RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

2 Draft of proposed metrics for the WEQ BPS to conduct analysis and evaluation of the Parallel Flow Visualization pilot project. (PFV Pilot)
Flowgate Allocation Method Examples of Proportional Curtailment of FIRM PTP and GTL Houston, December 1-2, 2010.
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Parallel Flow Visualization and Flowgate Allocations Equity Concerns of Non-Market Transmission Owners Equity Concerns of Non-Market Transmission Owners.
Commercial Implications of ERR Calculations Option 3 method vs. Transaction method.
Parallel Flow Visualization/Mitigation Proposal
Future NERC Congestion Management Tool Option 3A (Proposed by NERC/NAESB TLR TF) 5/11/2005.
Business Practices Subcommittee Update August 17, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair September 13 th, 2012.
Business Practices Subcommittee Update February 2, 2010.
Business Practices Subcommittee Update February 1, 2011.
Business Practices Subcommittee Update April 30, 2012.
© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012.
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Enhanced Curtailment Calculator Task Force Report
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
BAL-002-WECC-1 Contingency Reserves
Unscheduled Flow What direction for the Future
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
FERC Order minute Scheduling.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
FEBRUARY 27, 2013 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS Parallel Flow Visualization Overview 1.
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
UFMP methodology changes in the updated webSAS February 2015 A video presentation reviewing the webSAS UFMP methodology changes going into effect March.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
SPP.org 1. 2 Aggregate Transmission Service Study (ATSS)
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Business Practices Subcommittee
Peak RCCo Performance Metrics Draft –November 2013.
Business Practices Subcommittee Update May 4, 2010.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
ATC/TTC Basics Transmission Customer Forum Doug McLaughlin 9/22/06 Transmission Customer Forum Doug McLaughlin 9/22/06.
Reload PFV September 12, Reload PFV  Concern that need to be addressed:  The RC need to have an option in PFV to allow gradual reload of markets.
Flowgate Allocation Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Parallel Flow Visualization Project NERC ORS Meeting May 4, 2011.
Electronic Scheduling /Information Technology Subcommittees (ESS/ITS) Update 2008 Review November 4, 2008.
October 6, 2006 Public Stakeholder Review Portland, Oregon Conditional Firm.
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
Standards Review Subcommittee Update August 17, 2010.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
Generator Prioritization Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
NAESB BPS UPDATE TO EXECUTIVE COMMITTEE AUGUST 21, 2012 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS PARALLEL FLOW VISUALIZATION PROJECT 1.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
1 Parallel Flow Visualization Goals NAESB BPS Meeting September 15-16, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update
Wind Management at MISO
Phase Angle Limitations
Frank Koza – PJM Dave Zwergel – Midwest ISO
Unscheduled Flow Administrative Subcommittee MIC/OC Report
PJM & Midwest ISO Market-to-Market Coordination (APEx Conference 2007)
Pseudo-tie business procedure
Mgr. Interconnection Reliability Initiatives
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
Enhanced Curtailment Calculator (ECC)
Future NERC Congestion Management Tool Option 3A (Proposed by NERC/NAESB TLR TF) 5/11/2005.
Request for Information IDC Granularity Option 3/3A
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
UFMP methodology changes in the updated webSAS
Two-Tier Firm Curtailment Overview
NERC Congestion Management
WIAB WECC Interchange Authority Backup
Pseudo-tie business procedure
Presentation transcript:

RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR

2005 SUMMER PEAK OPERATIONS

2005 OPERATING CHALLENGES Record peak loads – 2008 forecasts Transmission system stressed Congestion Management procedures Lake Agnes / Osceola Lake Bryan / International Drive Andytown / Orange River 500 KV Hurricanes – Cones of uncertainty Generation Impacts Transmission Reliability Impacts

CENTRAL FLORIDA FLOWS

SOUTHEAST FLORIDA

2006 OPERATIONAL CHALLENGES A LOOK AHEAD!

OPERATIONAL CONCERNS CENTRAL FLORIDA FLOWS Lake Agnes / Osceola Mitigation Plan CONGESTION MANAGEMENT NERC TLR Level 5 Firm transaction curtailments BA Network / Native Load Contribution Re-Dispatch Options Generation Shift Factors

LAKE AGNES / OSCEOLA MITIGATION PLAN FRCC Operating Reliability Subcommittee (ORS) has developed the plan to aid the RC in maintaining reliability of the Central Florida bulk electric system Mitigation plan involves all operating entities and the Reliability Coordinator OUC operates Lake Agnes / Osceola line TEC operates the new Lake Agnes reactor TEC operates the Lake Agnes / Recker line

Entrance Condition: Actual Loading > 80 % Actual Loading > 80% of Applicable Rating OUC notifies ALL of 80% loading All BA’s must coordinate with RC any generation changes at: McIntosh, Recker sub, Larsen, Winston, Ridge Cane Island, Intercession, Hansel, Theme Park RC evaluates any generation change for impact on flowgate and develop recommendation or action plan if required LAKE AGNES / OSCEOLA MITIGATION PLAN

Entrance Condition: Actual Loading > 90 % Actual Loading > 90% of Applicable Rating RC will Request BAs provide all Non-firm transactions that are scheduled within their BA area (tagged and un-tagged). Schedules internal to a BA identified IDC does not currently apply transfer distribution factors to these transactions The RC will perform a NERC “Study TLR” All Non-firm and Firm BA to BA transactions identified LAKE AGNES / OSCEOLA MITIGATION PLAN

Entrance Condition: Actual Loading > 100 % RC will immediately notify OUC of real time overload OUC will provide the RC with an evaluation of the line loading based on current ambient weather conditions. Summer rating 444 MVA Upon evaluation of the line loading with current weather conditions, the RC will take appropriate steps listed in “Mitigation Steps”, as necessary to reduce loading. LAKE AGNES / OSCEOLA MITIGATION PLAN

CONTINGENCY OVERLOADS Entrance Conditions Post-Contingency Loading > 100% rating but < 130% rating RC to pre-plan to implement the appropriate steps listed in “Mitigation Steps”, as necessary ONLY if the contingency occurs. Post-Contingency Loading > 130% rating RC to begin implementing the appropriate steps listed in “Mitigation Steps” as necessary, to reduce post- contingency loading below 130%.

MITIGATION STEPS Step 1: BA’s to implement voluntary Solutions May implement generation re-dispatch May split bus at Cane Island (719,713,709 &703) (OUC/KUA) - this action assumes minimal or no generation at Cane Island. Transmission Providers may implement local procedures to curtail Non-firm transactions based on RC’s NERC IDC “Study TLR’s” suggested curtailment priority, and per their tariff. BAs may curtail Non-firm transactions. May OPEN - Lake Agnes / Recker 230 KV line - (TEC).

MITIGATION STEPS Step 2: Place Lake Agnes Reactor in Service Requirements Real Time overload exists Post contingency overload > 130% of applicable rating Reactor may also be used as part of a mitigation plan to be implemented following a contingency for conditions where post contingency overload is greater than 100% but less than 130% RC to direct TEC to open Lake Agnes reactor bypass breaker TEC to open the bypass breaker at the direction of the RC

MITIGATION STEPS Step 3: Implement Appropriate NERC TLR Level RC will initiate non-firm TLR on Lake Agnes / Osceola flowgate in NERC IDC All non-firm transactions on flowgate will be curtailed or re-allocated RC will direct BA’s to curtail all non-firm transactions within the BA boundaries as identified in 90% loading condition prior to elevating to NERC TLR Level 5 RC will initiate Firm TLR on Lake Agnes / Osceola flowgate in NERC IDC Firm (7-F) transactions will be curtailed on pro-rata basis along with Firm (7-FN) Network Integration Service and Network/Native Load (NNL)

NERC TLR 5 REVIEW Firm Point to Point Transactions (7-F) Firm Network Integration Service (7-FN) Firm Network & Native Load (NNL) Generation Re-Dispatch NERC IDC Tool Generation Shift Factor viewer

FIRM CURTAILMENTS FIRM POINT TO POINT (7-F) Transmission service sold across a transmission provider designating Firm priority of use Transmission provider responsible for honoring in pro-rata fashion with network service and native load Must be curtailed during TLR Level 5

FIRM CURTAILMENTS FIRM NETWORK INTEGRATION (7-FN) Transmission service supporting tagged transactions for Firm Network Resources located outside owner’s host Balancing Authority Will be identified within IDC and re-dispatch option will be provided RC will indicate curtailment or re-dispatch on IDC congestion management report based on host BA’s option

FIRM CURTAILMENTS FIRM NETWORK & NATIVE LOAD (NNL) Flow identified on flowgate as a result of dispatch of network resources to native load Relief on flowgate achieved via generation re- dispatch or load shed Generation Shift Factors used to calculate required re-dispatch to achieve prescribed relief

GENERATION RE-DISPATCH Reduce impacting flow on flowgate Shift generation equally on both sides Lowering source side generation (decremental units) Raising sink side generation (incremental units) May combine multiple units to achieve relief Voluntary – Option of BA Directive – Issued by RC under real time overload or IROL conditions

GENERATION SHIFT FACTORS NERC Distribution and Shift Factor Viewer You can request access to the NERC Factors Viewer at the following address: SAMPLE TLR PAGE

NON-FIRM TLR

NON-Firm Relief Allocation

Impacted Schedules

Need Firm to Achieve Relief Allows for credit of re- dispatch performed prior to level 5

FIRM TLR

Non Firm / Firm Relief Allocation

NNL ALLOCATIONS

ALL IMPACTED SCHEDULES

ACTUAL FLOWS OVERVIEW