System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.

Slides:



Advertisements
Similar presentations
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
Advertisements

March 25, 2010 WestConnect Transmission Planning Update Bob Easton TEPPC Meeting.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
2009 Generators that have Achieved Certification Arizona Public Service Company ATCO Electric Ltd. Avista Corporation Basin Electric Power Company Black.
VGS-Planning Work Group (PWG) Activity Update to PCC Ann Finley PWG Liaison to PCC Metropolitan Water District of So. California June 9-11, 2010.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
WECC Operating Committee Operations Training Subcommittee Report Bill Simmons, OTS Chair March 25, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
NORTHWEST POWER POOL Reliability Update
SRWG Chair Report March 2015 WECC HQ
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
Variable Generation Subcommittee Update to PCC Ann Finley - VGS-PCC Liaison Metropolitan Water District of So. Cal October 7, 2014 Salt Lake City, Utah.
RASRS Report to Operating Committee July 15, 2015 Milt Patzkowski, Vice-Chair Remedial Action Scheme W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
System Installation and Setup Doug Tucker Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.
Planning Coordinator Function Task Force Survey Results Doug Tucker Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
MAC Committee Update Robert Kondziolka, MAC Chair.
NORTHWEST POWER POOL Reliability Update – Summer 2010 April 2010 Jerry D. Rust.
BCCS Update Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Base Case Coordination System Report Philip Augustin – TSS Chair Nathan Powell – PCC Staff Liaison July 2015 Salt Lake City, UT W ESTERN E LECTRICITY C.
Study Program Comparison Protocol vs Proposal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 Joint Initiative Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010.
Building a Project Jon Jensen Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ISAS Report Andy Meyers ISAS Chair Operating Committee Meeting October 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
Gen Maintenance w/ GridView DWG – Dec. 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
Unscheduled Flow Administrative Subcommittee Report Robin Chung October 8, 2014 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
SRWG request to JUG John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
North America Energy Standards Board Craig L. Williams, Specialist Ld./Sr. ISAS Meeting April 20, 2016 Salt Lake City, UT W ESTERN E LECTRICITY C OORDINATING.
RASRS Report to Operating Committee March 22, 2015 Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee W ESTERN E LECTRICITY C OORDINATING.
Oversight Update Michael Moon, Vice President Registered Entity Oversight W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
BCCS Alternatives Task Force Update to TSS Andrew Christensen, BATF Chair Presented to TSS Aug 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RASRS Report to Operating Committee March 21, 2017
Reconciling Power Flow (PF) with Production Cost Model (PCM) Cases
PMC Membership as of 5/1/2016 Enrolled TO Coordinating TO 1
Philip Augustin TSS Chair
Eleanor Ewry Base Case Coordination Subgroup Chair
Nick Hatton Associate Engineer March 9, 2017
Background on the 2016 Study Program Process
Eastern Region PPL Electric Utilities Allegheny Power
Transition Plan for Removing Wind Phase 1 Generic Models
Reliability Assessment Committee Reliability Workshop Priorities
Jonathan young ColumbiaGrid
Planning Coordinator Gap Update March 25, 2014
ERS Forward Looking Measures 1, 2 & 4
Joe Seabrook Puget Sound Energy, Inc.
Jonathan Young SDWG Chair
Reliability Assessment Committee Reliability Workshop Priorities
Andrew Christensen, SRWG Chair
SRWG Chair Report March 2015 WECC HQ
Tracy Rolstad TSS Chair
Transition Plan for Removing Wind Phase 1 Generic Models
Jonathan Young SDWG Chair
Andrew Christensen, SRWG Chair
System Review Work Group Update to TSS
System Review Work Group Update to TSS
ERS Forward Looking Measures 1, 2 & 4
Joe Seabrook Puget Sound Energy, Inc.
Jonathan Young ColumbiaGrid
Presentation transcript:

System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

SRWG Priorities Work Plan being development Identify list of tasks/issues Describe effort and benefits of each item Prioritize list 2 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

2017 Base Case Compilation Schedule Approval Item: 2017 Base Case Compilation Schedule Grouped timeline for similar cases – Reduce topological differences – Improved efficiency Due Dates – Replaced Area Coordinator with Data Submitter – Removed Sub-Coordinator dates – refer to MOD-032 Scenarios – TEPPC case – no pre-run build, just review – 2021 Light Spring – 2020 Heavy Winter – S -> N flows 3 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

2017 Data Preparation Manual Substations Turbine Type Bypass Breakers Multi-section lines RAS data submittal Approval Item: 2017 Data Preparation Manual Additional discussion points after decision 4 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

DPM: Substations Benefits: – Aggregating buses to Substations is needed in GIC studies – Provides a correlation object between WSM and planning model – A useful step towards node-breaker model Costs: – Need to populate the data but GIC data request will substantially complete the effort – Users will need to become competent in the concept of modeling substations 5 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

DPM: Turbine Type Benefit: – Attempting to match EIA Form 890 list Cost: – Steady state data in PSLF format won’t contain specific wind turbine type 6 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

DPM: Bypass Breakers Benefit: – Existing concern with conversion between software 28 of 178 series devices are modeled as bypassed in PSLF but not in PSSE – A useful step towards node-breaker model – Align with WSM Cost: – Changing existing data 7 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Bypass Breaker Example 8 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Not Bypassed Explicit Bypass Implicit Bypassed

DPM: Multi-section Lines Benefit: – Reduce conversion issues between software – Unnecessary to model conductor changes – Align with desire for explicit model of bypass breakers Cost: – Changing existing data 9 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Multi-section Line Example 10 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Merging two line sections

Number of Multi-section Lines Area NumArea Name# of MS Lines 40NORTHWEST66 14ARIZONA49 30PG AND E43 10NEW MEXICO31 26LADWP23 60IDAHO18 24SOCALIF14 65PACE7 22SANDIEGO6 50B.C.HYDRO2 20MEXICO-CFE1 54ALBERTA0 52FORTISBC0 21IMPERIALCA0 73WAPA R.M.0 70PSCOLORADO0 64SIERRA0 63WAPA U.M.0 62MONTANA0 18NEVADA0 11EL PASO0 Owner NumberOwner Name# of MS Lines 390Pacific Gas and Electric88 14Bonneville Power Admin81 79Tucson Electric Power74 129PN2 New Mexico55 81City of Los Angeles48 11Idaho Power Company41 74Southern California Edison29 2Arizona Public Service26 4WAPA-DSW19 26WAPA L.M.18 13PacifiCorp - West17 30Puget Sound Energy13 80Salt River Project12 15Seattle City Light12 7PacifiCorp - East11 32Portland General Elec11 50US Bur Reclam - N Pac Regn9 136SDG&E8 130PN1 New Mexico8 364California-Oregon Trans. Project7 740NON SCE Owned - SCE Area6 16Imperial Irrigation District4 420Orcas Power & Light Company4 127TSGT New Mexico3 34Snohomish PUD3 …….… A couple more with less than 3 11 W ESTERN E LECTRICITY C OORDINATING C OUNCIL 240 multi-section lines 572 sections of multi-section lines 137 series caps as part of multi-section line

RAS Data Submittal 35. By March 31, 2016, WECC will have developed the capability for entities to model RASs so that they can be added to its powerflow base cases. – PowerWorld-Done, PSLF-Almost, PSSE-? By June 30, 2016, WECC will update the Data Preparation Manual to include the requirement for data submitters to include RAS models in their submittal to WECC. – Approve the 2017 DPM WECC will produce the first powerflow base case to include RAS models by July – Entities submit RAS models and WECC produce a base case with the data By June 30, 2017, all WECC base cases shall include all (1) RASs, and (2) overcurrent protection relays with inter-TOP impact, known to WECC to exist in the Western Interconnection as of the Effective Date. In the interim, WECC collected and posted so me data on RASs and relays with inter-TOP impact so that entities can model those impacts until those RASs and relays are modeled in the WECC base cases. Any RASs installed in the Western Interconnection after June 30, 2016 and known to WECC to exist shall be modeled in the base cases as soon as practicable in coordination with WECC’s established base case production schedule. – Continue submitting RAS models 12 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

More DPM Discussion DPM document categorization? Modeling Balancing Area – See change request from WECC staff – Approval Item: DPM Change Request for modeling Balancing Areas Modeling projects with no Planning Coordinator – See change request from Southwest Power Group – Approval Item: DPM Change Request for modeling projects with no Planning Coordinator 13 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

SRWG Vice Chair Encourage consideration of volunteering 14 W ESTERN E LECTRICITY C OORDINATING C OUNCIL