Charge breeding at REX-ISOLDE HIE-EBIS workshop 16-17/10 2012 Fredrik Wenander CERN.

Slides:



Advertisements
Similar presentations
ISOLDE WS 2007 Results with ISCOOL a new Radio Frequency Quadrupole Cooler and Buncher at ISOLDE P. Delahaye, H. Frånberg, AB-OP-PSB, ISCOOL, COLLAPS,
Advertisements

D. Leitner, D. Alt, T. M.Baumann, C. Benatti, B. Durickovich, K. Kittimanapun, A. Lapierre, L. Ling-Ying, S. Krause, F. Montes, D. Morrissey, S. Nash,
ISIS Accelerator Division
Then mid no beam accelerated yet Now 2009 The refinement of REX-ISOLDE F. Wenander 8 June 2009 Meanwhile * 9-gap cavity added * new experimental.
JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
Status of EURISOL Yorick BLUMENFELD We acknowledge the financial support of the European Community under the FP6 “Research Infrastructure Action - Structuring.
Lunchtime S.I.E.S.T.A. James Butterworth Finding Atomic Nuclei Offenders with James the Nuclear Detective “It’s element.. element... elementary my dear.
The CARIBU facility Guy Savard Argonne National Laboratory & University of Chicago ATLAS Users Meeting May
On-line tests RFQ cooler ISCOOL A quick summary P. Delahaye, H. Frånberg, I. Podadera ISCOOL, COLLAPS, ISOLDE collaboration.
ISCC 24 May 2004L.M. Fraile L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report ISOLDE Collaboration Committee 24 th May 2004 ISOLDE scientific.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
Welcome to the CHARMS See – Tea Sunday, October 11, 2015 Release of Light Alkalis (Li, Na, K) From ISOLDE Targets Strahinja Lukić,
Nuclear physics: the ISOLDE facility
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Radioactive ion beam facilities How does they work ? 2012 Student Practice in JINR Fields of Research 9.oct.2012 I. Sivacekflerovlab.jinr.ru.
JINR PAC, Dubna, G. Gulbekian Status of the DRIBs III Project cyclotron DC280 new experimental hall (SHE factory) cyclotron U400R reconstruction.
Mass measurements using low energy ion beams -1- C. Thibault 31 mars 2004 Motivations to measure masses Present status Experimental methods for direct.
MR-TOF at ISOLDE Frank Wienholtz - University of Greifswald - for the ISOLTRAP Collaboration GUI –
First application of ranging-out method and hybrid 3Hen counter at ISAC-1: measurement of absolute beta-delayed neutron rates (I βn ) for Ga and Ge isotopes.
Oliver Kester I3 EURONS EURONS, EURISOL-DS Town Meeting, Helsinki, Finland, Sept Advanced charge state breeding Objectives: To optimize the charge.
Improved Design for an ECR Charge Breeder of Radioactive Beams
RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE.
The REXTRAP Penning Trap Pierre Delahaye, CERN/ISOLDE Friedhelm Ames, Pierre Delahaye, Fredrik Wenander and the REXISOLDE collaboration TAS workshop, LPC.
24 January 2001J. Lettry1 ISOLDE Introduction –PSB-beam, Targets –Ion-sources Facility performance –Front-ends and robots –Target production –Safety.
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
A mass-purification method for REX beams
Beam Instrumentation for the HIE-ISOLDE linac Francesca Zocca ISOLDE Workshop and Users Meeting December CERN Instituto de Estructura de la.
The HIE-ISOLDE Faraday Cup
Trends in Heavy Ion Physics Research, Dubna, May Present and future physics possibilities at ISOLDE Karsten Riisager PH Department, CERN
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
LIST status and outlook Sven Richter for the LIST-, RILIS- and Target-Collaborations 21 st of August 2013.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
Welcome to the CHARMS See – Tea Saturday, March 05, 2016 Comparison of ISOLDE yields with calculated in- target production rates Strahinja Lukić,
Riccardo Raabe (IKS, KU Leuven) for the Collaboration INTC 01/02/2012 INTC-O-014 Storage ring facility at HIE-ISOLDE: Technical Design Report.
TRI  P RFQ design, simulations and tests E. Traykov TRI  P project and facility RFQ tests and design Simulations Conclusion TRI  P Group: G.P. Berg,
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
Low-contamination Rare and Exotic Beams (at CARIBU) Sergey Kondrashev October 16, 2012.
Nuclear physics: the ISOLDE facility Magdalena Kowalska CERN, PH-Dept. on behalf of the CERN ISOLDE team Lecture 2:
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, February 11, 2008 ISOLDE scientific coordinator’s report INTC meeting, February.
Linking TSR to ISOLDE Fredrik Wenander, TSR workshop, CERN, Outline 1. Machine parameters 2. Operational experience 3. Beam-line layout 4.
Beam Preparation, Task 9 Department of Physics, University of Jyväskylä.
Comprehensive investigation of the decay losses in the ISOL extraction method KP2 Seminar, Strahinja Lukić.
January 30, 2007 CERN Resonant laser ion sources By V. Fedosseev.
STATUS REPORT ON THE “MASHA” SET-UP A.M.Rodin, A.V.Belozerov, S.N.Dmitriev, Yu.Ts.Oganessian, R.N.Sagaidak, V.S.Salamatin, S.V.Stepantsov, D.V.Vanin PAC.
Lecture at the MEDICIS-PROMED Summer School
Proposal to the INTC, 21. May 2007
NICA injection complex status
A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Progress in the Multi-Ion Injector Linac Design
First results from IS468 and further investigation of in-trap decay of 62Mn First results from 2008 ; Problems and questions ; Further investigations ;
Acceleration of RIB using linacs
A “standard” ISOLDE target: ThO2-184, n-rich Cu
REX operation and development in 2006
Status of the beta-beam study
How to run ions in the future?
Design of a PET-isotope-based hadron therapy facility
FEBIAD ion source development efficiency improvement
Alexander Herlert, CERN (PH-SME-IS)
ISOLDE Technical report for INTC 21/5/2007
Magdalena Kowalska, CERN PH-SME-IS
Magdalena Kowalska, CERN PH-SME-IS
Precision Measurements of Very-Short Lived Nuclei
EMIS, 2002, Victoria, Canada Mats Lindroos for PSMB Mats Lindroos.
INTC September 2002 ISOLDE Mats Lindroos Mats Lindroos.
Status of the charge breeder upgrade
Status of the JLEIC Injector Linac Design
Multi-Ion Injector Linac Design – Progress Summary
Improvement of a dc-to-pulse conversion efficiency of FRAC
Presentation transcript:

Charge breeding at REX-ISOLDE HIE-EBIS workshop 16-17/ Fredrik Wenander CERN

KoRIA * ECRIS and EBIS * Design REX-ISOLDE, CERN * EBIS/ECRIS * Operation/Stopped SPES, LNL * ECRIS * Design CARIBU, ANL * ECRIS/EBIS * Operation/Commissioning TRIAC, JAERI * ECRIS * Stopped Charge breeders for RIBs worldwide SPIRAL/SPIRAL2 * ECRIS * Design VECC * ECRIS * Commissioning ARIEL, TRIUMF * EBIS? * Planning TITAN, TRIUMF * EBIT * Operational ISAC, TRIUMF * ECRIS * Operation ReA, MSU * EBIT * Commissioning EURISOL, Europe * EBIS/ECRIS * Design

Radioactive nuclei: main interest for nuclear physics Proton dripline Neutron dripline Potential and delivered beams To this date: ~6000 nuclei believed to ‘exist’ ~3000 different nuclides experimentally observed Less than 10% stable 32 different radioactive elements for physics ~100 isotopes accelerated ~100 beam times radioactive stable REX-ISOLDE beams

REX-ISOLDE Post accelerator to 3 MeV/u Room temperature Linac First experiment 2001

Ion mass4 to >250He to >U Intensityfew to >1E11 ions/sLarge dynamic range Charge1+Some (undesired) 2 +, 3 +,… Energy30 to 60 keV Energy spreadfew eV Temporal structurequasi-cwProton impact every n*1.2 s ISOL beam parameters Release curve Semi-continuous depending on release properties and ionization time typical tens ms to minutes (r=rise, f=fast, s=slow) 8 Li (T 1/2 = 840 ms) produced by target fragmentation of tantalum foils Extra

See also ISOL beam parameters Transverse emittance mm mrad90% at 60 keV Half-life>10 msLimited by ISOL-system SelectionNot necessarily isobarically clean Use e.g. resonant ionizing laser ion source ISOL magnet selects A/Q (Q=1) Z resonant laser separation N

0 Achievable A/Q (3<A/Q<4.5) 1 High breeding efficiency rare radionuclides limit machine contamination chain of machines 2 Short breeding / confinement time handle short-lived ions 3 Clean extracted beams 4 High ion throughput capacity 5 Good beam-quality (large α, small  trans, small  E extr ) good trapping efficiency high linac/separator transmission  good mass separation 6 Easy handling and reliable to be used in an accelerator chain on a production basis Breeder criteria  ionization Checklist for ‘normal’ breeder design  target ion source  separation  breeding  acceleration  detector  CB delay For HIE-EBIS tougher requirements

Beam out of REXTRAP * Bunching: few us * Transverse emittance: ~30 -> ~10  mm.mrad at 30 keV *  E  t~10 eVus EBIS injection works Non-cooled Cooled NB! Usually not isobarically cleaned

* Only 15 min delivered beam for 24 h beam time -> + excellent signal-to-noise ration - high instantaneous rates (DAQ dead-time, pile-up) => implement slow (ms) extraction REXEBIS extraction times Self extraction, 14 N 4+ measured before Linac FWHM~25 us * Beam pulse can be extended from 25 us to >400 us FWHM (pulse length limited by Linac RF duty cycle to 800 us, from ms) * Mass and q dependent – no standard settings (need TOF from experiment for tuning) Slow extraction, 190 Pb 44+ measured with Miniball detector 500 us FWHM t (us) See Andrey’s presentation

Beam contamination Can’t see the trees for the forest Beam impurities: a. isobaric contamination from ISOL-target Remember: often deal with 1.7 fA What’s problem?

Molecular beams The idea 1. Use chemical properties to separate isobars e.g. 96 Rb from 96 Sr 2. Create a molecular sideband ( 96 Sr 19 F + ) with gas leak at ISOL-target 3. Molecular ions are extracted and selected in the separator (A=115 selection) 4. Keep molecules inside trap, break them in EBIS 5. Charge breed as usual and obtain clean 96 Sr All elements ionized by the ISOLDE 1+ source 96 Sr 19 F+ 115 In+ A/q=115 ISOLDE separator Trap EBIS F REX separator 96 Sr 27+ A/q= In 32+ A/q= In 33+ A/q= <A/q< 3.58 REX linac Double separation Benefit from larger I e

A/q-resolution ~150 Mass separator After REXEBIS A/q < 4.5 Emittance ~10-25 mm mrad 20 kV  E < 50 eV*q ? Energy of 5 keV/u ( determined by RFQ) After REXEBIS A/q < 4.5 Emittance ~10-25 mm mrad 20 kV  E < 50 eV*q ? Energy of 5 keV/u ( determined by RFQ) Nier-spectrometer Even so, some A/Q contaminants difficult to resolve 7 Be 3+ from 14 N 6+ R= F 9+ from 12 C 6+ R=19200

? Clean beam? Extracted beams from REXEBIS as function of A/q showing residual gas peaks and charge bred 129 Cs. The blue trace is with and the red trace without 129 Cs being injected. residual gases in CB I residual   0->1+ P res gas Isotope toolbox turns 10

* C, O, Ne and Ar partial pressures around 3  , 2  , 5  and 4  mbar How pure is the beam really? 12 C O Ne Ar Ne Ne Ar Ti 11+ ? 60 Ni 14+ ? 90 Zr 21+ ? A/q=4.24 IsotopeA/qZOrigin 17O residual gas 21Ne 4.210buffer gas 38Ar residual gas 47Ti drift tubes 51V4.2523NEG strips 63Cu4.229anode and collector 80Kr, 84Kr4.21, 4.236residual gas 94Zr NEG strips 139La cathode Other elements that can be present at other A/q are: He, C, Nresidual gases Bcathode Fe NEG strips, stainless steel Nistainless steel Crstainless steel Mo stainless steel

Continuous injection ‘accu’ mode Local ion source + Collect ions continuously => no Penning trap needed + Adapted to ISOL ion sources + Shorter cycle times + Collect ions continuously => no Penning trap needed + Adapted to ISOL ion sources + Shorter cycle times * Na+, K+, Rb+, SrF+ from both local ion source and from ISOLDE target * CW operation even used for a run 96 Sr(F) - continuous injection into EBIS * CW beam from the RFQ cooler: EBIS efficiency alone of 5% for 87 Rb 17+, T breed = 29 ms * Some problems... * Na+, K+, Rb+, SrF+ from both local ion source and from ISOLDE target * CW operation even used for a run 96 Sr(F) - continuous injection into EBIS * CW beam from the RFQ cooler: EBIS efficiency alone of 5% for 87 Rb 17+, T breed = 29 ms * Some problems...

In-trap decay Be Tested first time at REX-ISOLDE with 61 Mn (T 1/2 =675 ms; 1.7x10 6 atoms/s) T trap T breed Result ms28 msno Fe detected at Miniball ms298 ms57(7)% Fe detected agrees with predictions In-EBIS decay Benefit from increased: 1. radial holding voltage 2. higher electron beam β ± -decay

Hot spots in REX 40-70% Losses, in percent of the ISOLDE beam 5-10% 35-40% 2-5% 1-2% ISOLDE * Class C Lab * Handle 100 LA Radiation / contamination

* Two separators (GPS and HRS) in parallel * ~180 shifts scheduled 2012 * In between stable beams from EBIS for: calibration of detector setups machine development (beam diagnostics tests, Linac, controls upgrades) * Running from beginning of April to mid December * Scheduled 2 weeks machine stop if requested Consequences of a breakdown -> cancelled run (not less statistics but no measurement) ISOLDE schedule Red boundary = REX run Purple = REX setup

Beam zapping with REX Beams to the Miniball experiment from ISOLDE target #433, Aug/Sep 2010 REX used to be difficult to setup Since 2010 improved scalability and reproducibility At least 16 changes in 15 days!

1. REX breeder system is working extremely well! 2. Penning trap complicates things but: can be used for isobaric mass separation crucial for injection into a storage ring after the post-accelerator 3. Effort presently put on Linac energy upgrade 4. Future serious challenges for REXEBIS breeder upgrade Conclusions

Bunched beam : high instantaneous rate !  deadtime … Good signal/background … 1 shift at REX = 19 min actual measuring time Trapping Charge Breeding Post Acceleration Time Structure EBIS REX TRAP Slide borrowed from J. van de Walle