Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Kit Building Class Lesson 4Page 1 R and X in Series Inductors and capacitors resist the flow of AC. This property is called reactance. Resistance also.
Chelmsford Amateur Radio Society Intermediate Course (4) Transmitters
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Lock-in amplifiers Signals and noise Frequency dependence of noise Low frequency ~ 1 / f –example: temperature (0.1 Hz), pressure.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Unit 9 IIR Filter Design 1. Introduction The ideal filter Constant gain of at least unity in the pass band Constant gain of zero in the stop band The.
Preliminary Results from HOM Measurements at the Tesla Test Facility (SLAC) Josef Frisch, Kirsten Hacker, Linda Hendrickson, Justin May, Douglas McCormick,
Potential improvements of the PS 10 MHz cavities driving amplifier G. Favia Acknowledgments: V. Desquiens, F. Di Lorenzo S. Energico, M. Morvillo, C.
Measurement and Instrumentation Dr. Tayab Din Memon Assistant Professor Dept of Electronic Engineering, MUET, Jamshoro. ACTIVE FILTERS and its applications.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
CHAPTER 5 - OSCILLATORS.
Lock-in amplifiers
Oscillators and Filters Review Material for Makeup Exam.
Philip Burrows Third Mini Workshop on Nano Project, KEK 30/5/05 Philip Burrows Queen Mary, University of London Overview of Intra-train Beam Feedback Program.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
M.Gasior, CERN-BE-BIBE-KT Innovation Day, 3 June Base Band Tune (BBQ) measurement systems - observing beam oscillations with sub-micrometre amplitudes.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
Feedback On Nano-second Timescales: An IP Feedback System for the Future Linear Collider Requirement for a fast IP beam-based feedback system Simulation.
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
Future FONT BPM Processors C.Perry 25 June Types of Processor Two types of processor: a) present mixer type b) baseband type Both will be made because:
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
Tests of STO IF Components S. Weinreb April 15, 2009 Two 1-2 GHz IF amplifier plates and one 5 GHz converter plate for the Texas test flight have been.
NLC - The Next Linear Collider Project Nano beams in the ATF extraction line Marc Ross Linear collider challenges: Energy Emittance source Stability ATF.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Automatic Gain Control Circuit for Quartz Crystals By – Abhijat Goyal Saliya Subasinghe.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
Beam Secondary Shower Acquisition System: Front-End RF Design
Electronic workshop for Si-W ECAL
Communication 40 GHz Anurag Nigam.
Dither Luminosity feedback versus Fast IP feedback
Demodulation/ Detection Chapter 4
Alternative BPM Processing Scheme – May08 Demo
Lock-in amplifiers
Revised ATF Shift Plans
CLIC Drive Beam Stabilisation
Progress towards nanometre beam stabilisation at ATF2
Intra-Pulse Beam-Beam Scans at the NLC IP
Progress towards nanometre level beam stabilisation
Phase Feedforward in 2015 & Plans for 2016
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Feed forward orbit corrections for the CLIC RTML
Beam dynamics requirements after LS2
8.5 Modulation of Signals basic idea and goals
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
SuperB Linac Beam Position Monitor
Beam Charge Measurement &Injection efficiency
Presentation transcript:

Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF

FONT at ATF Micron-level stabilisation of the ATF extraction line beam. Measure position of start of train, and correct the end. –To be accomplished within 56ns train. –Latency must be kept low. BPM processor should work in <5ns.

Processor Design Obtain difference between top and bottom striplines with a hybrid. Mix with 714MHz from ATF control system. Filter to remove unwanted mixer products and beam bunching power.

Filters 3-pole Bessel band pass filter before mixer. –Centred at 714MHz, bandwidth ~400MHz. –Reduces 357MHz entering mixer. –Reduces out of band power entering mixer, thus increasing dynamic range of BPM. Less 357MHz means low pass filter requirements are relaxed. –Less poles results in faster filter. –3-pole Chebyshev with ~170MHz cut-off.

Issues Non-zero hybrid isolation causes zero-offset. –BPM centre can be moved with variable attenuation if necessary. Stripline -> hybrid cables must be matched in time to a few ps. –This is possible, and has been achieved. 714MHz LO input to the mixer should be very phase stable with respect to the beam. –Should be tuned to the correct phase. A lot of power at the beam bunching frequency. –Low-pass filter must limit this to a very small value before signal reaches feedback amplifier.

Phase Stability of 714MHz

Tuning of LO phase ● Split difference signal to two hybrids using zero degree splitter. ● Split LO using 90 degree splitter. ● Adjust phase of incoming LO so the phase measurement output has no dependence on beam position.

Simulated Output - 100μm

Simulated Output - 1μm

Comments 357MHz beam bunching is not observed. Power at 714MHz –Due to mixer leakage. –Level equivalent to DC output when beam has 1μm displacement. Predicted latency ~4.5ns.

Reminder!

Single Bunch - Raw Signals

Single Bunch - After hybrid

Single Bunch - After Band-Pass Filter

Single Bunch – After Mixer

Single Bunch – Final Difference Output

Multibunch – 3-pole band-pass filter

Calibration

Warning!!! The following slides show very preliminary data!!! They show the first results from closing the feedback loop with no optimisation of the system at all!!! In the following week work will be done to optimise the main loop gain, the delay loop gain, the timing of the amplifier turn on, etc., and we will then be in a much better position to demonstrate the effectiveness of this system.

Feedback – Difference and Sum

Normalised Feedback

Further Work ● Optimisation of the system, including ● Amplifier gain ● Delay loop gain ● Delay loop timing ● Beamline layout (to minimise latency) ● Automation of the LO phase adjustment ● Christine Clarke (QMUL) has developed a Matlab algorithm to optimise the LO phase automatically. ● Adjusts voltage controlled phase shifters via GPIB power supplies.