LBT Q2 2007 Engineering Review ENGG – Engineering General.

Slides:



Advertisements
Similar presentations
Interventions and ToO Observations with the Large Binocular Telescope R. Mark Wagner Research & Instrumentation Scientist LBTO/OSU.
Advertisements

06 April 2009 LBT Q Eng/SW Review LBT Q Eng/SW/Mtn Review OSS – Optical Support Structure Paul Grenz.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
LBT AO Progress Meeting, Arcetri Walter Seifert (ZAH, LSW) The LBT AO System and LUCIFER 1.Requirements for the commissioning of LUCIFER:
Magellan f/5 Planning and Status Andrew Szentgyorgyi Magellan SAC Meeting Pasadena/17 Mar 2012.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review TAL Telescope Alignment.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
M1M3 Status & Near Future Milestones C.Araujo/ J. Sebag 1.
LBT Q Engineering and Software Review ENGG Engineering General.
LBTI Program Management Review Phil Hinz S.H. (Hop) Bailey 2 December
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
LBT Q Software Review GCS – Guiding and Active Optics.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
PA Standards Review 2008 Standard 7c – Disabilities Standard 7c – Disabilities.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Engineering Review SAB Static Balancing.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
FLAO_08 FLAO System Shipping Plan Document 646f010a Richard Demers, Guido Brusa, Armando Riccardi, Daniele Galieni FLAO system external review, Florence,
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
Module 4: Effect of Agile on the DoD Program Office TLO: Given a DoD program involved in software development using Agile philosophy methodologies, the.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Pg 1 21 April 2016 ACTR Meeting SOAR Priorities Jay Elias.
1 Board Telescope & Site Tucson, Arizona July 18-20, 2011 LLST Control Software Review Resources Tucson, January
Area Covered. Work Done Quantity Financial Progress of work.
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
Pyramid sensors for AO and co-phasing
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
Facility Concept Design and Study
Chuck F Claver LSST System Scientist & Commissioning Lead
FY18 Mid-Year School Financial Review January 17, 2018
Organization Audit, Risk and Compliance (ARC)
Planning Process Strategic Plan Operational Priorities
April May April May June July July June August Sept August
On-Line Certificate System
Magnet, Support and Infrastructure
WFD and Hydro-morphology
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
SNS-PPU upgrades the existing accelerator structure
MAORY Status of the project
PLAN OF WORK Plan of work is the general scheduling of program according to major activities (or phases) such as planning, implementation and evaluation.
Presentation transcript:

LBT Q Engineering Review ENGG – Engineering General

10-July-2007LBT Q Engineering Review Highlights (Q2/2007) Spending on target Spending on target Hired Andrew Rakich (June) Hired Andrew Rakich (June) Hired AJ Brotherton (May) Hired AJ Brotherton (May) Launched Mirror Cell Documentation Launched Mirror Cell Documentation Test Camera Design Review Test Camera Design Review Dynamic Balancing Design Review Dynamic Balancing Design Review Acceptance test AGw #3 Acceptance test AGw #3 LINC progress meeting LINC progress meeting Lucifer progress meeting Lucifer progress meeting Board meeting Heidelberg Board meeting Heidelberg Launched Azimuth Track Protection Meeting Launched Azimuth Track Protection Meeting Visit by Pierre Sangasset (ESO) Visit by Pierre Sangasset (ESO)

10-July-2007LBT Q Engineering Review Open Issues Technical Technical Mirror covers – Temporary and Facility Mirror covers – Temporary and Facility Telescope alignment plan Telescope alignment plan Vibration mitigation effort Vibration mitigation effort Schedule Schedule Extremely tight schedule for Gregorian preparation work Extremely tight schedule for Gregorian preparation work Slow progress on telescope commissioning Slow progress on telescope commissioning Financial Financial Tight but reasonable budget – tight cost control essential Tight but reasonable budget – tight cost control essential Hardpoint re-build unbudgeted Hardpoint re-build unbudgeted DYB budget uncertainty DYB budget uncertainty Resource Resource High pressure and work load on group High pressure and work load on group Mountain support and resources Mountain support and resources Tech support in Tucson Tech support in Tucson

10-July-2007LBT Q Engineering Review Progress (Q2/2007) Andrew Rakich visit √ Andrew Rakich visit √ LGS meeting May √ LGS meeting May √ LINC/Lucifer meeting May √ LINC/Lucifer meeting May √ LBT Board meeting May √ LBT Board meeting May √ Mirror cover test May - Cancelled Mirror cover test May - Cancelled AGw #3 acceptance test May – Rescheduled for July √ AGw #3 acceptance test May – Rescheduled for July √ LBC Red cryostat acceptance testing May/June - Postponed LBC Red cryostat acceptance testing May/June - Postponed New student hire: Matthew Stohr √ New student hire: Matthew Stohr √ Vibration measurement campaign end of June - Postponed Vibration measurement campaign end of June - Postponed AO progress meetings / follow-up √ AO progress meetings / follow-up √ Test Camera progress follow-up √ Test Camera progress follow-up √ Vacation √ Vacation √

10-July-2007LBT Q Engineering Review Planning (Q3/2007) Visit to ADS, Microgate, Arcetri Visit to ADS, Microgate, Arcetri Progress meeting Test Camera Progress meeting Test Camera Shipping of AGW #3 to Arizona Shipping of AGW #3 to Arizona Acceptance LBC-Red Cryostat Acceptance LBC-Red Cryostat Meeting on LBT future instrumentation (Sept) Meeting on LBT future instrumentation (Sept) Board meeting Rome (Sept) Board meeting Rome (Sept)