What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

31/03/11FV 1 CEDAR from flammable gas safety point of view.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
Tracking Integration Challenges Y. meeting 2013/9/25.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
1 LumiCal Optimization and Design Takashi Maruyama SLAC SiD Workshop, Boulder, September 18, 2008.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
About L* i.e. the distance between the end of the last quadrupole “QD0” and the IP Until now, L* has been different for SiD and ILD, -> due to detector.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
LOI Planning The Very Forward Region Tom Markiewicz/SLAC Takashi Maruyama/SLAC Uriel Nauenberg/UCB SiD Collaboration Meeting, Boulder, CO 19 September.
SiD IR & MDI Engineering Progress Prelude to a Discussion of Integration with ILD and Based on Marco Oriunno’s Jan 2008 Talk at SiD CM Tom Markiewicz/SLAC.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
MEA Machine and Experiment Assembly Norbert Meyners, MEA 17. Sept. 2007ILC IRENG07; SLAC1 LDC Engineering Design (Status)
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
September 20, 2007H. J. Krebs/B. Wands/B. Cooper1 SiD Collaboration Preliminary End Door Design Concept Support of Forward Systems H. James Krebs Bob Wands.
Laser Alignment System for LumiCal and BeamCal Arkadiusz Moszczyński, Wojciech Wierba, Leszek Zawiejski Institute of Nuclear Physics PAN, Cracow 22nd FCAL.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Recommendations on Supports and Adjustment systems for ESS LINAC Components Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
September 2007SLAC IR WS Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY Talks by M. Morse, W. Wierba, myself.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
Very Forward Instrumentation: BeamCal Ch. Grah FCAL Collaboration ILD Workshop, Zeuthen Tuesday 15/01/2008.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
GSI, for the CBM Collaboration
BeamCal Simulation for CLIC
Status of GASPARD mechanics
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Update of MVD services and requests
Experimental hall design in Japanese site
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Layout of Detectors for CLIC
cooling and supports of the forward endcap EMC
Update of experimental hall in Japanese mountain site
Magnetic System Overview Solenoid and DID
C.Clerc ILD session, ALCPG /03/2010
Dead zone analysis of ECAL barrel modules under static and dynamic loads for ILD Thomas PIERRE-EMILE, Marc ANDUZE– LLR.
LumiCal mechanical design, integration with LDC and laser alignment
Requirements of the support mechanics
Changes to SiD since the DBD
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
on behalf of the FCAL collaboration
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
Challenges for FCC-ee MDI mechanical design
Integration and IR Hall
Some of the Points Raised During my JLAB Visit
Presentation transcript:

What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results

During the closing of endcaps, the position is controled by laser monitoring ( 4 points) / beam tube Visit at CMS (1) Endcap deformation Vertical deformation  3 mrad, i.e. 45 mm at 15 m Possible lateral misalignement : 13 mm  bending up to 17 mm Then the needed gap between barrel and Calo nose is to be >20 mm  the longitudinal mouvement of the nose because of magnetic field is here of 17 mm endcap Barrel+ coil 20mm

Visit at CMS (2) airpads  The ground deformation may be of 5 mm at a scale of 2 m  The airpads need compressed air supply of 150 bars ( 40 bars needed to come off)  The moving speed is constant ( no slowing down when close to contact)  Time needed to close one side : 1, 5 days  High pendular effect during lowering down in pit, so lowering times of each pieces : 12 h.

Visit at CMS (3) dry gas Argon flow Sealing by gasket around endcap nose

Visit at CMS (4) dry gas

Visit at CMS (5) tooling  Small size cradle elevator ( used for small interventions) : Needed place between endcap and barrel : 1.6 m The overall size on floor of engine is 1.3 m  Crane truck ( allowing heavier operation up to  full height) : 1.5 m on floor, 2 m needed for motion + On surface : Scaffolding Fixed and moveable

Forward detectors meeting with S.Schuwalov, W.Wierba (1) Lumical Modifications on Lumical : Reduction out the outside diameter from down to by the electronic inside the W sandwiches. Then a layer was W3.5+ Si 1.5= 5mm and becomes W3.5+ Si 1.5+ elec 1= 6mm. The consequence is the increase of the thickness of the Lumical 150mm  180mm, may be a problem regarding to the flange ( its position can be moved outside of the detector). The Lumical will be fixed to the front plate of LHCal Reduce also the W outside active region. Cooling: use W to draw the heat out of the detector to the edge. The total power dissipation of the Lumical should be in the range of 20-50W Initial alignment requirement : 1mm in xy 10 mm in z ( between the two lumical) 1mm regarding to the beam pipe. Position measurement requirement : 1/2mm in xy 60 µm in z ( between the two lumical) 4 µm inner radius. This could be guaranteed by construction and checked online by FSI system. Alignment system possibilities : Laser beams in the beam pipe ( 4 windows of 2mm of diam per side at least ) Introduction of a tube in the Fdet carbon support structure with vacuum Reference point on QD0, and thus what is the accuracy of Monalisa system ( < 10µm?) Space for cables coming from the inner part. The way out is now on the top and bottom of LHCal instead of its side. The patch panel should be close to the vacuum pump, on the back side of the LHCal. The Ecalring and lumical opening ( or mouting ) procedures are changed. The Ecal ring will be split horizontally, and the Lumical vertically. Thus, consequences on the place of tension rods

Rout ( active)=150; Rout total=200 Need of 10 cm of graphite in front of the beamcal with Rout=Rout active of Beamcal. so as in front part the graphite will be in close contact with the first layer, the total thickness of Beamcal+Graphite will be =250 mm If a pair monitor is foreseen, then the graphite thickness could be reduced to allow place for this pair monitor. The Gauge situated between pump and beamcal will have to be moved. The change from previous design is that the place where the single beam pipe is separated in two is now in the entrance plane of the graphite and no more of the Beamcal itself. The beamcal is supported from below with feet Forward detectors meeting with S.Schuwalov, W.Wierba (2) Beamcal P=10 to 15 W so “ a priori “ no cooling needed but may be necessary for isolation of other subdetector.

Forward detectors meeting with S.Schuwalov, W.Wierba (3) FCal integration Less dead material Lower gap Better cables paths Stiffer support for tension rods

Constraint on vacuum of 1 nT (10-9 mb) in central position ( beampipe) Vacuum ……. One analysis [6] of the effect of beam gas interactions on detector backgrounds set the required vacuum level at 1 nTorr in the 200m upstream of the IP and 10nTorr in the remainder of the BDS system. This paper did not attempt to specify the maximum permissible vacuum pressure in the 18m zone of the detector itself. It is assumed that each detector concept will investigate this limit and provide a technical means of providing it within the space constraints of their detector design…..( IR interface document) And datas from “ Technical note for ILD beam pipe “ Y. Suetsugu. Studies and simulations undergoing at LAL, to evaluate the incidence of the beam pipe shape in central position ( cylindrical or conical). First results are : No major differences regarding conductance, which is anyway limited by weak conductance in central part ( i.e. inside VTX). No need to oversize the pump close to beamcal as long as vacuum limited by conductance More results, for next ILD-MDI meeting ( Paris, january) Vaccum in beam pipe(1)