The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Joachim Schultes University of Wuppertal FIT Wiener DCS Training Session 2.1.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
SCADA Systems - What is the scope of this talk? What are SCADA systems? What are their structure and main features? How open are they? How are they evolving?
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Controls for High-Availability Magnet PS’s for ATF2 Glen White SLAC September
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Peter Chochula ALICE DCS Workshop, October 6,2005 DCS Computing policies and rules.
Status of Maraton problem Niko Neufeld Calo Commissioning meeting
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
19/05/10FV 1 HyTec crate – DCS integration issues.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
UF/PNPI POWER SUPPLY SOFTWARE By Magnus Hov Lieng
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
Serial / Ethernet Converter - IE-CS-2TX-XRS232/485
CERN Summerschool 2007 Monitor and Control of the CANbus power supplies of ATLAS’ MDTs Wilco Koppert (UU)
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
PVSS an industrial tool for slow control
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Institute of Nuclear Physics Polish Academy of Sciences
ATLAS MDT HV – LV Detector Control System (DCS)
Common components for OPC-UA developments at CERN: An enhanced OPC-UA toolkit Ben Farnham.
by Prasad Mane (05IT6012) School of Information Technology
Radiation- and Magnet field- Tolerant Power Supply System
The LHCb Run Control System
TPC Detector Control System
Experiment Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter

Michela LenziApr 6, 2006ECS Meeting The Maraton System Modular system made of three parts, the AC-DC converter, the control board (for monitoring and control of the LVPS) and the DC- DC modular power supply. Ethernet based - Remote controller unit separate from the power supply LV power supply Control and monitor board (RCM) AC-DC converter

Michela LenziApr 6, 2006ECS Meeting Status of Wiener OPC server  The Wiener OPC server is almost ready but not available before the hardware arrival (OPC server license included in the RCM order)  Sometimes there are wrong actual device readings for a handful of parameters (not critical)  “IT-CO provisionally approves the use of the Wiener Maraton OPC with the RCM / Maraton Crate combination – final approval being reserved until Wiener releases the complete OPC server” The OPC™ (OLE for Process Control) is a set of interfaces, based on OLE/COM and DCOM technology. The basic principle of OPC operation is that an OPC client (e.g. a SCADA) transfers data to/from PLCs/Devices by means of an OPC server. The OPC client can operate either locally (server on same PC) or via network, and the server accesses PLCs/Devices via drivers (e.g. drivers to fieldbuses and Ethernet based products).

Michela LenziApr 6, 2006ECS Meeting Main Maraton OPC items RCM:  Status (read): on/off  Settings (read/write): On/Off crate, On/Off groups CHANNELS:  Status (read): on/off, Failure Max temperature/current/ sense voltage/terminal voltage  Monitor (read): current, sense voltage, temperature  Settings & ReadBack (read/write): On/Off channel, Max current, max sense voltage, group number, Failure behaviour: ignore, switch off channel, group, crate

Michela LenziApr 6, 2006ECS Meeting Status of Maraton in JCOP The Maraton device has been integrated in the last version (2.3.6) of the JCOP framework: Device data structure OPC addresses Alarm definitions A set of common tools and libraries are provided to implement the Maraton specific control software  Facilities are available to set: “The JCOP framework is an integrated set of guidelines and software tools that include templates, standard elements and functions required to achieve a homogeneous Control System”

Michela LenziApr 6, 2006ECS Meeting Status of LV in ECS  I have implemented the first prototype of the control program for LV written in PVSS and integrated in the JCOP framework  Since the hardware and the OPC server are not yet available I have developed a Marathon simulator to test and debug the program  The program has been successfully tested at the SCADA lab. at CERN using the real OPC server connected to the real Marathon remote controller unit  Comment, suggestions,user requirements are welcome!

Michela LenziApr 6, 2006ECS Meeting program functionality  Create, copy, delete Marathon crate to control & monitor  Monitor crate and channels status (On/Off, Failure)  Monitor channel current, voltage and temperature  Setting parameters for each channel, group or crate  Switch on/off channels/groups/crate in a chosen sequence

Michela LenziApr 6, 2006ECS Meeting RCM Monitor Setup settings for all RCM On/Off crate in defined sequence Acknowledge error gone Click on table  next slide

Michela LenziApr 6, 2006ECS Meeting Channels Monitor Groups on/off in defined sequence Next slide Global RCM status

Michela LenziApr 6, 2006ECS Meeting Channel setup Setting channels/groups Click on table

Michela LenziApr 6, 2006ECS Meeting Conclusions  The OPC server is almost ready  A first prototype for ECS program is ready  The ECS program has been tested during developing with the JCOP driver simulator + a Maraton simulator I specifically implemented for this purpose  The ECS program has then been successfully tested with real OPC server and Maraton RCM (but no power supply!) in SCADA lab. at CERN (showing also that the simulator is reliable to test further developments )  I am waiting for the hardware to perform more accurate tests  Comments, suggestions and requirements on the functionalities needed for the commissioning are welcome!