Remediation and Redevelopment at the Former Fort Devens, Massachusetts.

Slides:



Advertisements
Similar presentations
CASE STUDIES Client:Developer of former Manufactured Gas Utility Plant Property Problem:Developer bought contaminated former plant site to develop for.
Advertisements

Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
BoRit Superfund Site Timeline
Environmental Protection Commission Overview Vision: Environmental Excellence in a Changing World.
THE BRAC PROCESS – Not Your Usual Brownfields Redevelopment Mary K. Ryan.
GASB 49 –Accounting & Financial Reporting for Pollution Remediation Obligations An Overview.
1 Fort Monroe: An Update on the Environmental Cleanup VDEQ Presentation to the Fort Monroe Federal Area Development Authority March 19, 2009.
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
Reuse / Revitalization. What is Reuse / Revitalization? Restoring contaminated and potentially contaminated sites to productive use.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Stephen TerMaath Chief, BRAC Program Management Division 5 June.
The Alaska Brownfield Initiative John B. Carnahan Alaska DEC – Brownfield Coordinator Alaska Forum on the Environment
PMOBRAC Ms. Kimberly Kesler Director, BRAC Program Management Office March
Jill Lowe Remedial Project Manager August 7, 2013.
Department of Defense Facilities Unit Hazardous Waste Management Program of the EPD Land Protection Branch.
Massachusetts Department of Environmental Protection MA Brownfields Initiative.
Jennifer Wendel, EPA March 25, 2015
AMBLER BOILER HOUSE REDEVELOPMENT AMBLER BH DEVELOPMENT PARTNERS, LLC RT ENVIRONMENTAL SERVICES, INC.
Margaret Somer, Regional Director Small Business Development Center, Northeast Mass Salem State College.
Brownfield Opportunity Areas Program Pre-Nomination Study for the Town of Erwin Village of Painted Post and Village of Riverside.
1 Remediation and Redevelopment at the Former Fort Devens, Massachusetts, USA.
Green Remediation An Overview of the State of the Practice
Office of Smart Growth p. 1 WIND ENERGY SYMPOSIUM THE COLLEGE OF NEW JERSEY Thursday, July 23, 2009 B rownfields R edevelopment I nteragency T eam.
Wisconsin’s Brownfields Initiative National Governors Association Coastal Brownfields Cambridge, MA September Michael Prager-Wisconsin Dept. of.
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
1 Facilitating Reuse at RCRA Sites: Innovative Technologies for Groundwater Characterization and Cleanup Introduction Walter W. Kovalick Jr., Ph.D. Associate.
Office of Smart Growth p. 1 WIND ENERGY SYMPOSIUM RUTGERS UNIVERSITY Friday, September 25, 2009 B rownfields R edevelopment I nteragency T eam.
NATO-CCMS Pilot Study Tour de Table - Greece Recent Developments on Contaminated Land in Greece Anthimos Xenidis Laboratory of Metallurgy National Technical.
The State of Ohio is an Equal Opportunity Employer and Provider of ADA Services Ohio Brownfield Fund Local, State & Federal Resources to Redevelop Blighted.
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.
Underground Storage Tank Compliance Act of 2005 Bill Torrey UST/LUST Regional Program Manager US EPA – New England EBCNE April 19, 2006.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Office Managers US EPA New England Susan Studlien, Director Office of Site Remediation and Restoration Stephen Perkins, Director Office of Environmental.
THE GEORGIA BROWNFIELD PROGRAM MAY 22, BROWNFIELD: FEDERAL DEFINITION Real property, the expansion, development or reuse of which may be complicated.
RISK MANAGEMENT AND ASSESSING LIABILITY Helping Communities Pursue Reuse Opportunities at Contaminated Properties March 25, 2015.
Office of the Assistant Secretary of the Army Installations and Environment Our Installations Supporting the War: Relevant and Ready “Installation Transformation.
The Superfund ERA Process. What is Superfund? Superfund was created on December 11, 1980 when Congress enacted the Comprehensive Environmental Response,
NORWOOD PCBS SITE Daniel Keefe, Region 1 Remedial Project Manager.
New activities Tour de Table – Lithuania Kestutis Kadunas, Geological Survey of Lithuania.
BROWNFIELDS: “Financial and Technical Support for Redevelopment” HAYWOOD COUNTY, NORTH CAROLINA BROWNFIELDS COALITION Presented to: TOWN OF WAYNESVILLE.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Hazardous Waste Management Legislation RCRA – Resource Conservation and Recovery Act Regulate management and disposal of wastes currently being produced.
Fairfax County ParkwayJuly 2011TRB Workshop CERCLA 120(h) CERCLA §120(h) imposes several requirements on all transfers of federal real property to non-federal.
RE-Powering America’s Land: Renewable Energy on Potentially Contaminated Land and Mining Sites December 15, 2010 Lura Matthews Phone: (202) U.S.
CalEPA Interagency Partnership for Site Cleanup & Reuse in LA County Big Tent Celebration: Connecting Circles for Equitable, Healthy, and Resilient Communities.
Office of Legacy Management Land Transfer and Reuse November 2006 Steven R. Schiesswohl Senior Realty Officer, Office of Legacy Management.
RCRA 2020 Vision… A View from a Facility Owner Lloyd E. Dunlap Atlantic Richfield Company, BP.
Brownfields 101 Federal and State Role in Brownfields Redevelopment Carol Tucker, Section Chief Brownfields Program US EPA New England.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
Moderator:Richard W. Holtz General Counsel, MassDevelopment Panelists:Bryan Olson Chief of the Federal Facilities Superfund Section, EPA Region 1 Adam.
South Framingham Initiative MassDEP’s Project to Improve Environmental Quality in an Environmental Justice Neighborhood 2015.
The Voluntary Investigation and Cleanup Program Investing in the environment and your economic future Gerald Stahnke, VIC Program Project Manager Minnesota.
Brownfields Redevelopment Financing for Small Cities, Rural Communities And Tribes October 27-29, 2003 Sharon Kophs Washington State Department of Community,
LESSONS LEARNED: A CALIFORNIA PERSPECTIVE Robert L. Elliott, Staff Counsel California Environmental Protection Agency, Department of Toxic Substances Control.
The Dalles, Industrial Certification Northwest Aluminum Company The Dalles, Oregon Douglas C. MacCourt Ater Wynne LLP US German Bilateral Working.
DRAFT The RCRA Cleanup Vision for 2020 “Where are We Going? Matt Hale Director, Office of Solid Waste U.S.EPA.
Somerville, MA From mattress factory to assisted living Rochester, NY From car dealer/repair shop to residential Old Town, ME From warehouse to waterfront.
COMMUNITY DEVELOPMENT RESOURCES, HELPING WISCONSIN SUCCEED 7 Rivers Alliance Rural Workforce Housing Summit June 1, 2016.
Financial Assistance 101 Planning for Brownfields Redevelopment Gregory M. Firely, BCES Senior Project Scientist.
BROWNFIELDS 2005 Dealing with Unexpected Contamination Lowry Air Force Base Redevelopment Denver, CO Tom Markham, Executive Director, Lowry Redevelopment.
Sustainable Devens: Applying Eco-Industrial Development to a former military base Peter Lowitt, AICP Boston November, 2006.
New and Exciting Opportunities for Federal Property Transfers Michael P. Comodeca Spencer Fane Britt & Browne LLP
Located at the intersection of Interstate 70 and Goodfellow Blvd. on the City’s northwest side SLAAP St. Louis Army Ammunition Plant.
Long-Term Stewardship: Ensuring the Safe Use of Contaminated Sites Brownfields 2006 Boston, MA.
Proposed Plan for No Further Action
Redevelopment Authority of the County of Washington O
THE SUPERFUND PROCESS Assessment and Listing
Oak Ridge Office of Environmental Management Update
RESTORING CONTAMINATED SITES TO PRODUCTIVE USE
Revitalization Through TCEQ Brownfields Kristy Livingston, Brownfields Program Manager, Remediation Division, TCEQ.
Presentation transcript:

Remediation and Redevelopment at the Former Fort Devens, Massachusetts

Former Fort Devens Site Description  9,280 acres divided into North, South and Main Posts  Located in the towns of Ayer, Shirley, Lancaster and Harvard, Massachusetts  Established in 1917 for training soldiers in the New England area; operated as an Army base for over 70 years

Former Fort Devens Site Description (cont.)  December 1989 – Fort Devens listed on the National Priority List (“Superfund” Site)  July 1991 – North and Main Posts were slated for closure and South Post for realignment under the Defense Base Realignment and Closure Act (BRAC)  March 1996 – Fort Devens realigned; remaining Army properties assimilated by the Devens Reserve Forces Training Area

Environmental Conditions and Cleanup  Over 300 sites identified for environmental evaluation (e.g., former storage tanks and fueling stations, maintenance and waste accumulation areas, spill sites, transformer leaks)  700 acres held by the Army for cleanup prior to transfer  Many sites addressed in Records of Decision and in “No Further Action Decision Documents” – many cleanup successes

Former Fort Devens - Reuse and Redevelopment Planning In 1994, Massachusetts passes legislation:  Creating the Devens Regional Enterprise Zone;  Establishing the Devens Enterprise Commission – public agency responsible for permitting redevelopment projects – one stop permitting guaranteed in 75 days;  Empowering MassDevelopment, a quasi-public redevelopment agency, to oversee redevelopment planning and implementation;  Authorizing MassDevelopment to issue bonds and to borrow up to $200 million to redevelop the site; and  Establishing incentives to stimulate private sector redevelopment

Devens Reuse Plan  MassDevelopment worked with the public and town representatives and, in 1994, the Devens Reuse Plan was prepared.  The Reuse Plan focused on sustainability, protecting existing natural ecosystems, and working with the known environmental conditions.  The Reuse Plan provided critical future use decisions up front which facilitated remediation of contaminated sites.

Case Study - Devens Housing Areas  Location of former military housing slated for redevelopment of new housing or commercial redevelopment (Reuse Plan)  During demolition of old housing, MassDevelopment identified pesticide and asbestos contamination  During evaluation of pesticide/asbestos contamination, PCBs and arsenic contamination identified – Army brought back in  Supplemental site investigation led to the identification of the Grant Housing areas as historical 37 mm range = potential for unexploded ordnance (UXO)

Devens Housing Areas (cont.)  Market demands for housing led MassDevelopment to propose future housing development for all former housing areas = change to proposed reuse = more diligent characterization effort  Soils contaminated with pesticides, asbestos, and PCBs being excavated and disposed – pesticide contaminated soils being evaluated for reuse for landfill regrading  MassDevelopment negotiating costs to remediate areas slated for commercial redevelopment to residential standards  MassDevelopment took responsibility for UXO survey and clearance in Grant Housing area

10 Closing Thoughts….  Don’t be surprised by surprises!  Shared risk among the partners  Decide when to invest in cleanup, and when to negotiate  Consider all the tools (e.g., insurance)

Contact Information Mary C. Sanderson U.S. EPA Region I One Congress Street, Suite 1100 (HBT) Boston, MA phone: (617) William M. Burke Executive VP, Devens Military Initiatives MassDevelopment 33 Andrews Parkway Devens, MA phone: (978)