A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.

Slides:



Advertisements
Similar presentations
Variable Frequency Drives Bypass Options
Advertisements

Inspection & Preventive maintenance of breakers
Refrigerators.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Welcome DIN Rail product training ISOLATOR/MCB/RCD/RCBO
One solution, many application Integrated Electronic Solution PowerSupply Flex.
WHAT IS ACCIAIO ? Acciaio Beghelli is a water and shock proof T5 and T8 steel & glass lighting fixture featuring an innovative fast installation, easy.
CLIQ power supply Integration. General view: -Schroff rack 19’’ 25U (500mm x 600mm x 1120mm). -2 fixed wheels +2 castor wheels with brake ⦰100mm.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
A First Look at WirelessHART ® An e-book by Pepperl+Fuchs.
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved. CENTERLINE 2100 Motor Control Center - SecureConnect™ September 1, 2011.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
07 - Winter 2005 ECE ECE 766 Computer Interfacing and Protocols 1 Grounding Grounds: –Common reference for the circuit –Safety What is the potential problem.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
PowerIT Air Insulated Cubicle Uniswitch
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Garage Doors Operators 24V DC D600 – D1000. WHY? To have a product able to compete with market leaders by design and functionality Garage doors operators.
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
CML 700i measuring light curtains Integrated interfaces and control unit for even simpler operation Leuze electronic | CML 700i product launch | Status:
© 2011 Eaton Corporation. All rights reserved. Configuring BladeUPS™
OEZ s.r.o. Quick and universal solution for your order Modeion 05/2012.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
Alice TOF Production Readiness Review Gas Control Systems.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Generator Condition Assessment through EMI Diagnostics Doble Power Services.
Wiener crates; An installation and power supply analysis. Magnus Bjork Be/Co/Fe
Mikhail Ovsienko TE-MPE-EE
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
Sub Station.
Kenneth A. Stone Senior Automation Specialist UL508 Standards
SUB-STATIONS.
Beam Interlock System SPS CIBU Connection Review
ProtoDUNE SP – Slow control Status
Blower-/Fan Coil-Actuator
How SCADA Systems Work?.
DESCRIPTION AND GUIDE TO OPERATIONS
Connections Topology of Apollo ACS.
1v0.
the CERN Electrical network protection system
GROUND-FAULT GROUND-CHECK MONITOR
FIRELEC Migration Solution
Presented by: LADWP November 14, 2017
Power distribution and UPS in a single, compact system
Most Effective Methods to Replace a Brake Light Switch.
All you Need to Know About the Wiring Harness
Programmable Logic Controllers (PLCs) An Overview.
FIRELEC Migration Solution
De-Ice control devices
Product Training Module
FIRELEC Migration Solution
Flotection: Building Main Shutoff System
1.11: Robot Controller.
TS2 PSS Architecture, Concepts of Operations and Interfaces
Series 5300 Lithium Cell Formation System
Day 2 Training - Technical
PSS0 Design & Concept of Operations
Its strengths, your benefits
Its strengths, your benefits
Detailed information FOR INTERNAL USE ONLY! CUBE20.
ECR on pole order of the HL-LHC IT circuit and resulting implications
DIPLOMA In ELECTRICAL ENGINEERING DEPARTMENT OF ELECTRICAL ENGINEERING GOVERNMENT POLYTECHNIC COLLEGE, HANUMANGARH Sept A Training Presentation On.
Presentation transcript:

A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN

Technical status Electrical part 07/10/2017 Process Instrument Connection Field Box Electrical Cabinets Cabling Simon MARTIN

QSCA Upgrade Reflection Input Output 07/10/2017 Input Output Equipment: ▫ Cabinet ▫ Field Box ▫ Link Cabling ▫ Field cabling ▫ Plant Instrumentation Component selection Technical Choice +Functionality +Availability +Safety -Maintenance Technical subset : ▫ Safety chain ▫ Protection chain ▫ EMC ▫ Elec Distribution ▫ Hardware Interface ▫…. Technical optimisation ratio: Maximum technical result Minor resources/cost Technical requirements : ▫ Standards ▫ Electrical Spec ▫ EMC rules Simon MARTIN

SUMMARY of technical solution presented : QSCA Upgrade SOLUTION 07/10/2017 SUMMARY of technical solution presented : ▫ Push button Safety chain ▫ 3.3kv motor rotation test ▫ 3.3kv Cellule signal exchange ▫ Elec Distribution ▫ Hardware Interface ▫ Field box ▫ Field Cabling & Cable tray ▫ Instrumentation connection Simon MARTIN

Push-Button Safety Chain QSCA- Cabinet-Zoom Push-Button Safety Chain 07/10/2017 Goals -SIL level increased -Hardware simplified  unique safety relay -No relay forced Simon MARTIN

Rotation Test PROTOCOL QSCA- Cabinet-Zoom Rotation Test PROTOCOL 07/10/2017 Status During the test of electric motors, an operator has to force a relay. There is the risk that he makes a mistake and he activates another motor under maintenance. This is a risk for the operator who does the maintenance because he could be involved in a serious accident. ! No TEST Goals -Make safe and error free 3.3kv motor rotation test. -Motor test with remote control. -Simplified and standardized operation. -No manual relay forced, no human mistake ! -TEST MODE introduced in the UNICOS Control system. Simon MARTIN

3.3kV Cellule Order and Status QSCA- Cabinet-Zoom 3.3kV Cellule Order and Status 07/10/2017 NEW Circuit Breaker position status Goals -Make safe 3.3kv cellule orders (Unlock & Start) with SIL1 relay No possibility of forcing -Increase information of 3.3kv cellule status with “circuit breaker position status” Warning if 3.3kv cellule padlocked Simon MARTIN

QSCA- Cabinet-Zoom Distribution BT (400V) 07/10/2017 Goals -Distribution & Protection simplified (new design, new component…) -Main maintenance switch positioned on front doors. -Easy and faster operation recovery: In case of failure, “spare maintenance switch” have been added Simon MARTIN

QSCA- Cabinet-Zoom Distribution TBT 24V 07/10/2017 Old 24V distribution “Serial Loop” New 24V distribution with “Parallel BusBar” NEW 24V Bus Bar Goals Each device is supply from bus bar: -More flexibility to add or remove device - Easier diagnostic - Easier component disconnection & isolation - Better availability in case of failure of a component (degraded mode) Simon MARTIN

Interface connexion from field QSCA- Cabinet-Zoom Interface connexion from field 07/10/2017 Goals -Remove as possible Burndy Connector to reduce quantity of connexion -Field interface clearly defined Unique bloc terminal on bottom of cabinet. -Easy upgrade and modification (more flexible with accessible spare) Simon MARTIN

Overview of new CE standard cabinet Cabinet conclusion Overview of new CE standard cabinet 07/10/2017 Simon MARTIN

QSCA- Field Box-Zoom Cable Gland 07/10/2017 Status - Oil infiltration - Cable gland plate damaged Goal -Prevent infiltration by gravity Drilling only on bottom plate -Index Protection increased -Easy upgrade and modification Simon MARTIN

QSCA- Field Box-Zoom Removal of electronic 07/10/2017 Goal -Reducing equipment failure Active component removal -Reducing connection problem Screw less terminal bloc Problematic Field box bad environment: Vibration Aggressive oil Heating Screw terminal bloc Simon MARTIN

QSCA- Cabling & Instrumentation Cable tray & Protection 07/10/2017 Status Light cable tray & damaged cable clamp in bad environment (UV, Aggressive oil, Heating).  Cabling unprotected and damaged Goal -Cable protection increased Cable tray cover added  Cable sheath Simon MARTIN

QSCA- Cabling & Instrumentation Connector M12 Moulded as much as possible 07/10/2017 Status Lot of failures (Short circuit with ground) are caused by bad connection inside EV connector. Maintenance human mistake (re-assembly). Goal Reducing equipment failure  as possible welded and moulted connector  adaptor M12 connector to EV connector Industrial component following standard must be preferred than a special part developed at CERN Simon MARTIN

CONCLUSION 07/10/2017 The technical upgrade methodology/solution come out from CE section, other laboratory and industry experiences…Several technical solutions presented have been already installed in the various TE-CRG projects with very good results. Safety : functionalities have been upgraded to the actual international norms. Functionalities : technical installation present the same level of operation functionality. Availability : technical installation have been design to have better availability (to be confirmed by time..) (i.e. degraded mode operation have been installed: separation of electrical and instrumentation circuit) Maintenance : is easier by design : cabinet layout low density, better distribution, new terminal block… Simon MARTIN