Amendments to the Public Works Contracts

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS ( ) (FEB 2007)
NEC - Engineering and Construction Contract (ECC)
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Government Services How to Respond to a Request for Proposal (RFP) 2006.
Marcy Mealy Procurement Specialist CDBG Program
Time for a new standard - AS General Conditions of Contract
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Compulsory Briefing Session 15 October 2013 Panel of Attorneys.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
VALUE FOR MONEY 1 OGC buying.solutions Procurement of Projects Presented by Andy Hamer Pre Accession Advisor, Finance Ministry.
FAR Part 31 Contract Cost Principles and Procedures.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Change Orders. CO Proposals Initiated by owner or GC –Owner requests estimate for work proposed –GC CO results from changed site condition or response.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
The Nigerian Institute of Quantity Surveyors PRICING TENDER DOCUMENT BASED ON BESMM4 By Dr. GANIYU AMUDA YUSUF (FNIQS, RQS) Department of Quantity Surveying.
Presented to: By: Date: Federal Aviation Administration Ready for Cost Type Contracts - Accounting Systems and Administration Small Business Vendor Day.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
FIDIC Tendering Procedures
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Procurement Policy Summary
Treatment of Key Risks under EPC Contracts
CONTRACT ADMINISTRATION
Introduction to FIDIC - Manuals
Tender Evaluation and Award Process
Preparation of a tender and tender documents
Technical Specifications & Employer's Requirements
Administration of a FIDIC Contract - Project Control
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021
Content of Tender Dossier - Instructions to Tenderers - Tenders
Irish Construction Law Conference 2015
Audit Planning, Types of Audit Tests and Materiality
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Content of Tender Dossier Instructions to Tenderers
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Pre-Contract Phase -
Drawings Introduction to FIDIC - Drawings -.
Improving Community Safety through procurement practice and process Tim Oakley Head of Consultancy Trusted procurement for better buildings and homes.
Administration of a FIDIC Contract - Financial Management
Evaluation Grids Evaluation Grids.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Practical Application of new opportunities provided by New Regulations
Panel of Attorneys Compulsory Briefing Session 15 October 2013.
Administration of a FIDIC Contract - Award to Commencement -
EPA SUBCONTRACT TEMPLATE Overview September 2017
Service description This opportunity is to deliver a Lunch Club Support Service. Newcastle City Council is committed to providing services for older people.
Tim Ahern Consultancy Ltd. tim. Tel;
Types of contract selection based upon following:
Particular Conditions of Contract & Appendix to Tender
Engineering Project Tendering.
Sponsored by Illinois Presented by Trent Knoles
CONTRACT ADMINISTRATION
Design-Build Process Utilizing Negotiated Selection
BIDDING DOCUMENTS AND MAIN FEATURES
Dennis Li - HKCIC Lecturer
Dennis Li - HKCIC Lecturer
Procurement Planning Mani Ram Gelal
Construction Law | Dispute Resolution | Procurement | Training
Construction Contracts
Presentation transcript:

Amendments to the Public Works Contracts 7 March 2017

Amendments to the PWC’s Primacy of Bill of Quantities Specialist Work Packages New Dispute Management Procedures

Bill of Quantities – A return to Primacy (Guidance Note 1.5.3)

The Need for Change Schedule Part 1K17 – No Errors between Works Requirements and BoQ at Contractor’s risk Measures and descriptions were inadequate Accuracy of drawings were not tested at tender stage Contracts being tendered not fully designed with an under-measured/under-descriptive BoQ Price certainty?!

Making Contracts “With Quantities” Fully measured BoQ is mandatory for Employer Designed Projects Employer retains the risk of errors in the BoQ The BoQ is the primary reference for pricing purposes – no other document is to be included in the Pricing Document

Inconsistencies - Cl1.3.4 Inconsistencies between the Works Requirements and the Pricing Document resolved by an instruction from the ER. Works Requirements takes precedence and a Compensation Event may arise in accordance with the Schedule, Part 1K(17).

Resolution of Inconsistencies Works Item Works Item described in the Works Requirements but not in BoQ The Contractor will be required to complete the Works Item, if so directed by the ER, and shall be entitled to an adjustment to the Contract Sum The ER may direct the Contractor not to complete the Works Item, and there shall be no adjustment to the Contract Sum

Resolution of Inconsistencies Works Item Works Item described in BoQ but not in the Works Requirements The ER may direct the Contractor to complete the Works Item but the Contractor shall have no entitlement to an adjustment to the Contract Sum The ER may direct the Contractor not to complete the Works Item, and the ER or Employer shall be entitled to adjust the Contract Sum

Resolution of Inconsistencies Quantities Both the Works Requirements and BoQ include the Works Item but an inconsistency in the quantities exists. If the ER directs the quantity shown in the Works Requirements to be completed, the Contract Sum may be adjusted If the ER directs the quantity shown in the BoQ is to be completed, the Contract Sum shall not be adjusted

Other Risk Allocation Overall risk allocation in Schedule 1K must be considered e.g. ‘unforeseeable ground conditions’ is contractor risk Unforeseen ground encountered resulting in quantities of work increasing or decreasing K(19) overrules K(17) and a Compensation Event shall not arise The BoQ Preliminaries Section shall detail the allocation of risks, as per Schedule 1K

Related Issues Clause 4.4 – ER Communications Clause 4.5 – Instructions Clause 4.11 – Contractor to request instruction Clause 10.3 – condition precedent remains Schedule 1K (1), (9), (17) – €500

Specialist Works Procurement

Specialists and Employer Appointment subject to varying levels of involvement Little or no engagement – e.g. tax compliance, i.e. sub contractors not specialists Sets pre-qualification standards Direct tendering of specialist works Successful specialist tenderer → novated to contractor Naming successful specialist → appointed by contractor as sub-contractor (nomination?)

When should named Specialists be considered? Early engagement is necessary, Detailed design required for Works Requirements Specialist required to undertake portion of their works in advance of main contractor agreement Value of single specialist works exceeds 15% of overall pre-tender estimate for the works Not possible to accurately define the specialist works enable it to be tendered as part of main contract

Types of Specialist Employer designed works: Reserved Specialist Novated Specialist Contractor designed works: D&B Specialists

The Appointment Process for Reserved Specialists

Identify successful Reserved Specialist tenderer specialist candidates Shortlist main contract and Award contract to successful tenderer for main contract Identify successful Main Contract tenderer Reserved Specialist tender deadline Main Contract tender deadline Main Contract tender 1 Evaluate tender 3 Standstill Specialist tender 2 Evaluate tender 4 Standstill 5 Contract admin 6

Reserved Specialists Restricted procedure used to pre-qualify both main contractors; and specialists Specialist contract in NN CIF

Novation – Specialists Employer tenders the specialist work Informs tendering specialists that its intention is to novate Must provide novation agreement and collateral warranty Specialist and contractor enter contract Form of contract dependent on CWMF guidance

Novation – Main Contractor Employer tenders for Main Contractor Informs Main Contractor of novation Novation agreement Identity of specialist Programme for novated specialist works

D&B Specialists Extent of contracting authority’s involvement: Sets appropriate pre-qualification criteria/standards that proposed specialists must meet Establishing pre qualification panel of specialists Novation – where specialist is required in advance of contractor appointment

Main Contract Pricing

Main Contract Pricing Schedule Part 1F(iii) sets out the named Specialist Works Packages: Reserved Sums and Contract Sums (for Novated Specialists) are to be provided in the Pricing Document Pricing Documents (unpriced) for each of the named Specialist works packages should be provided in the main contract Pricing Document

Main Contract Pricing Pricing Document must include items to allow for the pricing of the following: General attendances – lump sum items Special attendances defined as required – lump sum items Contractor’s management, risk acceptance and indirect overhead costs – lump sum item Contractor’s profit – percentage of Specialists Reserved/Contract Sum Lump sum items priced less than zero will be deemed to be zero and negative percentages will be treated as zero per cent

New Dispute Management Procedures

The Dispute Management Procedure The Project Board: Members stated in Schedule Part 1A 1-3 members nominated from each side Function of Project Board: review disputes referred to Clause 13.1 10.5.4 and 10.5.5 determinations only No authority to review any other such dispute or may arise Must have capacity and authority to negotiate binding agreements

The Dispute Management Procedure Project Board must meet at least every 60 days to review disputes referred to it All binding agreements reached must be signed by the Employer and the Contractor If no agreement is reached, the Board shall on the next working day, notify the parties of the failure to resolve dispute

Standing Conciliator When Contract Value is in excess of €10m Appointed by the Parties When Contract Value is below €10m Employer has option of requiring a Standing Conciliator to be appointed by the Parties Can chair the Project Board and advise/draft binding agreements Reserved sum shall be included in the Pricing Document – 50% of fee

Questions? Pauric Marray Pauric.Marray@QuiggGolden.com London +44 (0)20 7022 2192 London@QuiggGolden.com Dublin +353 (0)1 676 6744 Dublin@QuiggGolden.com Belfast +44 (0)28 9032 1022 Belfast@QuiggGolden.com Jeddah +966 (0)2 651 82 22 Jeddah@QuiggGolden.com