Lin/Operations/Managing Services1 Capacity Management in Services Module u Queuing processes and performance measures u Why do queues build up? u Performance.

Slides:



Advertisements
Similar presentations
Make to Stock (MTS) vs. Make to Order (MTO)
Advertisements

Capacity Planning and Queuing Models
Flow Rate and Capacity Analysis
Operations Management
OPSM 301: Operations Management Session 12: Service processes and flow variability Koç University Graduate School of Business MBA Program Zeynep Aksin.
ArrivalsServiceWaiting line Exit Processing order System Queuing Systems: basic elements.
Capacity Setting and Queuing Theory
S. D. Deshmukh OM V. Capacity Planning in Services u Matching Supply and Demand u The Service Process u Performance Measures u Causes of Waiting u Economics.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Capacity Planning and Queuing Models.
S. Chopra/Operations/Managing Services1 Operations Management: Capacity Management in Services Module u Why do queues build up? u Process attributes and.
1 Term Project – Call Center Operations SOM 686, Fall 2006 Darren Mitchell Hayden Gilbert Serge Suprun.
OPSM 405 Service Management Class 19: Managing waiting time: Queuing Theory Koç University Zeynep Aksin
OM&PM/Class 7a1 Operations Management & Performance Modeling 1Operations Strategy 2Process Analysis 3Lean Operations 4Supply Chain Management 5Capacity.
1 Ardavan Asef-Vaziri Sep-09Operations Management: Waiting Lines2  Made-to-stock (MTS) operations  Product is manufactured and stocked in advance of.
Process Analysis and Applications Module
Management of Waiting Lines
Polling: Lower Waiting Time, Longer Processing Time (Perhaps)
14-1. Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 14 Capacity Planning and Queuing Models.
Waiting lines problems
OM&PM/Class 6b1 1Operations Strategy 2Process Analysis 3Lean Operations 4Supply Chain Management 5Capacity Management in Services –Class 6b: Capacity Analysis.
Chapter 18 Management of Waiting Lines
Problem 8.4 K = ∞ R i = 60/4 = 15 /hr T p = 3 min = 0.05 hour c= 1 R p = c/Tp = 20 /hour Both Ti and Tp exponential Server $20 /hr Phone $5/hr Wait cost.
Capacity Management in Services Module
1 Ardavan Asef-Vaziri Sep-09Operations Management: Waiting Lines3  Terminology: The characteristics of a queuing system is captured by five parameters:
Call Center Terminologies
OPERATIONS MANAGEMENT OPRE 6260 Raymond Lutz. Products, Processes, and Performance - Chapter 1 Learning Objectives An operation as a transformation process.
Buffer or Suffer Principle
OPSM 301: Operations Management
Spreadsheet Modeling & Decision Analysis
OPSM 501: Operations Management Week 6: The Goal Koç University Graduate School of Business MBA Program Zeynep Aksin
1 Chapter 5 Flow Lines Types Issues in Design and Operation Models of Asynchronous Lines –Infinite or Finite Buffers Models of Synchronous (Indexing) Lines.
Management of Waiting Lines McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Announcement-exam rules
Make to stock vs. Make to Order
18 Management of Waiting Lines.
Chapter 16 Capacity Planning and Queuing Models
OPSM 405 Service Operations Management
Contents Introduction Aggregate planning problem
Slide 1 Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted.
Chapter 6 Managing Capacity
Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted by Gerard.
Trauma center moves to diversion status once all servers are busy (incoming patients are directed to other locations) Figure 7.1.: Process flow diagram.
Basic Queuing Insights Nico M. van Dijk “Why queuing never vanishes” European Journal of Operational Research 99 (1997)
Example 14.3 Queuing | 14.2 | 14.4 | 14.5 | 14.6 | 14.7 |14.8 | Background Information n County Bank has several.
OPSM 301: Operations Management Session 13-14: Queue management Koç University Graduate School of Business MBA Program Zeynep Aksin
Management of Waiting Lines Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
1 Safety Capacity Capacity Planning in Services Industry  Matching Supply and Demand in Service Processes  Performance Measures  Causes of Waiting 
Managerial Decision Making Chapter 13 Queuing Models.
Module D Waiting Line Models.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 18 Management of Waiting Lines.
WAITING LINES AND SIMULATION
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Managing Flow Variability: Safety Capacity
Synchronous Manufacturing and Theory of Constraints
The Role of Costs in Pricing Decisions
Constraint Management
Management of Waiting Lines
Effect of Buffer Capacity
Management of Waiting Lines
Delays Deterministic Stochastic Assumes “error free” type case
Accounts Receivable and Inventory Management
Most Basic Principle Guiding Your Decisions-- will it: Increase Demand for Product Decrease Cost of Making & Marketing Product.
Queuing Theory By: Brian Murphy.
Queuing Models and Capacity Planning
Delays Deterministic Stochastic Assumes “error free” type case
Assignment Capacity The recorded solution to the first problem is available at
Waiting Line Models Waiting takes place in virtually every productive process or service. Since the time spent by people and things waiting in line is.
Effect of Buffer Capacity
Theory of Constraint.
Synchronous Manufacturing and Theory of Constraints
Presentation transcript:

Lin/Operations/Managing Services1 Capacity Management in Services Module u Queuing processes and performance measures u Why do queues build up? u Performance improvement –Limited buffer –Pooling of capacity –Specialization versus flexibility –Optimal staff level u Managing Customer Service »The BAT Case

Lin/Operations/Managing Services2 Telemarketing at L.L.Bean u During some half hours, 80% of calls dialed received a busy signal. u Customers getting through had to wait on average 10 minutes for an available agent. Extra telephone expense per day for waiting was $25,000. u For calls abandoned because of long delays, L.L.Bean still paid for the queue time connect charges. u In 1988, L.L.Bean conservatively estimated that it lost $10 million of profit because of sub-optimal allocation of telemarketing resources.

Lin/Operations/Managing Services3 What determines Service Quality?

Lin/Operations/Managing Services4 Queuing Systems to model Service Processes: A Simple Process Sales Reps processing calls Incoming calls Calls on Hold Answered Calls MBPF Inc. Call Center Blocked Calls (Busy signal) Abandoned Calls (Tired of waiting) Order Queue “buffer” size K

Lin/Operations/Managing Services5 Performance Measures u Revenue Related –Throughput R –Abandonment R a –Probability of blocking R b u Cost Related –Server utilization  –Inventory/WIP : # in queue I i /system I u Customer Service related –Waiting/Flow Time: time spent in queue T i /system T

Lin/Operations/Managing Services6 Why do queues form?  variability: –arrival times –service times –processor availability u utilization: –Impact of variability increases as utilization increases! (throughput  or capacity  )

Lin/Operations/Managing Services7 Queuing Theory: Variability + Utilization = Waiting u PK Formula for average wait in queue: mean service time utilization effect x variability effect x Variability Theoretical Flow Time Actual Average Flow Time,T Utilization  100% TpTp u Throughput-Delay curve:

Lin/Operations/Managing Services8 Levers to reduce waiting and increase QoS:  variability reduction + safety capacity u How reduce system variability? u Safety Capacity = capacity carried in excess of expected demand to cover for system variability –it provides a safety net against higher than expected arrivals or services and reduces waiting time

Lin/Operations/Managing Services9 Example: MBPF Calling Center one server, unlimited buffer u Consider MBPF Inc. that has a customer service representative (CSR) taking calls. When the CSR is busy, the caller is put on hold. The calls are taken in the order received. u Assume that calls arrive exponentially at the rate of one every 3 minutes. The CSR takes on average 2.5 minutes to complete the reservation. The time for service is also assumed to be exponentially distributed. u The CSR is paid $20 per hour. It has been estimated that each minute that a customer spends in queue costs MBPF $2 due to customer dissatisfaction and loss of future business. –MBPF’s waiting cost =

Lin/Operations/Managing Services10 Limited Buffer Size u In reality only a limited number of people can be put on hold (this depends on the phone system in place) after which a caller receives busy signal. Assume that at most 5 people can be put on hold. Any caller receiving a busy signal simply calls a competitor resulting in a loss of $100 in revenue. –# of servers c = –buffer size K = u What is the hourly loss because of callers not being able to get through?

Lin/Operations/Managing Services11 Resource Pooling u 2 phone numbers –MBPF hires a second CSR who is assigned a new telephone number. Customers are now free to call either of the two numbers. Once they are put on hold customers tend to stay on line since the other may be worse.. u 1 phone number: pooling –both CSRs share the same telephone number and the customers on hold are in a single queue Servers Queue ServerQueue ServerQueue 50%

Lin/Operations/Managing Services12 Specialization Vs. Flexibility u Specialization –Service divided into two segments (one server at each segment), each averaging 5 minutes u Flexibility –Second server added, with each server performing entire service Servers Queue ServerQueueServerQueue

Lin/Operations/Managing Services13 Staffing Decision u Assume that the MBPF call center has a total of 6 lines. With all other data as in Example 2, what is the optimal number of CSRs that MBPF should staff the call center with?

Lin/Operations/Managing Services14 Determining the Optimal Staff Level

Lin/Operations/Managing Services15 The BAT Case

Lin/Operations/Managing Services16 Levers for Reducing Flow Time u “is to decrease the work content of (only ?) critical activities”, u and/or move it to non critical activities. u Reduce waiting time: –reduce variability »arrivals & service requests »synchronize flows within the process –increase safety capacity »lower utilization »Pooling –Match resource availability with flows in and out of process

Lin/Operations/Managing Services17 Framework for Process Flow Management Competitive? No Flow Chart Process Identify Bottlenecks Maximal Flow Rate Identify Critical Path Minimal Flow Time Demand Pattern Macro Average Performance Process Re-Design Competitive? No Micro Variability Performance Demand & Supply Mgt +Process redesign Continuous Improvement mean variability Yes

Lin/Operations/Managing Services18 Learning objectives: General Service Process Management u Queues build up due to variability. u Reducing variability improves performance. u If service cannot be provided from stock, safety capacity must be provided to cover for variability. –Tradeoff is between cost of waiting, lost sales, and cost of capacity. u Improving Performance –Reduce variability –Increase safety capacity »Pooling servers/capacity –Increase synchronization between demand (arrivals) and service »Manage demand »Synchronize supply: resource availability