1 EASTERN MUNICIPAL WATER DISTRICT Proposed Revisions to the Administrative Code Elizabeth Lovsted, PE Sr. Civil Engineer July 8, 2015.

Slides:



Advertisements
Similar presentations
Status of Wastewater Implementation February 20, 2013 Elizabeth Wood Monroe County, Sr. Administrator – Sewer Projects.
Advertisements

Public Workshop Implementation and Enforcement of Nutrient TMDLs for Lake Elsinore and Canyon Lake CA Regional Water Quality Control Board (Regional Water.
The Irrigation Technology Center Proposed Flow Meter Installation Laboratory.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
Catherine Elvert City of Palo Alto Utilities Communications Manager.
Statewide Water Needs and future estimated costs September 20, 2011.
Sector Planning Process Alachua County Commission July 8 th,
© 2013 All rights reserved. Chapter 10 Municipal Agencies1 New York Real Estate for Salespersons, 5 th e By Marcia Darvin Spada Cengage Learning.
Design Manual Update City of Tacoma Public Meeting April 10, 2014 Jim Parvey, P.E., LEED AP City of Tacoma Senior Principal Engineer.
CPA-14-08: Transfer of Development Rights Large Scale Text Amendment Adoption Hearing Board of County Commissioners September 23, 2008.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
June 10, 2008 Board of County Commissioners B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Transmittal Hearing.
Conservation and Reuse Water Savings (Task 3.2) Alan H. Plummer, Jr., P.E., BCEE Alan Plummer and Associates.
PRESENTATION TO THE FORT ORD REUSE AUTHORITY BOARD OF DIRECTORS JULY 12, 2013 Capital Improvement Program FY 2013/14.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
Water Supply Facilities Work Plan Technical Assistance Workshop.
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT 2016 Legislative Priorities and Strategy, and Policy Principles Jolene Walsh, Senior Director of Public.
1 EASTERN MUNICIPAL WATER DISTRICT Drought Response Elizabeth Lovsted, PEJolene Walsh Dr. Civil EngineerSr. Director of Public & May 8, 2015Governmental.
Administration Code Changes to Incorporate Graywater Policy Principles Jayne Joy, P.E. Director, Environmental & Regulatory Compliance January 2016 EASTERN.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Implementing the MWD Water Supply Allocation Plan for Sub Agencies Elizabeth Lovsted, PE Sr. Civil Engineer.
Water Rate Presentation City Council Meeting December 14, 2010.
1 EASTERN MUNICIPAL WATER DISTRICT Water Use Efficiency Master Plan Elizabeth Lovsted, PE Senior Civil Engineer January 16, 2016.
Adopt Water Supply Alert Resolution Water Planning and Stewardship Committee 8-9 June 9, 2008.
Planning and Community Development Department FY 2015 Operating Budget June 2, 2014.
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
1 EASTERN MUNICIPAL WATER DISTRICT Drought Response – Implementing the New Landscape Requirements Elizabeth Lovsted, PE Sr. Civil Engineer.
EASTERN MUNICIPAL WATER DISTRICT Proposed Emergency Regulations Elizabeth Lovsted Sr. Civil Engineer March 17,
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2015 / 16 First Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
Monthly Reporting on Drought Response
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
Water Booster Station Improvement Study
California Department of Education
Monthly Drought Reporting to the State Water Resources Control Board
Monthly Drought Reporting to the State Water Resources Control Board
Monthly Drought Reporting to the State Water Resources Control Board
Monthly Drought Reporting to the State Water Resources Control Board
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities Jayne Joy, P.E. February 9, 2017.
2015 Urban Water Management Plan Overview
Proposed Water Neutrality Ordinance
Capital Plan Update and Five-Year CIP
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Large scale development groundwater balance
Elizabeth Lovsted, P.E. February 15, 2017
Cottonwood Recycled Water Pipeline (West)
Monthly Drought Reporting to the State Water Resources Control Board
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities, Phase 2 (ESCA II) Jayne Joy, P.E. July 18, 2017.
Utah Water Conservation Forum – 5/12/2017
FY Proposed Budget and Rates
Revisions to the Administrative Code
Biennial Budget Update for FY & FY
Elimination of Non-Functional Turf
Policy Principles for the Allocation of Recycled Water
Cost of Service Analysis & Rate Design
Mountain Avenue West Recharge Basin Project
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Santa Ana River Conservation and Conjunctive Use Program Update
City-wide LED Street Light Conversion Program
System Development Fees
Department Activities
PUBLIC HEARING: ESTABLISH A 20% WATER CONSERVATION TARGET AND IMPLEMENT LEVEL 1 WATER SUPPLY SHORTAGE PLAN March 27, 2017 Item 9.
FY st Draft Budget Administration & Finance Committee Municipal Water District of Orange County February 14, 2018.
Staff Advisory Team Meeting #5 October 18, 2018
Measure – V Facilities Update April 8th, 2019
Paul D. Jones II, P.E., General Manager August 25, 2016
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Presentation transcript:

1 EASTERN MUNICIPAL WATER DISTRICT Proposed Revisions to the Administrative Code Elizabeth Lovsted, PE Sr. Civil Engineer July 8, 2015

2 Offset Requirement March 26, 2014 offset requirement approved for projects requiring a Water Supply Assessment : “Projects requesting a water supply assessment that will increase water demand above what was assumed in the General Plan used to develop projections in the most recent Urban Water Management Plan will be required to offset the demand increase with a new water supply or conservation.”

3 Revise Project Threshold Most projects are under the threshold for a Water Supply Assessment EMWD is currently in the process of updating: o Water Supply Master Plan and Facilities Plan o Urban Water Management Plan o Capital Plan Recommend revising requirement to apply to smaller projects: o Any land use change that will increase water demand by 10 acre-feet/year or more (equivalent to approximately 25 single family detached units)

4 Offset Options Offset requirement can be met: o Through reduced demand in the project EMWD approved list of devices/actions o By funding additional conservation/water supplies o Through a reduction in water use at a project owned by the same developer Must be developed before or near the same time as the proposed project Offset will be conditioned at the plan of service stage o Water Supply Assessments will include requirement for offset Fees paid or actions verified at the time of construction

5 Landscape Meter Restriction A “looped” irrigation system occurs when more than one meter feeds an on site irrigation system “Looped” meters cannot be provided with accurate budgets Revision allows for outdoor water allocation and tiered rate application Proposed revision: “On site irrigation systems shall be supplied with one water meter and shall not be connected to an onsite irrigation system supplied with another meter.”

6 Next Steps Work with stakeholders on implementation plan proposed for smaller projects not requiring a Water Supply Assessment with greater than 10 acre-feet/year demand. o Verify where in the development process new requirements will be applied o Develop tracking mechanisms for these projects Bring Administrative Code Revisions to the Board for Adoption in September 2015.

7 Contact Information EASTERN MUNICIPAL WATER DISTRICT Elizabeth Lovsted, PE Senior Civil Engineer ext