City of Fort Collins REGULATORY CHANGES AFTER A NATURAL DISASTER Susan L. Duba Hayes, PE, CFM CASFM 2005.

Slides:



Advertisements
Similar presentations
Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Advertisements

Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
Hazard Mitigation Planning I Session Name: Hazard Mitigation Planning I Coastal Hazards Management Course Signed by the President on October 30, 2000 Amends.
The Event The Fort Collins flood was the biggest natural disaster to ever affect the city (in 130 years of record). Largest 24-hour rainfall ever to fall.
Oklahoma CRS Workgroup and CRS Program Update Oklahoma Floodplain Managers Association 2011 Annual Conference, Norman Oklahoma Jeff Bigby, PE, CFM Floodplain.
William Solecki City University of New York – Hunter College
The Risk is Real… Be PREPARED! Robert Billings, PE, PH, CFM Flood Mitigation Project Manager Charlotte-Mecklenburg Storm Water Services May 18, 2011 Briar.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Flood Risk Mapping Project Identifying the Risk Editorial Board Meeting [COMMUNITY NAME] Flood Risk Mapping Project.
Understanding Advisory Base Flood Elevations (ABFEs) Understanding Advisory Information and the Implications for Your Home December 2012.
Osceola County Floodplain Program
Flooding & Drainage Committee May 16,  Participate in the National Flood Insurance Program (NFIP)  Participate in the Community Rating System.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Unit 1 Community Capabilities
Higher Regulatory Standards Series 430. Higher Regulatory Standards 432 Elements Dougherty County (2007 Manual) – Total Points: 2740 – Activity 430.
FEMA Region VIII Reducing Losses through Higher Regulatory Standards 2013 Colorado Floods Case Study May 2015 HMTAP HSFEHQ-09-D-1129 / 14-J-0003.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
UPDATE February 8, DRAFT PRESENTATION OBJECTIVES 1.Quick Overview a.Definition of Study Area b.Joint Land Use Study (JLUS - Dept. of Commerce-May.
Back Creek Floodplain SEPTEMBER 2, Why are we here Introductions Almost 300 parcels affected by revised flood study of Back Creek Outline ◦History.
Central Valley Flood Protection Board August 9, 2013 Presented by: Michael Mierzwa California Department of Water Resources DWR’s Involvement in Flood.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Flood Map Modernization Flood Map Modernization Mapping the Risk Editorial Board Meeting October 2005 HILLSBOROUGH COUNTY FLOOD MAP MODERNIZATION V
Flood Map Modernization Flood Map Modernization Mapping the Risk Editorial Board Meeting [date] V [COMMUNITY NAME] FLOOD MAP MODERNIZATION.
Planning under the Growth Management Act
Community Development Department APPLICATION #2457 GRAND HAVEN PUD AMENDMENT APPLICATION #2411 GRAND HAVEN NORTH: SMALL SCALE FLUM AMENDMENT APPLICATION.
Jefferson County Agricultural Preservation and Land Use Plan Jefferson County’s Comprehensive Plan: Process and Strategies Presented to: Dane County Officials.
The July 28,1997 Fort Collins Flood: Putting the Stormwater System to the Test How Did it Serve to Minimize Societal Impact? Matt Kelsch Hydrometeorologist.
FEMA Terms (Last updated July 25, 2006) The Acronyms  NFIP – National Flood Insurance Program  FIRM – Flood Insurance Rate Map  SFHA – Special Flood.
Larimer County Floodplain Regulation Summary and History Board of County Commissioners Worksession January 12, 2015.
MS Dam Safety Program Dusty Myers, P.E. Chief, Dam Safety Division.
Board of County Commissioners October 14, 2008 Vinzant Landing Swallet Santa Fe River.
Permit Process & Application Guide
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
ITEM 6.a AT GREEN BUILDING ORDINANCE City Council – August 25, 2009.
City Council Workshop March 27, 2014 Debbie Vascik, CFM Cahoon Consulting.
Municipal Resilience Initiative NROC & GOMC awarded $285,000 through NOAA Climate Program Office in 2011 – Best practices & case studies (Roger Williams.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
STORMWATER MASTER PLAN TASK FORCE November 20, 2006.
Osceola County Floodplain Program Jennifer Nicholson, CFM Picture credit: Osceola Historical Society.
The National Flood Insurance Program's (NFIP's) Community Rating System (CRS) is a voluntary incentive program that recognizes communities for implementing.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
May 14, Planning Commission Planning Commission May 14, 2015.
2017 HAMPTON ROADS HAZARD MITIGATION PLAN UPDATE BRIEFING
What is TFMA? Organization of professionals with a wide range of experience and expertise. Our Purpose, Mission, and Goals: Facilitate sound floodplain.
FLOODPLAIN ADMINSTRATOR DAILY GRIND Roles, Process, Review
Flood Damage Prevention Code Update
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
2017 Zoning Update New Sewickley Township.
N. F. I. P. Provides federally subsidized flood insurance
WHY HAVE A FREEBOARD? THERE ARE MANY GOOD REASONS TO ENFORCE ADDITIONAL ELEVATION (MARGIN OF SAFETY)
Marina Del Palma Comprehensive Plan & Zoning Map Amendment
John Martin Reservoir Master Plan Revision
Palm Coast 145, LLC Comprehensive Plan Amendment & Rezoning City Council Public Hearing September 5, 2017.
Hudson Wetlands Protection Bylaw
Land Use and Zoning Committee Special Workshop
Water Quality Management & Planning Conference
Tulsa's Risk MAP Program Goals
Oklahoma CRS Workgroup and CRS Program Update
The Floodplain Management Challenge
Water Quality Protection Zones
2013 Floods: Mapping Hydrology and impacts in Larimer County, Colorado
Engineering Department
Aldine Westfield Stormwater Harris County Flood Control District
Urgency Ordinance Amending Butte County Code Chapter 53
One Company. Unlimited Potential.
Preparing for the Next Flood
Planning Partner Adoption Multi-Jurisdictional Hazard Mitigation Plan
Presentation transcript:

City of Fort Collins REGULATORY CHANGES AFTER A NATURAL DISASTER Susan L. Duba Hayes, PE, CFM CASFM 2005

The Fort Collins flood was the biggest natural disaster to ever affect the city (in 130 years of record). Largest 24-hour rainfall ever to fall on a Colorado urban area. (Total rainfall: 14.5” in 31 hours) $250m in total damage. Flow on Spring Creek exceeded the 500- year event. The Event

The Day After

120 Mobile Homes Destroyed

$4.5 million in Automobile Damage

2000 Homes and Businesses Suffered Damage

Ft. Collins Floodplain Facts: Before the Flood   Approximately 3,280 acres of floodplain and 1,828 structures located in the 100-year floodplain.   Four FEMA designated floodplains and three locally designated floodplains.   Regulated to a higher standard than FEMA.   Rated as a Class 6 by CRS.   Capital Project program to fund drainage projects. EXISTING HIGH CALIBER PROGRAM

WE WERE STILL CRITICIZED   Citizens asked: Why did you let us (or them) build there? Why didn’t you tell us we were at risk? Why didn’t the irrigation canals capture all the water? How could you let this happen to us? Why didn’t you plan for bigger storms? We’re in a “preferred storm track”. REGULATION CHANGES WERE DRIVEN BY CITIZENS

Regulatory Changes Two Major Initiatives 1. 1.Rainfall Higher 100-year rainfall adopted in 1999 (less than 2 years from flood) 2. 2.Floodplain Regulations Poudre River – adopted in 2000 (three years from flood) Remainder of City – adopted in 2005 (almost 8 years from the flood, 3 years of outreach!)

Rainfall   January 1998, Utilities began reevaluation of rainfall.   Task Force guided the study.   Could not wait until NOAA’s revised study to be completed in 3-5 years, (still not completed.)   City embarked on own study.

Variety of Opinions Regulatory agencies:  Federal Emergency Mgmt. Agency  Colorado Water Conservation Board  Larimer County  City of Fort Collins Utilities  Colorado State University Facilities  Fort Collins Water Board Technical Experts:  Colorado State University: Ÿ Atmospheric Science Department Ÿ Engineering Department Ÿ Statistics Department  Local Consultant Interested Citizens:  Planning and Zoning Board member  Citizen flooded in 1997

 Increased 100-year design storm by 27%.  Minority group within the Task Force still wanted higher rainfall.  Had regional effect: Wellington, Larimer County, Windsor.  Placed added responsibility on the City to update all floodplains except the Poudre River. FINAL RECOMMENDATION

 Poudre River was first. Discharge wouldn’t change because of new rainfall values Perceived as greatest flood threat to the community Potential for “lost opportunities” Strong push by environmentalists to reevaluate regulations Floodplain Regulation Revisions: Round One

Task Force Members   City Advisory Boards   Business Interests   Environmental and Recreation Interests   Technical Experts   Real Estate Interests   Floodplain Property Owner   Emergency Response

Complex Issues 1. 1.Floodway Width 2. 2.Floodway Modification 3. 3.Flood Protection Projects 4. 4.Property Purchase 5. 5.Notification 6. 6.Fill 7. 7.Removal from Floodplain 8. 8.New Development 9. 9.Mobile Home Parks Residential/ Commercial Development Remodels Additions Redevelopment Critical Facilities Riparian Areas Dry Land Access Floatable Materials Variances Lowest Floor Elevation DIFFICULT TO CONVEY COMPLEX TECHNICAL ISSUES TO LAY PEOPLE

Result: More Restrictive Regulations   Product Corridor ( 500 year Depth x Velocity > 6)   One-tenth foot floodway   Higher Freeboard – 2 feet   More restrictions on uses in floodway and Product Corridor   Dryland access required   Floatable materials restricted

Floodplain Regulations: Round 2   Started in 2002, after new floodplains mapped.   Now had 3600 acres of floodplain with 3300 structures at risk.   No Task Force.   Recommended changes generated by City staff.

Staff’s Approach to Floodplain Regulations   Balance risk with regulation Map a floodway where practical More restrictive regulations in the floodway area, less restrictive in the flood fringe More restrictive for new development, less restrictive for existing development   More restrictive for residential, less restrictive for nonresidential

Result: Some Regulations Are More Restrictive   More Restrictive No new residential in floodway. No new mobile home parks in floodplain. Non-residential: no new basements in floodway.

Result: Most Changes Less Restrictive   Less Restrictive Changed No-Rise floodplains to FW/FF. Reduced freeboard to 6” for remodel/additions to existing structures. Critical facilities allowed in 100-year Moderate Risk. General Manager can waive regulations in city floodplains if a capital project is underway. Substantial Improvement: No longer cumulative over lifetime of structure, tracked for 1 year. Improvements above flood level not counted (less than FEMA minimum): city floodplains only.

Impact on Community Rating System Classification   Currently a Class 4 (scale of 1 to 10 with 1 the best).   30% discount on flood insurance.   New regulations will move Fort Collins to Class 5 because of pre-requisite requirements.   25% discount on flood insurance.

Conclusions  Process takes a long time.  Take advantage of community’s awareness to effect change.  Excellent opportunity to verify with community the validity of regulations.  Excellent opportunity to modify code for easier use.

Floodplain Statistics Floodway Flood Fringe Moderate Risk Area (acres) 1,9001, Number of Structures 7001,700900