1 Roles of the State and Regional Boards in the basin Plan Amendment Process.

Slides:



Advertisements
Similar presentations
SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
Advertisements

BASIN PLAN AMENDMENTS ADOPTION HEARING Item 2 Water Board Meeting of April 9, 2014 Chuck Curtis and Robert Larsen Lahontan Water Board.
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
Overview of SMARA Responsibilities for Lead Agencies California Department of Conservation Office of Mine Reclamation Leah Gardner Senior Environmental.
Board of Standards and Appeals Community Board 3 / Manhattan June 13, 2011 Introduction Introduction Applications: Applications: –Variances –Special Permits.
Congress and Contractor Personal Conflicts of Interest May 21, 2008 Jon Etherton Etherton and Associates, Inc.
Legislative Rule-Making Process. Three Different Processes Higher Education 29A-3A-1 et seq State Board of Education 29A-3B-1 et seq All other state agencies.
Area Commissions Purpose Area commissions are established to afford additional voluntary citizen participation in decision-making in an advisory.
California Wetlands: Update on new state definition and policy development California Native Plant Society Fall Conservation Symposium September 10, 2011.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
1 State Water Resources Control Board Environmental Review for State Bond Funded Grant Projects Presented by Lisa Lee, Environmental Review Unit.
UNECE and OSCE joint event, Almaty, May 2012
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
SUMMARY OF INFORMAL COMMENTS Temporary Waiver of Terms Regulations May 2006.
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
Summary of Rulemaking in California for the Forensic Alcohol Laboratories Regulation Review Committee Cathy L. Ruebusch, RN, MSN Office of Regulations.
Distinguishing: Clean Air Act, EPA Rules, Regulations and Guidance David Cole U.S. EPA, OAQPS Research Triangle Park, NC.
Strengthening Science Supporting Fishery Management  Standards for Best Available Science  Implementation of OMB’s Peer Review Bulletin  Separation.
Advisory Committee Kickoff Meeting SWRCB Program to Develop Sediment Quality Objectives for Enclosed Bays and Estuaries of California July 29, 2003 CAL/EPA.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
CIVIL RIGHTS IMPACT ANALYSIS Animal and Plant Health Inspection Service Civil Rights Enforcement and Compliance.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
1 CDBG and Environmental Review For Local Officials.
Policy for Maintaining Instream Flows in Northern California Coastal Streams Monitoring and Reporting Provisions for Water Rights Victoria Whitney Deputy.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
1 Completing the CEQA Checklist Terry Rivasplata.
National Public Health Performance Standards Local Assessment Instrument Essential Service:6 Enforce Laws and Regulations that Protect Health and Ensure.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
1 Findings and Board Resolution Steven Blum. 2 CEQA Findings in the Board Resolution  Resolution or separate appended document contains findings critical.
1 Responding to Comments Janet Cox TMDL/Planning Communications Region 2.
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
Rulemaking by APHIS. What is a rule and when must APHIS conduct rulemaking? Under U.S. law, a rule is any requirement of general applicability and future.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
1 1 CEQA Scoping Naomi Feger Planning TMDL Section Leader Region 2.
TMDL for Diazinon in Chollas Creek Watershed TMDL for Diazinon in Chollas Creek Watershed Linda Pardy (858) Jimmy.
Gregory Canyon Landfill San Diego County LEA Gary Erbeck, Director California Integrated Waste Management Board Hearing December 14-15, 2004.
CEQA 101 CEQA City of Sacramento Community Development Dept. March 2016.
Overview of the Surface Mining and Reclamation Act and Designation Process County of San Luis Obispo Office of the County Counsel January 8, 2015.
CEQA 101  CA Legislature passed CEQA in 1970; signed by Governor Reagan  CEQA statutes are found in Public Resources Code sections et seq.  The.
Slide 1 California Implementation Water Board Policies.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Welcome to the Public Comment Hearing on the Proposed Regulatory Update to the California Environmental Quality Act AB 52, Gatto (2014) Heather Baugh Assistant.
1 “Fair Argument” Test Triggering EIR: Friends of “B” Street v City of Hayward Facts & Issue Trial court: city abused discretion in adopting negative declaration.
Section 1557 of the Affordable Care Act
Water Efficiency Ordinance ZCA No. 750
Central Valley Flood Protection Plan Senate Bill 5 Amendments
Chapter 3 Administrative Law Chapter 3: Administrative Law.
Requirements for Low-Level Radioactive Waste Minimization Plans Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
Submittal And Review Of New And Revised Water Quality Standards
Introduction to the California Environmental Quality Act (CEQA)
Water Quality Standards Submittal & Review Process
An Overview of the Small Business Advocacy Review Panel Process
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Planning Commission Public Hearing September 9, 2016
U.S. Coast Guard Regulatory Development
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
Setting Actuarial Standards
Michigan Dept. of Environmental Quality Water Resources Division
National Environmental Policy Act (NEPA)
Relationship between World Bank and Romanian EA requirements
Chapter 6 Powers and Functions of Administrative Agencies.
What is OAL? The Office of Administrative Law (OAL) ensures that agency regulations are clear, necessary, legally valid, and available to the public. OAL.
EPA’S ROLE IN APPROVING BASIN PLAN AMENDMENTS
Presentation transcript:

1 Roles of the State and Regional Boards in the basin Plan Amendment Process

2 Regional Board Responsibilities  CWC §13225 (a) Coordinate with State Board, Other RB’s, and State Agencies in regards to WQ (a) Coordinate with State Board, Other RB’s, and State Agencies in regards to WQ (b) Encourage and assist in waste disposal programs (b) Encourage and assist in waste disposal programs (c) Require as necessary any state or local agency to investigate and report on any technical factors involved in water quality control or to obtain and submit analyses of water (c) Require as necessary any state or local agency to investigate and report on any technical factors involved in water quality control or to obtain and submit analyses of water

3 Regional Board Responsibilities (cont.)  CWC §13225 (d) Request enforcement by appropriate federal, state and local agencies of their respective water quality control laws. (d) Request enforcement by appropriate federal, state and local agencies of their respective water quality control laws. (e) Report rates of compliance with the requirements (e) Report rates of compliance with the requirements (f) Recommend projects to the State Board which may eligible for any financial assistance. (f) Recommend projects to the State Board which may eligible for any financial assistance.

4 Regional Board Responsibilities (cont.2)  CWC §13225 (g) Report any case of suspected contamination in its region (g) Report any case of suspected contamination in its region (h) Provide copies, to the State Board upon request, of any official action (h) Provide copies, to the State Board upon request, of any official action (i) Consider effect of actions on any other gov’t water plan including the California Water Plan (i) Consider effect of actions on any other gov’t water plan including the California Water Plan (j) Encourage coordinated regional planning and action for water quality control (j) Encourage coordinated regional planning and action for water quality control

5 Regional Board Responsibilities (cont.3)  CWC §13225 (k) In consultation with the state board, identify and post on the Internet a summary list of all enforcement actions undertaken by that regional board and the arrangement of those actions, including any fines assessed. This list shall be updated at least quarterly (k) In consultation with the state board, identify and post on the Internet a summary list of all enforcement actions undertaken by that regional board and the arrangement of those actions, including any fines assessed. This list shall be updated at least quarterly

6 Regional Water Board Role  Must adopt, review and amend basin plans for waters within the region  Must designate and protect all existing and potential beneficial uses  May adopt tougher standards than required by federal law  Must ensure enforcement of Water Quality Standards  Have major responsibility for ensuring adequate public participation in basin planning process

7 Regional Water Board Role (cont.)  Required to periodically review and revise plans Under the Clean Water Act, the Regional Water Boards must conduct triennial review of water quality standards for surface waters Under the Clean Water Act, the Regional Water Boards must conduct triennial review of water quality standards for surface waters Must develop TMDLs for impaired waters, most of which are adopted as basin plan amendments Must develop TMDLs for impaired waters, most of which are adopted as basin plan amendments

8 Considerations in Basin Planning  Basin Plans are generally implemented by the Regional Boards through WDRs, Waivers, and Enforcement orders  Basin Plans provide basis for protecting state’s waters by identifying beneficial uses and adopting objectives and implementation plans to protect all of those uses  Waters are also protected by State and federal Anti-Degradation requirements

9 Additional Considerations  CEQA Statute CA Public Resources Code §§21000 et seq. Statute CA Public Resources Code §§21000 et seq. Guidelines 14 CCR §§15000 et seq. Guidelines 14 CCR §§15000 et seq.  Administrative Procedure Act (APA)  Peer Review Statute (Health and Safety Code §57004)  DFG Filing Fee Statute (Fish and Game Code §711.4)

10 Questions?  Next CEQA

11 Additional Considerations  CEQA Statute CA Public Resources Code §§21000 et seq. Statute CA Public Resources Code §§21000 et seq. Guidelines 14 CCR §§15000 et seq. Guidelines 14 CCR §§15000 et seq.  Administrative Procedure Act (APA)  Peer Review Statute (Health and Safety Code §57004)  DFG Filing Fee Statute (Fish and Game Code §711.4)

12 What is CEQA?  A process designed to reveal potential environmental impacts of a project  A vehicle that empowers citizens to influence environmental decision-making  A process not a permit  A legal requirement that can ensure Real public participation Real public participation Mitigation of adverse impacts, whenever feasible Mitigation of adverse impacts, whenever feasible

13 Who Must Comply with CEQA?  CEQA requirements apply to California public agencies (state and local)  Projects proposed by private entities come under CEQA when state or local permits are required

14 How CEQA Works  “CEQA is intended to be interpreted in a manner that affords the fullest possible protection of the environment” (Friends of Mammoth v. Board of Supervisors 8 Cal.3d 247)  Relies on strict adherence to process as a way to ensure public participation in government decision making

15 How CEQA Works  Environmental analysis must include: A description of project A description of project Potential significant impacts Potential significant impacts Review of mitigation and alternatives that will avoid impacts Review of mitigation and alternatives that will avoid impacts Review of cumulative impacts Review of cumulative impacts  All environmental documents are subject to both public and public agency review and comment

16 Finding CEQA  CEQA statute: Public Resources Code §21000 et seq. (California Environmental Quality Act)  CEQA Guidelines: 14 CCR §15000 et seq.  SWRCB implementation regulations: 23 CCR §3720 et seq.  Updated statute, guidelines, caselaw, other info:

17 What is a “Project?”  The “whole of an action” that may cause either A direct physical change in the environment A direct physical change in the environment A reasonably foreseeable indirect physical change in the environment A reasonably foreseeable indirect physical change in the environment  Public agency issuance of a grant, loan, or other financing of a project Categorical exemption for studies (Guidelines § 15306) Categorical exemption for studies (Guidelines § 15306) Guidelines §15378

18 What is a “Project?”  Adoption of a plan or policy that may result in a significant environmental impact  Issuance of a permit, license, or entitlement NPDES permits are exempt from CEQA NPDES permits are exempt from CEQA Guidelines §15378

19 What are Significant Impacts?  A “significant impact” causes a substantial or potentially substantial adverse change in physical conditions in the project area  Environmental review must consider: Direct impacts Direct impacts Reasonably foreseeable indirect impacts Reasonably foreseeable indirect impacts Impacts to the environment including impacts not regulated by the lead agency Impacts to the environment including impacts not regulated by the lead agency Guidelines §15382

20 Levels of Analysis  If the project has no potential for significant adverse impacts: Negative Declaration  If significant impacts can be mitigated to insignificance: Mitigated Negative Declaration  If potential remains for significant impacts: Environmental Impact Report

21 Certified Regulatory Programs  Agency programs designed to protect the environment and ensure public participation Certified by Secretary of the Resources Agency Certified by Secretary of the Resources Agency  Exempt from document formatting requirements of standard CEQA process (similar content) Examples: Examples: Basin Planning and policies including TMDLs (Water Boards)Basin Planning and policies including TMDLs (Water Boards) Timber Harvest Plans (Dept of Forestry and Fire Protection)Timber Harvest Plans (Dept of Forestry and Fire Protection) Coastal Development Permits (California Coastal Commission)Coastal Development Permits (California Coastal Commission)

22 Certified Regulatory Programs  Subject to most “normal” CEQA requirements Cross-agency consultation Cross-agency consultation Public disclosure and review Public disclosure and review Notice, scoping, reasonable range of compliance methods, alternatives analysis, mitigation, cumulative impacts analysis, findings (resolution) Notice, scoping, reasonable range of compliance methods, alternatives analysis, mitigation, cumulative impacts analysis, findings (resolution)

23 CRP Requirements  Project documents constitute “substitute environmental documentation” (SED) Basin Plan amendment Basin Plan amendment Supporting Staff Report Supporting Staff Report Checklist/environmental analysis Checklist/environmental analysis Comments Comments Responses Responses Resolution Resolution

24 SED Levels of Analysis  Neg Dec-level SED  Mitigated Neg Dec-level SED  EIR-level SED

25 Environmental Analysis  Meets CEQA objectives: Considers potential impacts Considers potential impacts Considers range of compliance methods Considers range of compliance methods Evaluates mitigation, alternatives to the project, cumulative Impacts Evaluates mitigation, alternatives to the project, cumulative Impacts

26 CRP Process  Basin Plan amendments under the CRP follow the public process for Basin Planning Noticing and public review periods Noticing and public review periods SED elements and organization SED elements and organization Follow Water Board CEQA regulations (currently under revision) Follow Water Board CEQA regulations (currently under revision)  State Board SED process satisfies the CEQA procedural requirements as well

27 Questions?  Next Peer Review

28 Additional Considerations  CEQA Statute CA Public Resources Code §§21000 et seq. Statute CA Public Resources Code §§21000 et seq. Guidelines 14 CCR §§15000 et seq. Guidelines 14 CCR §§15000 et seq.  Administrative Procedure Act (APA)  Peer Review Statute (Health and Safety Code §57004)  DFG Filing Fee Statute (Fish and Game Code §711.4)

29 PEER REVIEW REQUIREMENTS Health and Safety Code Section Applies to all Cal/EPA Organizations “Submit the scientific portions of the proposed rule, along with a statement of the scientific findings, conclusions, and assumptions on which the scientific portions of the proposed rule are based and the supporting scientific data, studies, and other appropriate materials, to the external scientific peer review entity for its evaluation.”

30 Requirements  Requirement The Scientific basis for all proposed rules must be submitted for external review The Scientific basis for all proposed rules must be submitted for external review  Cal/EPA Guidelines (WB guidelines) Expanded coverage Expanded coverage Significant “work products”Significant “work products” Implementation language of the science (e.g. BP language)Implementation language of the science (e.g. BP language) Adopted by Cal/EPA for all of its agencies Adopted by Cal/EPA for all of its agencies Managed by Gerald Bowes Managed by Gerald Bowes

31 Do all Proposed Rules or amendments with scientific components require scientific peer review?  No A new application of Peer Reviewed work product that does not significantly depart from its scientific approach A new application of Peer Reviewed work product that does not significantly depart from its scientific approach (e.g., standards developed by the U.S. EPA, which Cal/EPA adopts). However, Implementation of the standards will require peer review.(e.g., standards developed by the U.S. EPA, which Cal/EPA adopts). However, Implementation of the standards will require peer review. If uncertain, discuss this with Gerald Bowes who may discuss with our attorneys.If uncertain, discuss this with Gerald Bowes who may discuss with our attorneys.

32 State Water Board Role  Must approve all basin plan amendments before they can become effective  Reviews basin plan amendments to ensure consistency with statewide plans and policies, e.g. Sources of Drinking Water Policy, Toxics Policy, and applicable laws  In addition to Basin Plan approval, the State Water Board generally exerts influence over Regional Water Boards through petition process, statewide policies, program implementation, and budgetary control

33 State Water Board Role (Cont.)  After approving an amendment, the State Water Board shepherds the amendment through OAL and EPA, as necessary, for approval  State Board can adopt water quality control plans for any surface waters, e.g. the Ocean Plan or the former Tahoe Plan, which supersede any conflicting regional plans

34 What Decisions can State Board Make  §  When A RB amendment is submitted SB can Approve Approve Disapprove (“Remand”) in whole or in part Disapprove (“Remand”) in whole or in part Upon resubmission mayUpon resubmission may Approve Approve Or After holding a public hearing in the affected region may revise and approve. Or After holding a public hearing in the affected region may revise and approve. Give Direction to Region Give Direction to Region Give Direction to State Board Staff Give Direction to State Board Staff

35 Relevant State Law  Porter-Cologne Water Quality Control Act  Porter-Cologne Water Quality Control Act Water Code §§ – includes requirements for basin plan amendments covering all state waters, including ground water Water Code §§ – includes requirements for basin plan amendments covering all state waters, including ground water Water Code §13241 – specifies factors that the Water Boards must consider when adopting objectives, e.g. economic considerations (question as to application to other Board actions) Water Code §13241 – specifies factors that the Water Boards must consider when adopting objectives, e.g. economic considerations (question as to application to other Board actions) Water Code §13170 – authorizes State Water Board to adopt water quality control plans for surface waters Water Code §13170 – authorizes State Water Board to adopt water quality control plans for surface waters Water Code §§ – covers State Water Board adoption of state policy for water quality control, which is binding on Regional Water Boards, e.g. TMDL Listing Policy Water Code §§ – covers State Water Board adoption of state policy for water quality control, which is binding on Regional Water Boards, e.g. TMDL Listing Policy