MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,

Slides:



Advertisements
Similar presentations
Water Source Heat Pump Systems
Advertisements

Series L Air conditioners for Laboratories.
Customer Service – International Dept. The thermal solar systems  Installation  Commissioning  Maintenance.
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
MILK PASTEURIZER. One milk pasteuriser with a capacity of litres of milk for hours, HTST type with an operate range from 75° to 95°C, including.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Muhajir Ab. Rahim School of Mechatronic Engineering
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
13th April 2005R.Bates, QM Measurements of Barrel and EC HEX R. Bates, M. Olcese, B. Gorski, QM for prototype builds.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
Vacuum system.
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
Rod Dry Dec Training Module #6: Problem Statement Low pressure steam (1 barg) is condensed in a heat exchanger with cooling water. The exchanger.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 8/7/2015 Simone Coelli For the Milano UT group INFN milano 1 Istituto.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Superconducting Quadrupoles inside the HERA Experiments M. Bieler, DESY, LHC LUMI 05 Workshop, Arcidosso, September The HERA Interaction Region.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
Page 1 Sapphire by pass line  Design Concept of Cooling Water System : Funnel 10 line Tank 2 10 tones Chiller -20cm tilt - 5cm distance between growers.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 11: STEAM PIPING SYSTEM (1)
Mitglied der Helmholtz-Gemeinschaft PANDA MVD Slow Control Issues Harald Kleines, Forschungszentrum Jülich, ZEA-2.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Update on the PSB Cooling and Ventilation Systems
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
Feedback on transfer line sizing and flow calculations for UT
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Rosario Turrisi INFN Padova
Update of MVD services and requests
Beam
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
FEE COOLING UPDATE CGEM Workshop - IHEP - June 13th 2017
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
VELO Thermal Control System
Micro Vertex Detector of PANDA Strip Detector
Performance of a CO2 System with Four Parallel Pipes
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
Forum on Tracking Detector Mechanics - Bonn, May 2016
Pixel cooling specifications
Tracker cooling loop “check out” draft for discussion
Integration – preliminary ideas on routing and tests
update on UT cooling system
Work packages status in Torino and perspectives
Detector Technology Group
Hydraulic & Pneumatic Systems
CO2 Cooling IPNL Nick Lumb, 28/01/09.
Forced draft cooling tower. NumberingEquipment A-1Storage Tank B-2Temperature sensor C-3Pump D-4Ball valve E-5Rotameter F-6Cooling water from the tank.
Air Conditioning System-1
ESS elliptical cryomodule
November technical stop activities:
SNS PPU Cryomodule Instrumentation
ESS elliptical cryomodule
LEBT water cooling system
Presentation transcript:

MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID, DIMENSION of THE HYDRAULIC SYSTEM for STAVES AND DISKS CHOICE and DEFINITION of CIRCUITS MODULARITY PRESSURE DROP EXSTIMATION and TEST DIMENSION of the EXTERNAL HYDRAULIC COOLING CIRCUIT DEFINITION of the COOLING PLANT ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC CONVERTER BOARDS INTEGRATION of the COOLING PLANT in PANDA AREA S.COLI 9/12/2013

PIXEL MODULARITY AND COOLING CIRCUITS in PIXEL MVD LAYER 1 Half layer has 6 staves 3 U tubes (fe 2mm) 1 circuit for 3 U tubes Half layer has 8 staves 4 U tubes (fe 2mm) 2 circuits for 2 U tubes LAYER 2 Half layer has 14 staves 7 U tubes (fe 2mm) 3 circuits, 1 for 3 U tubes and 2 for 2 U tubes DISKS 1-2 Half disk has 4 tubes (2+2)*2 U tubes (fe 2mm) 4 circuits for 2 U tubes DISKS 3-6 Half disk has 6 tubes (3+3)*4 U tubes (fe 2mm) 8 circuits for 3 U tubes = = 21 Cooling circuits (11 for 3 U tubes + 10 for 2 U tubes) =21 inlet tubes + 10 return tubes with fi = 6,5mm + 11 return tubes with fi = 8 mm 53 U tubes (fe 2mm) U tubes (fe 2mm.) in MP35N OUTSIDE MAGNET INSIDE MAGNET INSIDE MVD fi 6,5mm 0,9 lit/min fi 5mm fi 2,5mm 0,3 lit/min fi 8 mm 0,6 lit/min fi 6,5 mm N. 11 circuits for 3 U tubes N. 10 circuits for 2 U tubes COOLING CIRCUITS INSIDE MVD INSIDE MAGNET OUTSIDE MAGNET S.COLI 9/12/2013

RETURN OUT OF THE MAGNET PRESSURE DROP IN THE COOLING CIRCUITS for PIXEL STAVES AND DISKS- UPDATED 11 CIRCUITS FOR 3 U TUBES G[g/s] G[l/m] L[m] d[mm] V[m/s] Re P_drop[bar] INLET OUT OF THE MAGNET 15 0,9 35 6,5 0,45 2939,7 0,25 INLET IN THE MAGNET 2 5 0,76 3821,7 0,07 IN THE MVD 0,3 0,3+2 1,84+2,5 1,88+1 3462 0,25+0,32 RETURN IN THE MAGNET RETURN OUT OF THE MAGNET 8 2388,5 0,09   TOTAL DP  1,05 DP   0,8 10 CIRCUITS FOR 2 U TUBES 10 0,6 1959,8 0,08 0,51 2547,8 0,03 0,79 DP  0,71 Dp = 0,71 bar Dp = 0,63 bar S.COLI 9/12/2013

MVD HYDRAULIC SYSTEM COOLING PLANT PRESSURE SENSORS; PNEUMATIC VALVES; FLOW METERS; PRESURE REGULATORS; HEATERS (?); PNEUMATIC VALVES; -PUMP -VACUUM PUMP -PLC -CONTROLS COOLING PLANT HEATER HEAT EXCHANGER S.COLI 9/12/2013

DIMENSION of the HYDRAULIC CIRCUIT for MVD SYSTEM (PIXEL + STRIP): TUBE LENGHTS: 35 m INLET outside the magnet 2 m INLET inside the magnet 2,3 m in the MVD (53 U tubes) 2 m RETURN inside the magnet 35 m RETURN outside the magnet WATER VOLUME: about 60 liters MASS FLOW RATE: about 15 lit/min TUBE NUMBER: 21 INLET tubes + 21 RETURN tubes TUBE MODULARITY: 11 circuits with 3 U tubes + 10 circuits with 2 U tubes (0,3 lit/min each U tube) STRIP: 2,3 m in the MVD WATER VOLUME: about 55 liters MASS FLOW RATE: about 11 lit/min TUBE NUMBER: 22 INLET tubes + 22 RETURN tubes TUBE MODULARITY: 4 circuits with 3U tubes + 18 circuits with 2 U tubes (0,3 lit/min each) SUMMARING About 120 lit (PIXEL + STRIP) About 30 lit/min (PIXEL + STRIP) About 43 circuits 86 Tubes (PIXEL + STRIP, INLET + RETURN) PIXEL and STRIP GBT BOARDS and DC-DC Converter= 14+8*3= 38 U Tubes (0,6lit/min) AT THE STATUS OF THE WORK PIXEL and STRIP GBT BOARDS and DC-DC Converter= 14+8*3= 38 U Tubes About 120 lit About 24 lit/min About 38 circuits About 76 Tubes S.COLI 9/12/2013

DIMENSION of the HYDRAULIC CIRCUIT for MVD SYSTEM (PIXEL + STRIP): MVD COOLING : TUBES FROM COOLING PLANT TO MAGNET: 21+22+38 INLET LINES= 81 INSULATED TUBES [Diam. 14mm+ insulation= 35 mm] 21+22+38 RETURN LINES = 81 TUBES [Diam. 16mm] = 0,5 m* 0,5m total section for Tubes FROM COOLING PLANT TO the MAGNET (In Stainless steel and Polyurethane) IN FRONT OF THE MAGNET DOOR 170 Pressure sensors (one on each tube) CLOSE TO MVD (immediately in front of the magnet) 170 Readout cables 170 Power supply cables TUBES INSIDE THE MAGNET (around the beam pipe) 14 Polyurethane tubes - inlet lines (diam. 8-10mm) to GBT Boards. 14 Polyurethane tubes - return lines (diam. 8-10mm) from GBT Boards to magnet. 24 Polyurethane tubes - inlet lines (diam. 8-10mm) to DC-DC Boards 24 Polyurethane tubes - return lines (diam. 8-10mm) from DC-DC Boards to magnet. 43 Polyurethane tubes - inlet lines (diam. 8-10mm) to manifold patch panel = 53+48= 101 Polyurethane tubes- inlet lines (diam. 4 mm) from manifold patch panel to MVD = 53+48= 101 Polyurethane tubes - return lines (diam. 4 mm) from MVD to manifold patch panel. 43 Polyurethane tubes- return lines (diam. 8-10mm) from manifold patch panel to magnet THE COOLING PLANT PLC Tank Vacuum pump Inlet pump + filter Water cleaning unit Manifolds and about 85 inlet tubes Manifolds and about 85 return tubes Heat exchanger 85 pressure regulator 85 flow meters 85 valves on return lines 85 water Temperature sensors 170 pneumatic valves Other sensors (tank level indicator, pump pressure sensors, water temperature sensors…) THE MVD: 53 + 48 U-Tubes for PIXEL and STRIPS in MP35N 14 + 24 U-Tubes for GBT and DC-DC Converter Boards in Stainless steel (?) S.COLI 10/12/2013

COOLING PLANT DRAFT- UPDATED INLET TUBES for MVD and GBT+DC-DC Converter Boards RETURN TUBES for MVD and GBT+ACDC Converter Boards INSIDE THE PIT TANK+ VACUUM PUMP WORKING AREA PLC 3,5 m PUMP 3,8 m WATER CLEANING UNIT S.COLI 9/12/2013

COOLING PLANT DRAFT WARNING: RETURN TUBES CANNOT BE LOCATED HIGHER THAN MVD MVD COOLING PLANT 3,8 m 3,5 m PANDA AREA 170 PRESSURE SENSORS (?) MVD TUBES (?) MVD COOLING PLANT S.COLI 9/12/2013