2011 Annual Conference Chicago Driving Predictable Business Outcomes in a Dynamic Global Market Opening Comments Noé Hernández-Sáenz (Moderator) Burns.

Slides:



Advertisements
Similar presentations
COAA Industry Benchmarking What gets measured, gets improved! “When you’re average, you’re just as close to the bottom as you are to the top.”
Advertisements

MOL GROUP CONTRACTOR HSE MANAGEMENT New Elements of Contractor Safety BÉLA CSEH – MOL Group HSE Director Supplier Forum - Budapest, 14 th November 2007.
Improving Your Business Results Six Sigma Qualtec Six Sigma Qualtec Six Sigma Qualtec – All Rights Reserved June 26, 2002 BEYOND SIX SIGMA: A HOLISTIC.
SAFETY & QUALITY MANAGEMENT IMPROVE SAFETY WITH QUALITY & PRODUCTIVITY BENEFITS Dave Copley, Matt Pierce.
INDUSTRIAL & SYSTEMS ENGINEERING
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Benchmarking at Saudi Aramco
1 PMIG PUBLIC SECTOR PROCUREMENT BEST PRACTICES & LESSONS LEARNED Kevin James Barrie Kroukamp.
Working Safely in Global Construction
Performance Management Measuring Performance Using Information to Improve Performance.
John M. White, Health Services 1 Building a Healthy Culture Key Elements of a Comprehensive Health Strategy John M. White, Ph.D. Global Health Promotion.
Aker Kvaerner, Inc. CII Benchmarking and Metrics Aker Kvaerner Data Name of presenter: M. Coy Campbell, P.E. Date: 10 June 03.
2005 Engineering & Operations Technical Conference – April Memphis, TN Kerry Bruce Manager, Safety & Health Services Safety Programs That Work Kerry.
Business Analysis: A Business Unit Perspective International Institute of Business Analysis January 18, 2012.
How to Establish a Measurable ROI from Implementing IBM Maximo Asset Management Mountain West Maximo User Group Monday, August 3 rd, 2015 Created by Leon.
Best Practices for Operational Risk Management Information, Insight & Improvement Todd Lunsford, Sr. Manager Solution Engineering Operational Excellence.
Making Zero Field Rework A Reality Workshop
Working Definition of Program Evaluation
Chapter 6 : Software Metrics
32 nd National Energy & Environmental Conference September 19, 2005 Benchmarking the Engineering & Construction Industry.
The aim / learning outcome of this module is to understand how to gather and use data effectively to plan the development of recycling and composting.
Development of a Comprehensive Framework for the Efficiency Measurement of Road Maintenance Strategies using Data Envelopment Analysis by Mehmet Egemen.
Effective Energy Management. 1.Develop baseline 2.Identify and quantify savings opportunities 3.Measure and benchmark to sustain efforts.
Lecture 4 Software Metrics
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
FACILITATOR Prof. Dr. Mohammad Majid Mahmood Art of Leadership & Motivation HRM – 760 Lecture - 25.
1 st PMI AGC ENERGY FORUM: DMS DEBATES June 2, 2010 EPCs Should be on a Bonus Incentive Scheme to Exceed Contract Expectations Dependability, Expertise,
Multiple Partnering Consortium A Case Study Greg Holthouse, Fru-Con Dwayne Wilson, Fluor A Case Study Greg Holthouse, Fru-Con Dwayne Wilson, Fluor CPI.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Project Procurement Management
Benchmarking in the Information Technology Age Dave Hile Cherne Contracting Corporation CII Benchmarking & Metrics Committee 2000 CII Annual Conference.
2015 CII Annual Conference August 3-5 Boston, Massachusetts Art MarkmanNoé SáenzStephen Mulva Univ. of Texas / HDOBurns & McDonnellUniv. of Texas / CII.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
The Quest for Injury-Free Performance “An Intel Perspective”
Chapter 3: Purchasing Research and Planning Strategic Planning for Purchasing Strategic planning for purchasing involves the identification of critical.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
1 National Construction Safety Executive Meeting April 22, 2009 New Orleans, LA Presented by: Andy Peters Vice President SH&E.
CII Benchmarking and Metrics Implementation Session Don’t Gamble with Your Project’s Performance Harold Helland, Abbott Bob Herrington, Jacobs Stephen.
CII Annual Conference San Diego, California July 25-27, 2006 Committee Presentation Benchmarking & Metrics Committee Industry Demands Clear Measurements:
Performance Management… …From Vision to Results.
Integrating CII Best Practices into Project Teams
Managing Change Through Implementation
Visit Mendocino County: Strategic Direction 2017/ /20
Introducing pdri for mega projects As a Planning quality Control tool
Highlights of the 2007 NRMCA Industry Data Survey
Cloud University Live: 8 Steps to Build Your Cloud Go to Market Plan
Making Zero Accidents A Reality
Quantifying the Cumulative Impact of Change Orders
Multiple Partnering Consortium
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Forecasting and Minimizing Field Rework
Noé Hernández-Sáenz Burns & McDonnell Engineering
RAJEEV GANDHI COLLEGE OF MANAGEMENT STUDIES
Continuing the journey of…
TechStambha PMP Certification Training
Financial Statement Analysis
2017 On the Ball Initiative On the Ball is a collaborative HSE initiative designed to refresh and re-energise HSE , with the ultimate goal of achieving.
Key Performance Indicators
Safety Assessment Efficiency Group 2 - Exercise 1
CIS12-3 IT Project Management
Breakout Session Summary Construction
Software metrics.
Departure View Glossary
Contemporary Issues of HRM
Metrics That Work for You
Honoraria for Design Build Projects Methodology Assessment Matrix
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

2011 Annual Conference Chicago Driving Predictable Business Outcomes in a Dynamic Global Market Opening Comments Noé Hernández-Sáenz (Moderator) Burns & McDonnell Engineering

Agenda Safety Moment Context Implementation Session Panelists –Paul Woldy (Chevron) Financial Analyses (Owners and Contractors) –Stephen Mulva (CII) Value of Best Practices –Jesus M. de la Garza (Virginia Tech) Safety Data Trends / Findings –Kirk Morrow (S&B Engineers and Constructors LTD) Regional (Gulf Coast) Productivity Findings Q&A

2011 Annual Conference Chicago Driving Predictable Business Outcomes in a Dynamic Global Market Financial Analyses (Owners and Contractors) Paul Woldy Chevron

Dow Jones Industrial Average vs. CII Owner/Contractor Cohort Index (Normalized to FY2000) Dow Jones Industrial Average (Annual Avg. Improvement) CII Owner Cohort Index (Annual Avg. Improvement) CII Contractor Cohort Index (Annual Avg. Improvement) 1991 → %+30.6%+7.7% 1995 → %+27.7%+4.8% 2000 → %+8.3%+7.0% 2005 → %+10.9%+12.6% 2008 → %-4.7%-12.1%

Owner Project & Financial Performance

Cash Flow/Capital Expenditure CII Owner BMM Cohort vs. CII Owner Cohort (Annual Avg. Improvement) CII Owner Cohort vs. Non-CII Owner Cohort (Annual Avg. Improvement) 1997 → %+7.0% 2000 → %+9.4% 2005 → %+3.1% 2008 → %+14.6% Data courtesy of UT McCombs School of Business

Economic Value Added/Cash Flow CII Owner BMM Cohort vs. CII Owner Cohort (Annual Avg. Improvement) CII Owner Cohort vs. Non-CII Owner Cohort (Annual Avg. Improvement) 2002 → %+11.6% 2005 → %+13.5% 2008 → %+50.9% Data courtesy of UT McCombs School of Business

Contractor Project & Financial Performance

CII BMM Contractor Cohort Project Performance Project Cost Growth (Absolute Difference) Project Schedule Growth (Absolute Difference) 2000 vs %+1.3% 2005 vs %+2.8% Data source: CII Benchmarking & Metrics Program

CII Contractor BMM Cohort vs. CII Contractor Cohort (Annual Avg. Improvement) CII Contractor Cohort vs. Non-CII Contractor Cohort (Annual Avg. Improvement) 2004 → %+47.0% New Contracts Data source: Engineering News Record (ENR)

Economic Value Added FY /New Contracts FY-1 CII Contractor BMM Cohort vs. CII Contractor Cohort (Annual Avg. Improvement) CII Contractor Cohort vs. Non-CII Contractor Cohort (Annual Avg. Improvement) 2005 → %+16.4% 2008 → %+19.7% Data source: UT McCombs School of Business / ENR

2011 Annual Conference Chicago Driving Predictable Business Outcomes in a Dynamic Global Market Value of Best Practices Stephen Mulva CII

Best Practices –Survey of 306 CII Projects ( ) –Corporate and Project Levels Benchmarking Context: 5 Principles of Project Integration –Work and Work Process –Organizational Engineering –Leadership and Governance –Communication and Information Flow –Culture and Environment Point of Departure

Reporting Practice Use Data Zero Accidents Techniques Safety techniques include site specific safety programs and implementation, and auditing and incentive efforts to create a project environment and a level of training that embraces the mind set that all accidents are preventable, and that zero accidents are an obtainable goal.

Use of Best Practices Begins with strong leadership; ends with improved performance. Corporate Strategy Project Level Use of Best Practices (Tactic) Project Performance (Bottom Line) Front End Planning Zero Accidents Techniques Constructability Cost Schedule Safety Quality Change Leadership Improvement culture Funding Incentive Dedicated team

16 Culture A relationship exists between culture and best practice use

17 Project Response Rate

Percent of Projects with High Best Practice Use Project Response Rate

Impact of Planning Best Practice Use on Cost Performance: Owners Front End Planning Alignment for FEP Planning for Start-up =standard error of mean

Impact of Execution Best Practice Use on Cost Performance: Contractors Constructability Project Risk Assessment Change Management =standard error of mean

Owners Use of Front End Planning =standard error of mean

Owners Use of Partnering =standard error of mean

Owners Use of Change Management =standard error of mean

Owners Use of Planning for Startup =standard error of mean

Contractors Use of Constructability =standard error of mean

Contractors Use of Planning for Startup =standard error of mean

CII Performance Assessment System (PAS) Data Miner

2011 Annual Conference Chicago Driving Predictable Business Outcomes in a Dynamic Global Market Safety Data Trends and Findings Jesus M. de la Garza Virginia Tech

Data Envelopment Analysis A Non-Parametric Performance Measurement Evaluation Technique A Non-Parametric Performance Measurement Evaluation Technique InputsOutputs 1/RIR 1/DART Zero Accident Techniques Best Practice Implementation Score Efficiency = Outputs Inputs Decision Making Unit = a project

Calculating the Best Practice Implementation Score (BPIS) ∑ 108 points Zero Accidents Technique FieldsWeight Existence of safety plan10 Frequency of near-miss investigations10 Frequency of safety audits10 Frequency of toolbox meetings10 Level of safety orientation for new-hires10 Safety risk identification in safety plan10 Time commitment of safety supervisor10 Use of safety as criteria for subcontractor selection8 Extent of incentive use6 Extent of pre-employment drug screenings6 Frequency of random drug screenings6 Monthly ongoing safety training6 Site workers per safety professional6

Calculating the Best Practice Implementation Score (BPIS) If data are available for all 13 elements –Normalize to a maximum of 108 points –BPIS= (∑ points scored/108)*10 If data are missing for up to 4 elements –Ignore missing elements and their weights –Re-normalize to include only actual data –BPIS= (∑ points scored/???)*10

Selecting Homogeneous Projects 221 Projects from CII Database 47 Homogeneous Projects Location: Only included lower 48 states Character: Brownfield removed Typical: Non-typical projects removed Survey Completeness: Projects with missing data removed Missing BPIS Fields: ≥ 5 “I Don’t Know” removed Type: Only included Light & Heavy Industrial

47 Homogeneous Projects Inherently Efficient Projects Remainder for Analysis RIR = 0 RIR > 0

1/RIR vs. Normalized BPIS

A A’A’ BPIS= 7.74; 1/RIR = 2.02; Eff = 0.55 BPIS= 7.74; 1/RIR = 3.67; Eff = 1.00 DEA Estimated Efficient Frontier True Efficient Frontier = 1/0 = ∞

1/DART vs. Normalized BPIS

Issues and Next Steps DEA can handle multiple inputs and multiple outputs –(l) Best Practice Implementation Score; (O) 1/RIR & 1/DART We need to study other ways to recalculate the Best Practice Implementation Score when data elements are missing We can generate other homogeneous datasets by adjusting the filters –e.g., Light Industrial vs. Heavy Industrial We can apply “Meta Frontier” techniques to compare the performance across multiple homogenous datasets We can extend this type of DEA analyses to other Best Practices

Data Envelopment Analysis A Non-Parametric Performance Measurement Evaluation Technique A Non-Parametric Performance Measurement Evaluation Technique InputsOutputs 1/RIR 1/DART Zero Accident Techniques Best Practice Implementation Score Efficiency = Outputs Inputs DMU = a project

How do we use this Toolkit? Remember: –Efficient projects are those with RIR = 0 Leave nothing to chance, typically with High BPIS By pure luck, typically with Low BPIS –A Benchmarking Toolkit Determine the relative Safety efficiency of a project Given a BPIS, determine the Safety experience a project should expect Compare a project against “peer” projects

2011 Annual Conference Chicago Driving Predictable Business Outcomes in a Dynamic Global Market Construction Productivity: A First Look at Regional Analysis and Reporting Kirk Morrow S&B Engineers and Constructors, LTD

CII BM&M Construction Productivity Definition Appropriate Level of Detail Only Direct Work-Hours Common Definitions for Direct/Indirect Accounts Raw Productivity = Actual Direct Construction Wk-hrs Quantity Installed

CII BMM Construction Productivity Database 124 U.S. projects with construction productivity data Not every project answers each metric

CII BMM Construction Productivity Database

Construction Productivity: Gulf Coast vs. Other Locations Only the productivity difference between gulf coast and other U.S. locations; Not enough data to examine other factors concurrently.

Concrete Gulf Coast Other Locations

Structural Steel Gulf Coast Other Locations

Electrical Gulf Coast Other Locations

Instrumentation Gulf Coast 2519 Other Locations 1415

Piping Gulf Coast Other Locations

Insulation Gulf Coast 1720 Other Locations 1518