Tracking simulations – where we are and what needs to be done R. Bruce on behalf of task 5.2.

Slides:



Advertisements
Similar presentations
Collimation with retracted TCSGs R. Bruce, R. Kwee, S. Redaelli.
Advertisements

Combined cleaning in IR3 - MD results and simulations Adriana Rossi R.W.Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, L. Lari, S. Redaelli, G. Valentino,
FLUKA studies: channeled ions on LHC IP7 L. Lari (CERN & IFIC (CSIC-UV)) D. Mirarchi (CERN & ICL) A. Lechner (CERN) ColUSM#32 December the 6 th,
Simulation priorities for 2015 R. Bruce for task 5.2.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
Off-momentum tail scraping for passive abort gap cleaning (MD 444) D. Mirarchi, R. Bruce, S. Redaelli On behalf of the LHC Collimation Team LHC Study Working.
Status of halo excitation studies at CERN R. Bruce, D. Banfi, M. Buzio, J. Barranco, O. Bruning, X. Buffat, R. Chritin, R. de Maria, M. Fitterer, M. Giovannozzi,
Status of FLUKA Simulations for Collimation BLM Thresholds 6 th BLM Threshold Working Group 10/02/2015 E.Skordis On behalf of the FLUKA team Sixtrack input.
Beam Background Simulations for HL-LHC at IR1 Regina Kwee-Hinzmann, R.Bruce, A.Lechner, N.V.Shetty, L.S.Esposito, F.Cerutti, G.Bregliozzi, R.Kersevan,
DS Heat Load Scenarios in Collision Points and Cleaning Insertions. Prepared by F. Cerutti, A.Lechner and G. Steele on behalf of the FLUKA team (EN-STI)
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
R. Bruce, Today’s meeting ATS optics proposed for use in 2015 (see LBOC, Evian) Several differences compared to nominal optics – Checks needed!
Simulations of TCT beam impacts for different scenarios R. Bruce, E. Quaranta, S. RedaelliAcknowledgement: L. Lari, C. Bracco, B. Goddard.
LHC Crystal MD 22/09/2015 – LSWG #7 R. Rossi for the LHC Collimation team and the UA9 Collaboration.
AdColMat: Status of the Working Group and Recent Advancements Working Group on Advanced Materials for Collimators 4 th Meeting - 21/7/2014 A. Dallocchio.
Aperture in case of an asynchronous beam dump with ATS optics R. Bruce, E. Quaranta, S. Redaelli With valueable input from: A. Bertarelli, C. Bracco, F.
Heat Deposition Pre-Evaluation In the context of the new cryo-collimator and 11-T dipole projects we present a review of the power deposition studies on.
Work in progress: Improved models of collimation margins with TCT damage limit R. Bruce, L. Lari 1 Input and discussions: R. Assmann, A. Bertarelli, C.
LHC off-momentum collimation simulation Hector Garcia Morales Royal Holloway University of London Roderik Bruce, Danielle Mirarchi, Belen Salvachua, Kyrre.
Case study: Energy deposition in superconducting magnets in IR7 AMT Workshop A.Ferrari, M.Magistris, M.Santana, V.Vlachoudis CERN Fri 4/3/2005.
Collimator settings for 2012 R. Bruce, R. Assmann for the collimation team
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
NM4SixTrack Implementation of new composite materials for HL-LHC collimator upgrades in SixTrack “Tracking for SixTrack” workshop – CERN, R.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Proposal for change of the reference emittance for the estimate of apertures, DA, etc. G. Arduini with input from: C. Bracco, R. Bruce, H. Burkhardt, R.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Field Quality Specifications for Triplet Quadrupoles of the LHC Lattice v.3.01 Option 4444 and Collimation Study Yunhai Cai Y. Jiao, Y. Nosochkov, M-H.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
How low can we go? Getting below β*=3.5m R. Bruce, R.W. Assmann Acknowledgment: T. Baer, W. Bartmann, C. Bracco, S. Fartoukh, M. Giovannozzi, B. Goddard,W.
R. Bruce, M. Giovannozzi, S. Redaelli With essential input from G. Arduini, R. De Maria, S. Fartoukh, M. Fitterer, R. Tomas, J. Wenninger, aperture team.
R.W. Assmann, V. Boccone, F. Cerutti, M. Huhtinen, A. Mereghetti
On behalf of the CERN Collimation Team and FLUKA team…
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
TCT BLM response from tertiary halo at 6.5 TeV
Tracking simulations of protons quench test
Status of MERLIN and Recent Developments
On behalf of the CERN Collimation Team and FLUKA team…
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
LHC collimation MDs, crystals and halo control
Update on loss maps for input to energy deposition studies
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
Field quality to achieve the required lifetime goals (single beam)
FCC-hh Machine Detector Interface
Valloni A. Mereghetti, E. Quaranta, H. Rafique, J. Molson, R. Bruce, S. Redaelli Comparison between different composite material implementations in Merlin.
Energy deposition studies in IR7 for HL-LHC
Beam collimation for SPPC
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
The 4th International Particle Accelerator Conference, IPAC13
Progress of SPPC lattice design
Week 35 – Technical Stop and Restart
Collimation after LS1: cleaning and β* reach
Collimation margins and *
Improving Collimator Setup Efficiency
FLUKA Energy deposition simulations for quench tests
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Summary for LPC (March 7th, Ralph Assmann)
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Another Immortal Fill….
Powering scheme for Hollow Electron Lens
Update on IR7 Layout for a Crystal Collimation System with 8 Crystals
LHC Physics Debris Simulation Update
Presentation transcript:

Tracking simulations – where we are and what needs to be done R. Bruce on behalf of task 5.2

Outline Selected highlight results from the last year – Cleaning – Asynchronous beam dump – Other studies Open points and future plans R. Bruce,

Highlights – cleaning simulations Cleaning simulations for HL-LHC v1.2 with Merlin and SixTrack (D. Mirarchi, A. Mereghetti, H. Rafique, S. Tygier, A. Valloni) R. Bruce, S. Tygier, Merlin, no TCLDs D. Mirarchi, SixTrack, TCLDs

Highlights – cleaning simulations Studies of round/flat beams, comparisons TCT4/5 (Talk R. Kwee) – Input to FLUKA studies for experimental background Systematic investigation of IR losses with different TCT settings and aperture (H. Garcia, IPAC15) HL pre-squeeze, intermediate points (talk S. Tygier) Cleaning with new low-impedance materials in TCSGs (E. Quaranta et al., IPAC15) R. Bruce,

Highlights – asynchronous beam dump TCT damage limit calculations, with FLUKA and MME (E. Quaranta et al., IPAC15) Updated TCT damage limits for HL: P. Gradassi, CWG 8/6/2015 R. Bruce, ThresholdMPP 2013Nominal B2Nominal B1HL-LHC B2ATS 2015 B2 Plastic damage 5.0E09 p1.2E11 p4.6E09 p6.9E09 p4.0E09 p Appearance of ejecta 2.0E10 p7.0E11 p1.8E10 p2.6E10 p3.1E10 p 5th axis compensation limit 1.0E11 p1.1E12 p1.4E11 p1.7E11 p2.1E11 p E. Quaranta P. Gradassi

Highlights – asynchronous beam dump Tracking for inputs to TCT damage limit calculations, to FLUKA and MME (E. Quaranta et al., IPAC15) – Updated damage limits for HL: P. Gradassi, CWG 8/6/2015 Input to FLUKA studies of leakage from TCT to triplet – First results for LHC: P. Ortega, CWG 8/6/2015 HL-LHC v1.2 asynch. dump, with updated simulation setup (E. Quaranta, R. Bruce) – Based on new measured waveforms (M. Fraser) and DYNK module (K. Sjobak) Studies of allowed aperture at injection and 7 TeV. Results shown this afternoon R. Bruce,

Highlights – other studies New tracking studies on orbit bumps for BFPP mitigation (J. Jowett, T. Mertens, M. Schaumann) Implementation of hollow e-lens in MERLIN (H. Rafique et al., IPAC15) Crystal collimation studies for LHC (R. Rossi, D. Mirarchi) R. Bruce,

Open points Present collection of results gives convincing evidence that our proposed collimation setup for HL will work for most aspects. However, still some open points Transverse integration of TCT4 and TCLX IR1/5 (A. Rossi) – Investigate alternative scenarios. Move TCT4 upstream? Validate any new scenario with tracking TCTs could get close to damage limit during asynchronous beam dump Less than factor 2 safety margin if latest refined simulation models are used. More details in afternoon talk. Pursue investigations of lighter materials in TCTs for HL-LHC: cleaning and asynch. dump, experimental background WP2: studies of changed phase advance MKD-TCT (S. Fartoukh). Tracking studies to be done if solution found R. Bruce,

Future plans Active halo control – Hollow e-lens (J. Wagner, H. Rafique) – Alternative methods with present hardware: ADT method, tune ripple (J. Wagner, H. Garcia) Improved halo modeling (H. Garcia) – More general halo will allow to simulate more loss scenarios, such as off-momentum cleaning Physics debris tracking (D. Mirarchi with input F. Cerutti) – Study final multi-turn loss distribution around the ring from elastic and inelastic collisions Experimental backgrounds (R. Kwee) – Study backgrounds from other sources, such as off-momentum cleaning and cross-talk between experiments R. Bruce,