WEEK 7 Project Management Magister Desain Universitas Komputer Indonesia.

Slides:



Advertisements
Similar presentations
PROJECT RISK MANAGEMENT
Advertisements

Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Risk Management Chapter 7.
Project Risk Management
CIS 375 Bruce R. Maxim UM-Dearborn
8 Managing Risk Teaching Strategies
7-1 Risk Management. 7-2 Risk Risk (in general, in finance): deviation, variance The change can be positive or negative Project risk: any possible event.
7-1 Risk Management Chapter 7 © 2007 Pearson Education.
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
PRM 702 Project Risk Management Lecture #28
PMI Knowledge Areas Risk Management.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Project Risk Management Supplement. The Importance of Project Risk Management  Project risk management is the art and science of identifying, assigning,
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Chapter 11: Project Risk Management
HIT241 - RISK MANAGEMENT Introduction
Project Risk Management Mohammad A. Rob. The Importance of Project Risk Management Project risk management is the art and science of identifying, assigning,
Risk Management in the Built Environment Qualitative and Quantitative Risk Management By Professor Simon Burtonshaw-Gunn – licensed under the Creative.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
Project Management By: Dr Madhu Fernando Project Risk Management
Chapter 11: Project Risk Management
IT Project Management, Third Edition Chapter 11 1 Chapter 6: Project Risk Management.
7-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Risk Management Chapter 7.
7-1 Risk Management Chapter 7 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
6-1 ELC 347 project management Day 13. Agenda Questions Assignment 5 posted –Due Oct 12:35 PM Integrative Project part 2 feedback –You needed more.
Chapter 7 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 7-1 Risk Management.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Project Management IV1021Fö5 Risk Management. Agenda Project Risk Project Risk Management The Risk Management Process Goal: get an understanding of basic.
Question Four: Project Risk Management PMBOK definition of Project Risk Project risk management is the art and science of identifying, analyzing, and responding.
PMP Study Guide Chapter 6: Risk Planning. Chapter 6 Risk Planning Planning for Risks Plan Risk Management Identifying Potential Risk Analyzing Risks Using.
SOFTWARE PROJECT MANAGEMENT
Project Risk Management Planning Stage
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Project Risk Management. Risk-Defined A situation involving exposure to danger; “The combination of the probability of an event and its consequences”
Chapter 7 Risk Management.
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
DARSHANA RAGHU MANAGEMENT. Risk Management Risk management is the identification, assessment, and prioritization of risks followed by coordinated and.
Chapter 11: Project Risk Management Information Technology Project Management, Fifth Edition.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
RISK MANAGEMENT PROCESS PREPARED BY: MUHAMMAD SULAIMAN
Process and customizations
Chapter 8 Managing Project Risk.
Project Management – PTM712S
Risk Management.
11.1 Plan Risk Management The process of defining how to conduct risk management activities for a project Detailed risk planning enhances the overall probability.
Project Based Risk Management Defusing a potential ticking time bomb
ESET 419 Engineering Technology Capstone I
8 Managing Risk (Premium).
Chapter 11: Project Risk Management
CHAPTER11 Project Risk Management
Recognization and management of RISK in educational projects
Project Risk Management
Risk management Chapter 7 Copyright ©2016 Pearson Education, Inc.
RISK ASSESSMENT TOOL PREVIEW
The Importance of Project Risk Management
Risk Management Chapter 7
Management. Management What is a risk? A risk is simply a probability that some adverse circumstance will actually occur.
Risk Management Process (Revised)
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT Mumtaz Ali Rajput +92 –
Project Team Building, Conflict, and Negotiation
Project Risk Analysis and Management: L3
ELC 347 project management
Chapter#8:Project Risk Management Planning
Project Risk Management
Managing Project Risks and Opportunities
Chapter#8:Project Risk Management Planning
Presentation transcript:

WEEK 7 Project Management Magister Desain Universitas Komputer Indonesia

PROJECT Project Risk, is any possible event that can negatively affect the viability of a project.

RISK MANAGEMENT Risk Management is the art and science of identifying, analyzing, and responding to risk factors throughout the life of the project and in the best interests of its objectives.

PROCESS OF RISK MANAGEMENT Risk Identification – the process of determining the specific risk factors that can reasonably be expected to affect our project. Analysis of Probability and Consequences – the potential impact of these risk factors, determined by how likely they are to occur and the effect they would have on the project if they did occur. Risk Mitigation Strategies – steps taken to minimize the potential impact of those risk factors deemed sufficiently threatening to the project. Control and Documentation – creating a knowledge base for future projects based on lessons learned.

RISK IDENTIFICATION Financial Risk Technical Risk Commercial Risk Execution Risk Contractual or Legal Risk Others: Absenteeism, Resignation, Staff pulled away by management, Additional staff/skills not available, Training not as effective as desired, Initial specifications poorly or incompletely specified, Work or change orders multiply due to various problems, etc.

RISK IDENTIFICATION METHOD Brainstorming meetings – Bringing the members of the projects team, top management and even clients together for a brainstorming meeting can generate a good list of potential risk factors. Expert Opinion – The collective “wisdom” of sets of experts is then used as the basis for decision making. History – In many cases the best source of information on future risk is history. Multiple (or team based) Assesment – A team based approach to risk factor identification encourages identification of more comprehensive set of potential project risks.

TYPICAL RISK VARIABLES (Jafary, 2001:85, Management of Risks, International Journal of Project Management, 19(2)) Promotion Risk Market Risk, volume Market Risk, price Political Risks Technical Risks Financing Risks Environmental Risks Cost Estimate Risk (completion risk) Schedule Risk (delay risk) Operating Risk Organizational Risk Integration Risk Acts of God

ANALYSIS OF PROBABILITY & CONSEQUENCES Risk = (Probability of Event)(Consequences of Event). Risk Impact Matrix: Consequences LowHigh Likelihood Low High

ANALYSIS OF PROBABILITY & CONSEQUENCES Example: DEVELOPING A NEW PRODUCT FOR THE RETAIL MARKET Risk FactorConsequencesLikelihoodImpact Potential A. Loss of lead designerHighLowModerate B. Technical failureHighMediumSerious C. Budget cutMediumLowMinor D. Competitor first to marketHigh Serious Consequences Low Medium High Likelihood Low Medium high

DETERMINING LIKELY RISKS & CONSEQUENCES SCOREMATURITYCOMPLEXITYDEPENDENCY Low (0.1)Existing designSimple designNot limited to existing system Minor (0.3)Minor redesignMinor increase in complexity Schedule or performance depend on existing model Moderate (0.5)Major changeModerate increaseModerate risk to schedule or performance Significant (0.7)Tech. available but complex design Significant increaseSchedule or performance depend on new system or process. Significant cost or risk Major (0.9)State of art, some research complete Extremely complexSchedule or performance depend on new system or process. Very high risk. SCORECOSTSCHEDULERELIABILITYPERFORMANCE Low (0.1)Budget estimate not exceeded Negligible/ no impact Minimal or no reliability consequences Minimal or no performance consequences Minor (0.3) Cost estimate exceeds budget < 5% Minor slip in schedule Small reduction in reliability Small reduction in system performance Moderate (0.5) Cost estimate exceeds budget < 15% Small slip in schedule Some reduction in reliability Some reduction in system performance Significant (0.7) Cost estimate exceeds budget < 30% Slips excess 1 month Significant degradation in reliability Significant degradation in system performance Major (0.9) Cost estimate exceeds budget < 50% Large schedule slip Reliability goals cannot be achieved under current plan Performance goals cannot be achieved Probability of Failure (Pf) Consequences of Failure (Cf)

CALCULATING A PROJECT RISK FACTOR Use the project team consensus to determine the scores for each Probability of Failure Category: Maturity (Pm), Complexity (Pc), Dependency (Pd). Calculate Pf by adding the three categories and dividing by 3: Pf=(Pm+Pc+Pd)/3. Determine the scores for each Consequences of Failure Category: Cost (Cc), Schedule (Cs), Reliability (Cr), Performance (Cp). Calculate Cf by adding the three categories and dividing by 4: Cf=(Cc+Cs+Cr+Cp)/4. Calculate Overall Risk Factor for the project by using the formula: RF=Pf+Cf-(Pf)(Cf) Rule of Thumb:Low riskRf < 0.3 Medium riskRf = 0.3 to 0.7 High riskRf > 0.7

QUANTITATIVE RISK ASESSMENT Assume your project team has decided upon the following risk values: Pm =.1, Pc =.5, Pd =.9 Cc =.7, Cs =.5, Cr =.3, Cp =.1 Determine the overall Project Risk using qualitative method

RISK MITIGATION STRATEGIES Accept Risk Minimize Risk Share Risk Transfer Risk Use of Contingency Reserves

CONTROL AND DOCUMENTATION Control and documentation methods help manager classify and codify the various risks the firm faces, its responses to these risks, and the outcome of its response strategies. Control document has to coherently identify the key information: what, who, when, why, how.

PROJECT RISK ANALISYS & MANAGEMENT (The European Association for Project Management) Define Focus Identify Structure Clarify Ownership of Risk Estimate Evaluate Plan Manage