The implementation follows the plans drawn by the integration group (slides from Catherine Clerc) 1.Gap between barrel Ecal and barrel Hcal 2.Gap between.

Slides:



Advertisements
Similar presentations
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Advertisements

Motor Installation By Bill Lee Article 430. NF 15HP NF 25HP NF 30HP NF 50HP NF 75HP D.E.T.D. Fuse Feeder O.C. Feeder Conductors N.T.D IV. Time D.E.T.D.
CALENDAR.
Multiplication Facts Review. 6 x 4 = 24 5 x 5 = 25.
Decimals 10ths and 100ths.
Factorise the following 10x a – 20 36m a + 27b + 9c 9y² - 12y 30ab³ + 35a²b 24x4y³ - 40x²y.
EXAMPLE 1 Adding and Subtracting Decimals a
Money Matters First Grade Math 1. What coin is worth $0.01? 1.Penny 2.Nickel 3.Dime.
Lesson 7. Major factors which affect pricing of doors  Frames  Doors  Hardware.
Construction Diploma with Functional Skills Maths Level 1/2 Formative Assessment Task (START)
Midterm Review Part II Midterm Review Part II 40.
Before Between After.
ECAL FB Meeting, D Cockerill (RAL)1 Large EE Mechanics update.
Partial Products. Category 1 1 x 3-digit problems.
0 x x2 0 0 x1 0 0 x3 0 1 x7 7 2 x0 0 9 x0 0.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
01/07/2008HCAL Main Meeting- Mechanical Integration1 ILD HCAL Mechanical Integration HCAL Main Meeting Kirsten Kschioneck, DESY.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Test Beam models in Mokka Fabrizio Salvatore (RHUL) Gabriel Musat (LLR) Paulo Mora de Freitas (LLR)
Inside the new Mokka release Fabrizio Salvatore (RHUL) Gabriel Musat (LLR) Paulo Mora de Freitas (LLR)
1/9/2003 UTA-GEM Simulation Report Venkatesh Kaushik 1 Simulation Study of Digital Hadron Calorimeter Using GEM Venkatesh Kaushik* University of Texas.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
Mokka and integration of the geometry AIDA kick-off meeting WP2 session: Common software tools 17 February 2011 – CERN Paulo Mora de Freitas and Gabriel.
ALCPG09 Albuquerque, The new geometry of the ILD muon system in MOKKA N. D’Ascenzo, V. Saveliev, Obninsk State University / DESY U. Schneekloth.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
ALCPG11-Peterson1 Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
Jochen Ebert, Uni Karlsruhe1 Powering via cooling pipes very first results.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
International Workshop on Linear Colliders, Geneve Muon reconstruction and identification in the ILD detector N. D’Ascenzo, V.Saveliev.
SiD Engineering Design for the LOI Kurt Krempetz (Layer 5) (Layer 1) VXD.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
Cost Issues Y.Sugimoto, A.Maki Estimation Procedure Get unit cost from the cost estimation for GLD(DOD) Estimate (relative) amount of return-yoke.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Carbon-aluminum composite structures for the TPC, , Pierre Manil, 1 Detector structure: Carbon-aluminum composite structures for the TPC Pierre.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
The development of SDHCAL in Mokka Gabriel Musat, Ran Han, Gerald Grenie
Gabriel Musat L.L.R. – Ecole polytechnique ECFA-DESY Linear Collider Workshop Amsterdam, April 1-4, 2003.
CALICE Si-W ECAL (& ILD) power pulsing (cabling) C.Clerc LLR, Ecole polytechnique, Palaiseau R. Cornat P.Mora de Freitas G.Musat J.-F. Roig.
Simulation of the CALICE Test Beams with MOKKA Fabrizio Salvatore Royal Holloway University of London.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
Mokka, main guidelines and future P. Mora de Freitas Laboratoire Leprince-Ringuet Ecole polytechnique - France Linear collider Workshop 2004, Paris.
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
The Simulation of the HEC What is presently in the description in GeoModel as presented by Joe Boudreau versus What should be in…
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
MOKKA - recent developments Gabriel Musat, L.L.R. – Ecole Polytechnique.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
High Granularity Calorimeters LLR – Feb 2-3 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling 1.Design of the EM end-caps.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
CEPC Detector Geometry Design & Validation
2016/9/30 Yasuhiro Infra/CFS mini-ws
Dead zone analysis of ECAL barrel modules under static and dynamic loads Marc Anduze, Thomas Pierre Emile – LLR CALICE Collaboration Meeting.
HCAL preliminary analysis and results
Update of experimental hall in Japanese mountain site
C.Clerc ILD session, ALCPG /03/2010
Dead zone analysis of ECAL barrel modules under static and dynamic loads for ILD Thomas PIERRE-EMILE, Marc ANDUZE– LLR.
SDHCAL Integration Moi j’aime bien SAFARI
CALICE Meeting Tokyo University, 26/09/2017
Requirements of the support mechanics
ECAL – CLIC_ILD vs. CLICdet_2015
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
Gabriel Musat L.L.R. – Ecole polytechnique
ILD Optimisation: towards 2012 University of Cambridge
Dave Bailey University of Manchester
Presentation transcript:

The implementation follows the plans drawn by the integration group (slides from Catherine Clerc) 1.Gap between barrel Ecal and barrel Hcal 2.Gap between barrels and endcaps 1)Services in the Ecal and Hcal zone 2)TPC endplates cooling Implemented as driver SServices00. 1 Dead matter simulation in the ILD detector model Catherine Clerc, Gabriel Musat and Paulo Mora de Freitas LLR - Ecole polytechnique

Dans les deux cas 3 Rails Alu x Z side: Three modules +Z side: Two modules Mechanics design (from Catherine Clerc) Implementation in Mokka 1.Gap between barrel Ecal and barrel Hcal

2. Gap between barrels and endcaps 3

Support SS 1.5 cm Polyethylene 2.75 cm Cu 0.82 cm Polyethylene 1.24cm Cu 0.52 cm -Z side 4 Services in the Ecal and Hcal zone: mechanics design (from Catherine Clerc)

Polyethylene 0.83 cm Cu 0.35cm Support SS 1.5 cm Polyethylene 2.56 cm Cu 0.74 cm +Z side 5 Services in the Ecal and Hcal zone: mechanics design (from Catherine Clerc)

Vapor return ring 10x2.8 mm² Liquid supply ring 7x2.7 mm² 6 Cooling tubes 4x1.9 mm² rings of equivalent thickness in copper ? 6 TPC endplates cooling : mechanics design (from Catherine Clerc) ID cmOD cm section ID cm² section CuCu/ODR (approximate) Liqid supply0,50,70,196250,384650,18840, vapor return0,810,50240,7850, cooling tube0,250,40, ,12560, ,

Implementation in Mokka: view of all implemented services TPC endplates cooling Ecal, Hcal and partial TPC services (details hidden) Ecal and partial TPC services Ecal services