Predrag Buncic CERN ALICE Status Report LHCC Referee Meeting 24/05/2015.

Slides:



Advertisements
Similar presentations
Grid operations in 2014 ALICE Offline week 20 March 2015 Latchezar Betev.
Advertisements

T1 at LBL/NERSC/OAK RIDGE General principles. RAW data flow T0 disk buffer DAQ & HLT CERN Tape AliEn FC Raw data Condition & Calibration & data DB disk.
ALICE Operations short summary LHCC Referees meeting June 12, 2012.
Predrag Buncic CERN DPG, DPP & Other News. Step back.
LHCb computing in Russia Ivan Korolko (ITEP Moscow) Russia-CERN JWGC, October 2005.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 25 th April 2012.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
Tracking Task Force Predrag Buncic Offline Week, 19 March 2014.
Predrag Buncic CERN ALICE Status Report LHCC Referee Meeting September 22, 2015.
ALICE – networking LHCONE workshop 10/02/ Quick plans: Run 2 data taking Both for Pb+Pb and p+p – Reach 1 nb -1 integrated luminosity for rare.
ALICE Grid operations: last year and perspectives (+ some general remarks) ALICE T1/T2 workshop Tsukuba 5 March 2014 Latchezar Betev Updated for the ALICE.
Ian Bird LHC Computing Grid Project Leader LHC Grid Fest 3 rd October 2008 A worldwide collaboration.
Status of PDC’07 and user analysis issues (from admin point of view) L. Betev August 28, 2007.
PWG3 Analysis: status, experience, requests Andrea Dainese on behalf of PWG3 ALICE Offline Week, CERN, Andrea Dainese 1.
Predrag Buncic Future IT challenges for ALICE Technical Workshop November 6, 2015.
Predrag Buncic ALICE Status Report LHCC Referee Meeting CERN
OPERATIONS REPORT JUNE – SEPTEMBER 2015 Stefan Roiser CERN.
ATLAS Distributed Computing perspectives for Run-2 Simone Campana CERN-IT/SDC on behalf of ADC.
Predrag Buncic CERN Future of the Offline. Data Preparation Group.
Predrag Buncic CERN ALICE Status Report LHCC Referee Meeting 01/12/2015.
Ian Bird WLCG Networking workshop CERN, 10 th February February 2014
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
ALICE Computing Model A pictorial guide. ALICE Computing Model External T1 CERN T0 During pp run i (7 months): P2: data taking T0: first reconstruction.
ALICE Grid operations +some specific for T2s US-ALICE Grid operations review 7 March 2014 Latchezar Betev 1.
ALICE Run 2 Readiness WLCG Collaboration Workshop Okinawa Apr 11, 2015 Maarten Litmaath CERN v1.2 1.
1 Reconstruction tasks R.Shahoyan, 25/06/ Including TRD into track fit (JIRA PWGPP-1))  JIRA PWGPP-2: Code is in the release, need to switch setting.
16 September 2014 Ian Bird; SPC1. General ALICE and LHCb detector upgrades during LS2  Plans for changing computing strategies more advanced CMS and.
Meeting with University of Malta| CERN, May 18, 2015 | Predrag Buncic ALICE Computing in Run 2+ P. Buncic 1.
Domenico Elia1 ALICE computing: status and perspectives Domenico Elia, INFN Bari Workshop CCR INFN / LNS Catania, Workshop Commissione Calcolo.
Some topics for discussion 31/03/2016 P. Hristov 1.
ALICE Full Dress Rehearsal ALICE TF Meeting 02/08/07.
Predrag Buncic CERN Data management in Run3. Roles of Tiers in Run 3 Predrag Buncic 2 ALICEALICE ALICE Offline Week, 01/04/2016 Reconstruction Calibration.
ATLAS Computing: Experience from first data processing and analysis Workshop TYL’10.
Predrag Buncic CERN Plans for Run2 and the ALICE upgrade in Run3 ALICE Tier-1/Tier-2 Workshop February 2015.
ALICE Offline Week – 22 Oct Visualization of embedding Matevz Tadel, CERN Adam Kisiel, Ohio State University.
Grid Operations in Germany T1-T2 workshop 2015 Torino, Italy Kilian Schwarz WooJin Park Christopher Jung.
LHCb Computing 2015 Q3 Report Stefan Roiser LHCC Referees Meeting 1 December 2015.
CALIBRATION: PREPARATION FOR RUN2 ALICE Offline Week, 25 June 2014 C. Zampolli.
LHC collisions rate: Hz New PHYSICS rate: Hz Event selection: 1 in 10,000,000,000,000 Signal/Noise: Raw Data volumes produced.
ATLAS – statements of interest (1) A degree of hierarchy between the different computing facilities, with distinct roles at each level –Event filter Online.
TPC distortions correction and readiness for 2015 data processing 1 ALICE Offline Week, 30/03/2016, R.Shahoyan.
T1/T2 workshop – 7th edition - Strasbourg 3 May 2017 Latchezar Betev
TPC status report Marian Ivanov.
Ian Bird WLCG Workshop San Francisco, 8th October 2016
ALICE internal and external network
Predrag Buncic ALICE Status Report LHCC Referee Meeting CERN
evoluzione modello per Run3 LHC
DPG Activities DPG Session, ALICE Monthly Mini Week
Workshop Computing Models status and perspectives
Visualization of embedding
Production status – christmas processing
Vanderbilt Tier 2 Project
fields of possible improvement
ALICE – First paper.
Offline data taking and processing
30th meeting of the ALICE RRB C. Decosse
LHCb Software & Computing Status
Philippe Charpentier CERN – LHCb On behalf of the LHCb Computing Group
Dagmar Adamova (NPI AS CR Prague/Rez) and Maarten Litmaath (CERN)
Disk capacities in 2017 and 2018 ALICE Offline week 12/11/2017.
Progress with MUON reconstruction
Offline shifter training tutorial
ALICE Computing Model in Run3
Status of ALICE pledges Predrag Buncic
ALICE Computing Upgrade Predrag Buncic
QA tools – introduction and summary of activities
New strategies of the LHC experiments to meet
Computing at the HL-LHC
Presentation transcript:

Predrag Buncic CERN ALICE Status Report LHCC Referee Meeting 24/05/2015

The ALICE Grid sites today 2 4 in North America 2 in South America 54 in Europe 2 in Africa 11 in Aisa ORNL CBPF Vienna Wuhan Bandung Cibinong MoU signed with Azerbaijan, opening a door for possibly significant contribution to ALICE Grid

New sites ORNL – since August 2015 (replaces LLNL) Bandung and Cibinong – since August 2015 CBPF – since December 2015 Vienna – since April 2016 Wuhan (back) – since September 2015 ALICE HLT cluster 3 HLT - fully virtual site

Current record 4 April 2016 – 100K concurrent jobs

Wall time resources share Organized analysis: centres MC productions: centres RAW data processing: T0/T1s only Individual analysis: centres 460 users Share ~same as in 2015: RAW 3->9% Ind.users-> 12->6%

6 Organized analysis 5800 jobs 4400 jobs 3000 jobs +47% +32% Year on year increase 9100 jobs +57%

7 Individual analysis 4700 jobs 432 ind.users 4600 jobs 446 ind.users 6900 jobs 465 ind.users -50%+3% Year on year increase Individual analysis +47% +32% Year on year increase organized analysis 3900 jobs 460 ind.users -17% +57%

Grid efficiency 8 +8% +2% Year on year change 86%84%76%82% -4% RAW calibration Muon+calo reco

Status of 2015 data processing Substantial IR-induced distortions in the TPC – Affect both p-p and Pb-Pb data Sophisticated correction algorithms development in the past 6 months Data reconstructed partially (first physics, lower IR runs) – Bulk of reconstruction still pending More details in today’s meeting with referees: – / 9

10 p T > 2 GeV Use TPC track DCA to vertex as a figure of merit for reconstructed kinematics quality Reconstruction with standard settings, old calibration (a la Run1) and with distortions corrections Low-intensity (30Hz IR) LHC15o run : no SC related distortions DCA bias Typical high-IR (5kHz) LHC15o run (245231) DCA bias p T > 2 GeV

Production status  Low IR (<500 Hz) data reprocessing (pass2) with new calibration procedure Finished on May 15 Preliminary QA confirms improvement wrt pass1  High ID ( ~ 5kHz) data first production Started, currently at the stage of reconstruction for calibration (with rescaled default distortions correction to cover full range of distortions) 11

Run2::2015 Run2::2016 Power cut 1.5 PB collected TS1 TS3 7.2 PB collected 60% (4.5 PB) during pp 40% (2.7 PB) during HI (+pp-ref) TS2 SCRUBBING Status of 2016 data taking 12 Tape budget for 2016 is 10PB

New organization of the ALICE Offline Project Common Software Development Common Software Development Detector Software Groups Detector Software Groups Detector Software Teams Detector Software Teams Data Preparation Group Data Preparation Group Grid Operations Grid Operations Grid Software Grid Software Grid Site Support Grid Site Support OperationsDevelopment Barrel Tracking Team Barrel Tracking Team Core Software (Run 1&2 + O2) Core Software (Run 1&2 + O2)

ALICE Summary ALICE Grid is still growing beyond 20% year on year – Adding new sites Austria, USA, Indonesia, Brazil, CBPF HLT – MoU signed with Azerbaijan, expected to join ALICE grid by the end of 2016 Crossed psychological barrier of 100k concurrently running jobs – Demonstrates scalability of ALICE distributed computing – We need only x2 to fulfill the upgrade needs Increased share of raw data processing Healthy decrease of share of individual analysis in favour of organized one resulting on reasonable job efficiency Run 2 data taking progressing well 14 4 in North America 2 in South America 54 in Europe 2 in Africa 11 in Aisa ORNL CBPF Vienna Wuhan Bandung Cibinong 1.5 PB collected Tape budget for 2016 is 10PB

ALICE Summary Substantial IR-induced distortions in the TPC – Affect both p-p and Pb-Pb data – Sophisticated correction algorithms development in the past 6 months – Completed low IR ( ~ 5kHz) production just started New organization has been put in place aiming to streamline data preparation and processing 15 Low-intensity (30Hz IR) LHC15o run : no SC related distortions DCA bias Typical high-IR (5kHz) LHC15o run (245231) DCA bias Common Software Development Common Software Development Detector Software Groups Detector Software Groups Detector Software Teams Detector Software Teams Data Preparation Group Data Preparation Group Grid Operations Grid Operations Grid Software Grid Software Grid Site Support Grid Site Support OperationsDevelopment Barrel Tracking Team Barrel Tracking Team Core Software (Run 1&2 + O2) Core Software (Run 1&2 + O2)