Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
EPSON STAMPING ISO REV 1 2/10/2000.
The ISO 9002 Quality Assurance Management System
ISO 9001 Interpretation : Exclusions
Systems Engineering Management
Release & Deployment ITIL Version 3
ISO/IEC A review of the new standard for laboratory accreditation
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
Introduction to Software Quality Assurance (SQA)
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
From Research Prototype to Production
Visit us at E mail: Tele:
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Managing Accelerator Quality Matthew Conlon 13 April 2015.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
Develop Project Charter
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
CDR for the ESS Linac Magnets for LWUs (pulsed quadrupoles and DC correctors) Closeout May 4, 2016 J.G. Weisend II, Chairman CDR.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
Project Management PTM721S
WP High Beta Cavities Delivery
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
ITIL: Service Transition
Supportability Design Considerations
12.3 Control Procurements The process of managing procurement relationships, monitoring contract performance and making changes or corrections as needed.
Software Configuration Management
Project Management Processes
Software Planning Guidelines
External Validation of Quality Programs
NEEDS & EXPECTATIONS: INTERESTED PARTIES TO ISO & AS9100
Development Projects / Analysis Projects / On-site Service Projects
UNIT V QUALITY SYSTEMS.
Release Management Release Management.
Software and System Delivery
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Acc. Collaboration board
Outcome TFCS-11// February Washington DC
Quality Management Systems – Requirements
HIGHLIGHTING THE KEY CHANGES
Engineering Processes
Guidance notes for Project Manager
Product Development Scenario Overview
Transition ISO 9001:2008 to ISO 9001:2015
Lockheed Martin Canada’s SMB Mentoring Program
CIS12-3 IT Project Management
Project Management Process Groups
ISO 9000 Dr. S. Thomas Foster, Jr..
Project Management Processes
HART Technologies Process Overview
Engineering Processes
External Validation of Quality Programs
Receiving Inspection on incoming goods
PSS verification and validation
ISO 9001:2000 Management System Overview
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson ESS Accelerator Collaboration Board Meeting Trieste
ISO 9001 – 2008 Changes Summary of Changes
DOE Review of the LCLS Project October 2006
Acc. Collaboration board
High Level Readiness Reviews
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
Executive Project Kickoff
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
ESS-CEA ESSI Coordination Committee
Presentation transcript:

Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning Workshops CEA Saclay, 30 June – 01 July 2016

Quality at ESS ESS Quality Organisation (Q Div) & ESS Management System (ESS MS) 2

ESS Q Div and Project QA/QC 3

ESS Management System 4 PROCEDURES RULES, GUIDELINES, TEMPLATES, ETC. RULES, GUIDELINES, TEMPLATES, ETC. POLICIES PROCESSES ESS Management System is a resource to use

Collaborating for Quality 5

Contracts Technical Reviews Quality Plans …means that the Stakeholders, ESS and its Partners, engage and work together to deliver high quality products, the most important of which are the equipment systems and components of the ESS operational facility. We engage through: Contracting Quality Planning Technical Review Collaboration for Quality 6 assuring and controlling QUALITY in Work and Products

Contracting for Quality Types of contracts: ESS procurement Supply Agreements and their SoW, specs, etc. IKC Agreements and their ‘Schedules’ a.k.a Technical Annexes (TA), other collaboration agreements Quality activities in making contracts: consultation during the development of contracts assures value and integrity of the SoW and related docs: – Ts & Cs, technical requirements, specifications, reference design – ESS MS documents including ESS processes and templates conducting internal Quality review with Accelerator’s Internal stakeholders: – WP teams, planners, Safety and specialty engineers 7

Planning for Quality Developing and agreeing the Project Quality Plan (PQP) … a graded approach, tailored for the scope and for the needs and capabilities of ESS, Partners and their sub- partners. … made through discussions, visits and other collaborative activities: … delivered via a succession of drafts in the data packages for Technical Reviews 8

Quality through Technical Reviews Technical Reviews facilitate: hands-on collaboration between ESS and partners risk identification and sharing governance of the contracted SoW and its stages configuration management through baselines product Acceptance - transfer of ownership Technical Reviews progress through the stages of: Design ‘Realization’ – procurement, manufacture, pre-and post- delivery verification including inspections and testing Installation, Commissioning and Initial Operations 9

Types of Technical Reviews Design Reviews, for example PDR CDR Readiness Reviews, for example Production RR Integration or Assembly RR TRR Accelerator RR ORR System Acceptance Reviews: SAR 10

Project Quality Plan 11

Purpose of a Project Quality Plan 12 PQP Partner ESS PQP serves as a link and covenant between Partner and ESS PQP is an agreed plan addressing activities necessary to secure high quality work, and to secure high quality deliverables - especially the components and systems products PQP is developed, negotiated and approved jointly by both Parties before series realisation starts QUALITY in Work and Products

ESS - ISO Template ESS has developed a PQP template for guiding ESS and partners for QA and QC. 13 based on ISO 10005: “Quality management systems (ISO 9001) - guideline for Quality plans” all headings should be addressed / referenced Partners with certified management systems may use their own templates and formats ESS PQP

Contents Scope Quality Goals Management responsibilities Documentation and storage Control of records Resources Requirements Customer communication Design and development process Purchasing Production and service provisions Customer property Preservation of product Control of Non-conforming product Identification and traceability Monitoring and measurements Audits Implementation of the PQP 14 Scope Describe the purpose of the PQP, identify what products and define ‘quality’ applicable for them, and how Quality in general to be achieved through Quality planning in this project i.e. introduce the Quality Goals. Describe the specific aspects of this particular Project and any limitations or delimitations, certain conditions that affects the validity of the PQP – what organisations and what products does it apply for, which stages of work or timeframe Documentation and storage Describe how the PQP, its supporting references (Partner’s QMS), and especially the document deliverables of the Project: are identified/named; the responsibilities/identities for authors, reviewers and approvers; and are distributed, stored and maintained. Non-Conforming products Describe how non-conforming products, primarily in the realised components and system deliverables of the Project, are identified, and how their non-conformance is tracked, communicated, and resolved. PQP Content

Contracts Technical Reviews Quality Plans Collaborating for Quality & the PQP questions? actions? 15 assuring and controlling QUALITY in Work and Products

BACK-UP Slides Contracting for Quality - IKC Agreements IKCA Schedules also known as Technical Annexes: Chapter 1. SCOPE summary Chapter 2. RELATED DOCUMENTS for the Schedule: – 2.1 contractually Applicable documents: requirements, specs., reference design etc. – 2.2 Reference documents for guidance Chapter 3. TERMS AND DEFINITIONS 16

BACK-UP Slides Contracting for Quality - IKC Agreements Chapter 4. PROJECT DEFINITION i.e. defining the work to be done and the deliverables – 4.1 Deliverable Item Definition: an executive summary of deliverables, time schedule and value of work – 4.2 defining the work Stages in executing the scope: Design: activities, review and other milestones, tech. data packages Realization and Verification i.e. procurement, manufacture, pre-and post-delivery verification including test. support for Installation, Commissioning and Initial Operations – 4.3 defining the Project time Schedule and Key Milestones – 4.4 defining the Deliverables 17

BACK-UP Slides Contracting for Quality - IKC Agreements Chapter 5. TASKS APPLICABLE TO ALL PROJECT STAGES – 5.1 Project Management and Control – 5.2 Risk Management – 5.3 Configuration Management – 5.4 Project & Quality Assurance and Safety Chapter 6. DOCUMENTATION FORMAT Chapter 7. TRANSPORTATION AND DELIVERY Chapter 8. WARRANTY Chapter 9. EXCLUDED BACKGROUND 18

BACK-UP Slides Types of Technical Reviews - explanations Design Reviews, for example PDR: a review of Preliminary (i.e. conceptual, pre-prototype) Design CDR: a review in detail of the complete or near finalized detailed design data and documentation of the components or systems. – includes reviewing results, decisions from any analysis, prototyping testing. – ‘Critical’ because it is a risk-reducing ‘toll-gate’ review, for proceeding to component and system procurement and manufacture – May also be held for agreement high-value, long-lead time procurement Readiness Reviews, for example TRR: Test Readiness Review – confirms a component’s or assembled system’s ‘as-built’ status, and – confirms planning and that all is ready for verification ORR: Operational Readiness Review. post-commissioning. (Component, ) System Acceptance Reviews: confirm results of FAT, SAT and other verification activities. Includes check of QC inspections and tests the mechanism for ESS to accept products – enacts the transfer of ownership 19