Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.

Slides:



Advertisements
Similar presentations
USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
Advertisements

Injection Session – Close-out Workshop on Accelerator R&D for USRs Working Group J.H. Chen (IHEP), O. Dressler (Helmholtz ZB), R. Hettel (SLAC), Y. Jiao.
SESAME – TAC 2012: M. Attal Maher Attal SESAME Booster Characterization.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Loss problems associated with the acceleration of radioactive beams and what we can do about it A.Jansson f fermilab Loss issues (and ideas for solutions)
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Simultaneous Delivery of Parallel Proton Beams with the EURISOL Driver
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
Adiabatic eRHIC Extraction June 3, 2015Stephen Brooks, eRHIC meeting1 With emittance growth analysis.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
Extraction from the Delivery Ring November 19, 2013 J. Morgan.
Operated by the Jefferson Science Associates for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz, Dogbone RLA – Design.
1 st September 2005LHC-LUMI 05 - G.Arduini – CERN/AB Optical requirements for the magnetic lattice of the high energy injectors (SSPS in the SPS tunnel)
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
ILC Damping Ring Alternative Lattice Design ( Modified FODO ) ** Yi-Peng Sun *,1,2, Jie Gao 1, Zhi-Yu Guo 2 Wei-Shi Wan 3 1 Institute of High Energy Physics,
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
Imperial College London 1 6. Injection into and ejection from circular machines PREACCELERATOR ACCUMULATORRING PARTICLESOURCE INJECTION 1 EJECTION INJECTION.
Status of ATF Fast Kicker Experiment
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Principals of fast injection and extraction R. Apsimon.
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
LHC beam dump, injection system and other kickers B.Goddard, with input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, M.Barnes, C.Bracco, V.Senaj,
ILC Damping Rings: Configuration Status and R&D Plans Andy Wolski Lawrence Berkeley National Laboratory January 19, 2006.
Damping Ring Specifications S. Guiducci ALCPG11, 20 March 2011.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
CR: status and activities at BINP I.Koop, BINP, Novosibirsk O.Dolinskyy, GSI,Darmstadt , MAC, GSI, Darmstadt.
Investigation of Injection Schemes for SLS 2.0
PS2 WG Injection and extraction systems Basics and assumptions
TPS pulse magnet measurement
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
LINAC4 ADVISORY COMMITTEE
Injection system design for high-energy circular collider FCC-hh
Options and Recommendations for TL and Dumps
CLIC Damping ring beam transfer systems
Power converters for 2GeV injection
for the Neutrino Factory
AD & I : BDS Lattice Design Changes
Junji Urakawa (KEK) for ATF International Collaboration
Bunch Separation with RF Deflectors
FCC-hh injection group 7
Beam Injection and Extraction Scheme
Strip-line Kicker R&D at KEK-ATF
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
XFEL Beam Collimation and Switchyard Review Beam Switchyard
2017 CAS Erice case study: Design of a beam dumping system for FCC
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
PS2 Injection/Extraction Layout
Multi-Turn Extraction for PS2 Preliminary considerations
CEPC-SPPC Beihang Symposium
Pulsed Sextupole Injection for Beijing Advanced Photon Source
J. Seeman Perugia Super-B Meeting June 2009
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Injection design of CEPC
Linear beam dynamics simulations for XFEL beam distribution system
Specifications for the XFEL Beam Switchyard Kickers
Update on ERL Cooler Design Studies
Evaluation of 1GHz vs 2GHz RF frequency in the damping rings
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006

2 Fast Strip-Line Kicker ■Technical specification (section of Baseline Document) : –Length L=300 mm –Gap d=30 mm –Pulse V=10 kV –Need maximum beam acceptance A x,max = 0.09 m-rad ■Kicking angle of kicker is 0.04 mrad ■Acceptance and aperture sets the maximum beta functions at strip-line kicker: Including room for orbit excursion, say, 2 mm:

3 Optical Requirement of Fast Strip-Line Kicker ■Trajectory after kicks ■Required beam separation at septum ■Neglecting septum thickness, assume sin  = 1, the minimum number of strip-line kicker is about 38. d Inj. Beam Orbit Cir. Beam Orbit Inj.Cir.

4 Injection Section – If we put all strip-line kickers in one drift space 12 mm trajectory

5 Distributed Kicker Scheme 25 mm at quadrupole Entire injection line optics -phase advance cells

6 Distributed Injection Scheme Only 2-mm trajectory inside kickers

7 Extraction Section ■Similar to injection except the extracted beam size is much smaller ■Required kicker angle in about half of that of injection ■The tolerance on the beam orbit excursion can be large Ext. Cir.

8 Extraction Section 4 mm trajectory

9 Lattice of Extraction Scheme

10 Possible Pulsed Septum Magnet ■Inspired by APS injection septum magnets that run at 7 GeV –Pulsed with 10 ms sine wave instead of DC because of heating (80 kW peak power) ■Thick septum, 70 mrad, 1T, 700 A, N=36, 10 ms half-sine ■Thin septum, 33 mrad, 0.7 T, 14000A, N=1, uses 3:1 transformer Need sufficient large angle to clear the closest quadrupole Thick (and stronger) septum Thin septum 5 m

11 Layout of injection at APS Thin septum Thick septum APS Injection 5-m section

12 Pulse requirements ■APS septums discharge capacitors into the magnet inductance –Charge supply is controlled to using 20 kHz (?) pulse injection just before discharging –Resulting trajectory angle jitter is 0.01 mrad –For a 1 ms period thick septum variation is ±60x10 -4, too large! Thin septum pulse is already shorter than 1 ms! ■To control the flat top, one must regulate during 1 ms of the discharge period, which is harder because of the much higher currents 500 ms T HS = 10 ms APS thick septum

13 Pulsed Magnet Flat Top Regulation ■APS engineers think regulation may be possible for thick septum –Spring-8 booster ramp 100 ms flat-top regulation of 1500 A to (Fukami) ■Thin septum design requires a short pulse for reduction of leakage fields using eddy currents, so a 1 ms pulse may defeat this feature.