LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS-03929-03 Test Suite: –CE102 Conducted Emissions, Power.

Slides:



Advertisements
Similar presentations
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 1 GLAST Large Area Telescope LAT Pre-Shipment Review EMI/EMC Michael.
Advertisements

GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
Where to put Towers A and B in the Grid – technical issues 18-Jan-2005 L. Wai (SLAC/Group K) for LAT I&T.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
LAT EQUIPMENT EMI REQUIREMENTS PART TWO CONDUCTED EMISSIONS AND SUSCEPTIBILITY.
GLAST LAT Project LAT System Engineering 1 NCR Status Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project July 12, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller Monitoring V6 1 GLAST Large Area Telescope: Electronics, Data.
GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 1 GLAST Large Area Telescope: Presented by G. Haller SLAC (650)
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Temperature Uncertainty Budget and Calibration Fred Best 9 March 2004.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectCDR/CD3 May 12-15, 2003 G. Haller Elec LAT Design 1 Changes since PDR Spacecraft Selection and Meetings: –PDU was moved to opposite.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
The power supply system of the AMS experiment M. Menichelli, L. Accardo, G. Ambrosi, R. Battiston, M. Bizzarri, S. Blasko, D. Cosson, E. M. Fiori, O. Maris,
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 4 1 GLAST Large Area Telescope: Instrument Design Overview Lowell A. Klaisner.
TS9975 Konyang University 20 th July to 22 nd July 05.
LAT Environmental Test PDR1 GLAST LAT Project 3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 EMI/EMC LAT Environmental Test.
GLAST LAT ProjectPDU TRR, July, DAQ & FSWV4 1 GLAST Large Area Telescope: Presented by P. Young SLAC (650)
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 1 GLAST Large Area Telescope: AntiCoincidence Detector.
GLAST Large Area Telescope:
Piero Belforte, CSELT 1999: AEI_EMC_, EMC basics by Flavio Maggioni.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
NSG 4070 Signal generator and immunity test system Dr. Heinrich
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Software TS9975 uses EMC32. I-Key -> E+.
Solar Probe Plus – FIELDS Main Electronics Package
Mini-Tower test results
Solar Probe Plus FIELDS Main Electronics Package iPER EMC Feb 2, 2017
R&D of neutrino beam production for future (Multi-)MW proton facility:
GLAST Large Area Telescope:
LAT Requirements Verification in TVAC
EMC Lab presentation.
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope:
1. Introduction and Overview
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
Authors C. Rivetta– Fermilab. F. Arteche , F. Szoncso, - CERN
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope:
Design Integration and Analysis
Presentation transcript:

LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS Test Suite: –CE102 Conducted Emissions, Power Leads, 10 kHz to 10 MHz, MIL-STD-462, CE03 –CECM Conducted Emissions, Time Domain, 150 MHz Bandwidth –CS102 Conducted Susceptibility, Power Leads, 10 kHz to 10 MHz, MIL-STD-462, CS02 –CSCM Conducted Susceptibility, Common Mode, 30 Hz to 150 MHz, MIL-STD-462, CS02 –CS06 Conducted Susceptibility, Spike, Power Leads, MIL-STD-462 –RE101 Radiated Emissions, Magnetic Field, 20 Hz to 50 kHz –RE102 Radiated Emissions, Electric Field, 10 kHz to 18 GHz, MIL-STD-461E –RS101 Radiated Susceptibility, Magnetic Field, 20 Hz to 50 kHz –RS103 Radiated Susceptibility, Electric Field, 30 MHz to 18 GHz

LAT Power Interfaces SC-LAT Power Interfaces –SC PRU (P) - LAT PDU –SC PRU (R) - LAT PDU –SC PRU (P) - LAT SIU (P) –SC PRU (R) - LAT SIU (R) –SC PRU (P) - LAT VCHP +Y –SC PRU (P) - LAT VCHP -Y –SC PRU (R) - LAT VCHP +Y –SC PRU (R) - LAT VCHP -Y –SC PDU (P) - LAT MAKEUP –SC PDU (R) - LAT MAKEUP

Test Limitations RS103 upper limit of 18GHz (40GHz) Limited area of RS101 test –Requires scanning each 10cm x 10cm area, ~16min/scan –~1450 scans for the LAT, another ~1200 for the radiators (~29 days) –Scan selected locations around connectors, PMTs, BEA Limited B side conducted testing –Emissions tests and susceptibility only where noted on A side Limited VCHP htr testing –Emissions only

EMI Test Configurations Split EMI test –Conducted tests performed in the high bay integration area –Radiated testing performed in anechoic chamber Conducted emissions and susceptibility tests with SIU and PDU do not require radiators, but do require good access to connectors – LAT z axis vertical to provide access to LAT connectors with 2m cable lengths

Radiated Test Configuration

LAT Cable Feedthrough

Conducted Test Considerations Fully test: –SC PRU (P) - LAT PDU –SC PRU (P) - LAT SIU (P) Limited test: –SC PRU (R) - LAT PDU –SC PRU (R) - LAT SIU (R) Need to resolve operating constraints on VCHP htrs –Can they be run for extended periods of time at ambient temp? –Thermostatic overtemp protection –Limited power, ~4W/circuit No plan to test PDU - LAT Makeup –Thermostatic control, open circuit at ambient temp Conducted susceptibility tests may require disabling bus protection unit

Conducted Test Harness Require access to power harness 2m from LAT I/F –CE102, CS102 (10kHz - 150kHz), CSCM (30Hz - 150kHz), CECM –All conductors of power circuit must be connected to a single 1/4” lug on line conditioner –All conductors must be gathered into a bundle so that a current probe may be connected around them Require access to power harness ~5cm for LAT I/F –CS102 (150kHz - 150MHz), CS06, CSCM (150kHz - 150MHz) –Small bare section of a single conductor to attach clip lead for hf injection EMI shielding not required on harnesses

Radiated Test Harness No access to conductors required Harness must be fully shielded –Includes all connector savers Any test ports must be closed out or have shielded harnesses –“back door” Test harnesses must be shielded –Accelerometers –TCs & thermistors Harness supports not directly connected to the LAT should be nonconducting material, wood or PVC

Test Software Emissions Testing –Utilize the FSW Charge Injection Calibration function to inject charge into a large number of detectors. The number of channels into which charge can be injected will be limited by: a) FSW design (which is not yet complete); and b) The number of channels which can physically be injected with charge in any given one second cycle. The one second cycle is required to provide repeatability during the Emissions frequency sweeps. Susceptibility Testing: –A variation of the test described in the End-to-End (ETE) Test Plan, LAT- MD-03489, paragraph 2.2.1, item 4, "Nominal Rate Cosmic Ray Test" will be used. This test is run at ambient temperature and at nominal voltage, timing, threshold, and trigger configurations. Both Cosmics and the external trigger function are used to create on-orbit trigger rates. The external trigger rate will be set so that the total trigger rate will be at or near the nominal expected on-orbit values. –The externally triggered events should have very low occupancy, monitor to see if occupancy goes up –The cosmic ray events should remain constant, monitor to see if rate goes up.

Test EGSE Software Tools Displays of natural trigger rates and occupancy of externally triggered events should be strip chart type Other error status, checksum, etc. should latch

RE102 - Integrated LAT

RE101 – All LAT Equipment

CE102 Spacecraft PRU – LAT DAQ

CE102 Spacecraft PRU – LAT SIU (IL), VCHP Heaters

CE102 Spacecraft PDU – LAT Anti-freeze and Make-up Heaters

Conducted Emissions Common Mode – All LAT Equipment

RS103 Perform – BEA and Tracker Tower

RS101 Perform – BEA and Tracker Tower

CS102 Spacecraft PRU – LAT DAQ

CS102 Spacecraft PRU – LAT SIU (IL), VCHP Heaters

CS102 Spacecraft PDU – LAT Anti-freeze and Make-up Heaters

Conducted Susceptibility Common Mode – All LAT Equipment

CS06 Operate – All LAT Equipment

CS06 Perform – All LAT Equipment

Back-up Slides

CE 102 LAT PDU – TPS (TEM, CAL, TRKR), EPU (IL), GASU (ACD BEA, IL), PDU (IL)

CS102 LAT PDU – TPS (TEM, CAL, TRKR), EPU (IL), GASU (ACD BEA, IL), PDU (IL)