3 4 5 6 Years (n) Contemporary Engineering Economics, 5th edition, © 2010

Practice Problem How long does it take to recover the initial investment for the computer process control system project in Example 5.1? Contemporary Engineering Economics, 5th edition, © 2010

Discounted Payback Period Principle: How fast can I recover my initial investment plus interest? Method: Based on the cumulative discounted cash flow Screening Guideline: If the discounted payback period (DPP) is less than or equal to some specified bench-mark period, the project could be considered for further analysis. Weakness: Cash flows occurring after DPP are ignored Contemporary Engineering Economics, 5th edition, © 2010

Discounted Payback Period Calculation Period (n) Cash Flow (An) Cost of Funds (15%)* Ending Cash Balance -$85,000 1 15,000 -$85,000(0.15) = -$12,750 -82,750 2 25,000 -$82,750(0.15) = -12,413 -70,163 3 35,000 -$70,163(0.15) = -10,524 -45,687 4 45,000 -$45,687(0.15) =-6,853 -7,540 5 -$7,540(0.15) = -1,131 36,329 6 $36,329(0.15) = 5,449 76,778 * Cost of funds = (Unrecovered beginning balance) X (interest rate) Contemporary Engineering Economics, 5th edition, © 2010

Discounted Payback Period Calculation Period (n) Cash Flow (An) Cost of Funds (15%)* Ending Cash Balance -$85,000 1 15,000 -$85,000(0.15) = -$12,750 2 25,000 3 35,000 -$70,163(0.15) = -10,524 -45,687 4 45,000 -$45,687(0.15) =-6,853 -7,540 5 -$7,540(0.15) = -1,131 36,329 6 $36,329(0.15) = 5,449 76,778 * Cost of funds = (Unrecovered beginning balance) X (interest rate) Contemporary Engineering Economics, 5th edition, © 2010

Discounted Payback Period Calculation Period (n) Cash Flow (An) Cost of Funds (15%)* Ending Cash Balance -$85,000 1 15,000 -$85,000(0.15) = -$12,750 -82,750 2 25,000 -$82,750(0.15) = -12,413 -70,163 3 35,000 -$70,163(0.15) = -10,524 -45,687 4 45,000 -$45,687(0.15) =-6,853 -7,540 5 -$7,540(0.15) = -1,131 36,329 6 $36,329(0.15) = 5,449 76,778 * Cost of funds = (Unrecovered beginning balance) X (interest rate) Contemporary Engineering Economics, 5th edition, © 2010

Discounted Payback Period Calculation Period (n) Cash Flow (An) Cost of Funds (15%)* Ending Cash Balance -$85,000 1 15,000 -$85,000(0.15) = -$12,750 -82,750 2 25,000 -$82,750(0.15) = -12,413 -70,163 3 35,000 -$70,163(0.15) = -10,524 -45,687 4 45,000 -$45,687(0.15) =-6,853 -7,540 5 -$7,540(0.15) = -1,131 36,329 6 $36,329(0.15) = 5,449 76,778 * Cost of funds = (Unrecovered beginning balance) X (interest rate) Contemporary Engineering Economics, 5th edition, © 2010

Discounted Payback Period Calculation Period (n) Cash Flow (An) Cost of Funds (15%)* Ending Cash Balance -$85,000 1 15,000 -$85,000(0.15) = -$12,750 -82,750 2 25,000 -$82,750(0.15) = -12,413 -70,163 3 35,000 -$70,163(0.15) = -10,524 -45,687 4 45,000 -$45,687(0.15) =-6,853 -7,540 5 -$7,540(0.15) = -1,131 36,329 6 $36,329(0.15) = 5,449 76,778 * Cost of funds = (Unrecovered beginning balance) X (interest rate) Contemporary Engineering Economics, 5th edition, © 2010

Discounted Payback Period Calculation Period (n) Cash Flow (An) Cost of Funds (15%)* Ending Cash Balance -$85,000 1 15,000 -$85,000(0.15) = -$12,750 -82,750 2 25,000 -$82,750(0.15) = -12,413 -70,163 3 35,000 -$70,163(0.15) = -10,524 -45,687 4 45,000 -$45,687(0.15) =-6,853 -7,540 5 -$7,540(0.15) = -1,131 36,329 6 $36,329(0.15) = 5,449 76,778 * Cost of funds = (Unrecovered beginning balance) X (interest rate) Contemporary Engineering Economics, 5th edition, © 2010

Discounted Payback Period Calculation Period (n) Cash Flow (An) Cost of Funds (15%)* Ending Cash Balance -$85,000 1 15,000 -$85,000(0.15) = -$12,750 -82,750 2 25,000 -$82,750(0.15) = -12,413 -70,163 3 35,000 -$70,163(0.15) = -10,524 -45,687 4 45,000 -$45,687(0.15) =-6,853 -7,540 5 -$7,540(0.15) = -1,131 36,329 6 $36,329(0.15) = 5,449 76,778 * Cost of funds = (Unrecovered beginning balance) X (interest rate) Contemporary Engineering Economics, 5th edition, © 2010

Illustration of Discounted Payback Period Contemporary Engineering Economics, 5th edition, © 2010

Depending on which cash flow assumption adopted, the project must remain in use about 4.2 years (continuous cash flows), or 5 years (year-end cash flows) Contemporary Engineering Economics, 5th edition, © 2010

Summary Payback periods can be used as a screening tool for liquidity, but we need a measure of investment worth for profitability. Contemporary Engineering Economics, 5th edition, © 2010