Welcome to the 13 th Annual TSA Conference, 2016.

Slides:



Advertisements
Similar presentations
P roblem S olving I nnovator Solving Tomorrows Problems Today IS - IS NOT / COMPARITIVE ANALYSIS motivates deliberate thinking about the Boundaries of.
Advertisements

Goodman and Amana Furnace Orientation.
HEAT PUMPS.
Condensate Trap Heater KGAHT0201KIT 2013 Fall Zone Meeting Gary Georgette/Jerry Shipman UTC Climate, Controls & Security Confidential and Proprietary Information.
HVAC Commercial Ref.
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
Chapter 10 Control Loop Troubleshooting. Overall Course Objectives Develop the skills necessary to function as an industrial process control engineer.
7.3.2 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Components and Operating Characteristics of Electronic Ignition.
Gas Furnace Controls Part 4.
S8910U1000 Universal Electronic Ignition Modules Training Module
Engineer Presentation
Blue is better 1 Eng. Marco Caldara Frascold R&D laboratory manager COMPRESSOR TECNOLOGY FOR THE LOW GWP REFRIGERANTS London - 26° April 2012 RAC question.
Enhancing Reliability through HALT.  Introduction to HALT  Benefits of HALT  The HALT process.
Copyright © 2014 reliability solutions all rights reserved Reliability Solutions Seminar Managing and Improving Reliability 2014 Agenda Martin Shaw – Reliability.
The Airtex Educational Partnership (AEP) was started several years ago by Airtex Automotive Division as a way to merge corporate automotive expertise with.
E2 Motors and Motor Starting
Pressure Switches. New modulating and multi-stage furnaces are more complex and require that installation instructions and procedures be followed so that.
Single Phase IEC and EATS Distribution Transformers
1 HVAC214 – Electrical for Oil Fan Centers. 2 Designed to provide low voltage control of blower motors and auxiliary circuits. Provide a good junction.
1 HVAC 214 Electricity For Oil Heat Fan Center Relays.
Gas Furnace Planned Maintenance
Overview of the 1.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
7.4.1 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Operating Characteristics of Circuit Control Devices, Electromagnetic.
Burners TRAining CEntre. RESIDENTIAL GAS BURNERS R D B R D B series GOALS: KEEP STRONG OUR POSITION ON RESIDENTIAL GAS BURNERS DEDICATED TO OEM’s MARKET.
7.3.5 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Function and Characteristics of Draft Fans & Controls High efficiency.
Dave Koesterer Dir. of Eng. Performance Systems Furnace Updates.
David Garvin Product Manager EarthDirEX Geothermal Copyright © 2015 Nortek Inc. All rights reserved.
I am a Design and Development Engineering Professional with a proven record at several top companies. I have revenue enhancing, product line extension.
Copyright © 2014 reliability solutions all rights reserved Reliability Solutions Seminar Managing and Improving Reliability 2015 Agenda Martin Shaw – Reliability.
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
Why Maintenance Tasks are Important Produced by Joe Marchese.
Troubleshooting Equipment Containing Integrated Circuits Jimmie Fouts Houston County Career Academy.
Automotive Heating and Air Conditioning CHAPTER Automotive Heating and Air Conditioning, 7e James D. Halderman | Tom Birch SEVENTH EDITION Copyright ©
Student Handout Packet – Page A7
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Failure Modes and Effects Analysis (FMEA)
REDA Production Systems
E3 HVACR Controls and Devices
Automotive Heating And Air Conditioning
Unit 13 Oil-Burning Equipment
Unit 7 Gas Heat: Natural and LP
delivered with the compressor
14 Refrigerant Recovery, Recycling, and Recharging.
EMB 145 Oral Questions Overhead “B”
2012 Technical Service Advisor’s Meeting
E3 HVACR Controls and Devices
Different Types of Relays.
INDUCTION MOTOR PROTECTION FOR SINGLE PHASING, OVERVOLTAGE AND OVER TEMPERATURE Submitted by:
Martin Shaw – Reliability Solutions
FIGURE 33-1 A typical fuel tank installation.
LIGHT COMMERCIAL 2014 TSA Meeting
T-6B On-Board Oxygen Generation System (OBOGS)
A-90 Pressure Switches 2013 TSA Meeting
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
Impacts and Actions Resulting from the August 14, 2003 Blackout
CONTROL BOX RMG
Martin Shaw – Reliability Solutions
Managing and Improving Reliability across the Entire Life Cycle
Incandescent Lighting
Goodman and Amana Furnace Orientation.
S8910U1000 Universal Electronic Ignition Modules Training Module
ST9120U1003 Universal Electronic Fan Timer Training Module
Automotive Technology Principles, Diagnosis, and Service
T-6B On-Board Oxygen Generation System (OBOGS)
Presentation transcript:

Welcome to the 13 th Annual TSA Conference, 2016

Dave Koesterer Dir. of Engineering Performance Systems Furnace Updates

MPL Series 9371MPL 9375 Series M1 Series Pressure Switch

Field Issue – “Chattering” Gas Valve Field Issue – “Chattering” Gas Valve Requested switches and furnaces returned under SR program Requested switches and furnaces returned under SR program Investigated Root Cause Investigated Root Cause – Issue confirmed Field Issue sequence of events Field Issue sequence of events – Successful ignition – Momentary loss of vacuum – Pressure switch opening – Voltage drops to gas valve – Gas valve begins to close – Vacuum regained – pressure switch closes M1 Series Pressure Switch

Sequence cont’d… Sequence cont’d… – Cycle repeats up 1 to 4 times The Issue… The Issue… – New switch series has less internal volume – Quicker response time The Solution… The Solution… – Dampen or slow down the switch response time M1 Series Pressure Switch

Action Taken Action Taken – Developed smaller bleed orifice – Requires new tooling for orifice Application Testing Application Testing – All M1 models – Normal and reduced voltage – Input: Normal, reduced and over-fire – Fuel: Natural gas and LP – Cold and Hot start-up M1 Series Pressure Switch

New Switch Target Implementation New Switch Target Implementation – Early October, 2016 New Switch Part Number New Switch Part Number – R New Kit Part Number New Kit Part Number – R – Includes switch and tubing M1 Series Pressure Switch

M7 Series Igniter M7RL and M7TL Series M7RL and M7TL Series – Single and Two-Stage Requested failed igniters from the field Requested failed igniters from the field Component Failure Analysis Component Failure Analysis – Micro-Fractures in Ceramic coating – Delamination (blistering) Potential Root Causes Potential Root Causes – Mechanical stress in handling – Mechanical stress in transit – Thermal stress – Defects in manufacturing

M7 Series Igniter Reliability Testing Reliability Testing – Developed accelerated life test – Forced failures to predict igniter life – Confirmed Voltage vs Temperature Curves – Target 100,000 cycle life Ignition Test Conditions Ignition Test Conditions – Voltage: 81V, 115V, and 127V – Cold and Hot start – Natural gas and LP – Pressure: Reduced, Normal, Increased and min. rate

M7 Series Igniter New Supplier Selected New Supplier Selected – Silicon Nitride – CSA Approved Design New Igniter Part Number New Igniter Part Number – TBD – Backward compatible Target Launch November, 2016 Target Launch November, 2016

90+ Front Collector Box Seal Models Affected: G7 and M7 Series Models Affected: G7 and M7 Series Field Issue: Condensate leaking from front collector box Field Issue: Condensate leaking from front collector box Requested Furnaces from the field under SR program Requested Furnaces from the field under SR program Sampled warehouse inventory Sampled warehouse inventory Root Cause Investigation Root Cause Investigation – Improper application of “grey” sealant tape

90 + Front Collector Box Seal Solution Solution – Pre-cut tape length for each cabinet size – Update work instructions – Emphasize ½” joint overlap – Conduct new process training session for employees

90 + Front Collector Box Seal Date Range affected Date Range affected – Starting July 1, 2015 Solution Implemented November 4, 2015 Solution Implemented November 4, 2015

G7 1 HP PSC Motor Set screw on 1 HP PSC motor assemblies loosening Set screw on 1 HP PSC motor assemblies loosening – Motor PN – Caused by fretting induced by motor/wheel vibration – Motors repositioned in motor mount – Effective date 3/20/15

G7 1 HP PSC Motor New Motor created to further reduce torque pulsations New Motor created to further reduce torque pulsations – Part number R – Implemented on 8/23/16 for all G7 applications New Replacement Blower/Motor Assembly New Replacement Blower/Motor Assembly – Part number

Customer issue: Secondary twinned furnace cycling on and off Customer issue: Secondary twinned furnace cycling on and off – No faults recorded on the ignition controls Jobsite visit to observe (4) pairs of twinned furnaces Jobsite visit to observe (4) pairs of twinned furnaces Set Up Set Up – All wiring according to kit instructions – Primary Furnace connected to thermostat with >100’ wire Findings Findings – On a call for HEAT, Twinning Boards communicating – Primary furnace normal operation – Secondary furnace cycling – No faults observed on secondary furnace G7 PSC Twinning Kit

Findings cont’d… Findings cont’d… – Ignition control exhibiting loss of pressure switch signal behavior Controls Engineer monitored ignition board function Controls Engineer monitored ignition board function – DC waveform to ignition board microprocessor monitored – When gas valve was energized, DC power dropped and a “false” open pressure switch signal caused the gas valve to close 75 VA transformer tried with marginal success 75 VA transformer tried with marginal success – Voltage drop still present Solution: Control Secondary furnace with separate relay Solution: Control Secondary furnace with separate relay – Control power for secondary furnace is from its 40VA transformer G7 PSC Twinning Kit

Wiring Diagram with new Isolation Relay Wiring Diagram with new Isolation Relay G7 Twinning Kit

Technical Bulletin to be issued Technical Bulletin to be issued “OLD” Kit “OLD” Kit “New” Kit “New” Kit G7 PSC Twinning Kit

Nortek Global HVAC is a subsidiary of Nortek Inc. © 2016 Nortek Inc., All Rights Reserved.