June 23–24, 2016 Hyatt Regency Boston Harbor User Group Meeting and Conference Scheduler/Notifications Rachael LeBlanc, Solution Consultant Katie Thuotte,

Slides:



Advertisements
Similar presentations
Support.ebsco.com EBSCOadmin Reports & Statistics Tutorial.
Advertisements

My EBSCOhost Tutorial Tutorial support.ebsco.com.
2014 Redrock Software Conference ADV – Advanced Preferences and Settings By Jonathan Smith.
Little Used, but Powerful Features with GP Cathy Fregelette, CPA, PMP Practice Manager BroadPoint Technologies September 20, 2012.
GALVESTON COUNTY, TX P-CARD TRAINING GALVESTON COUNTY.
Electronic Workflow using UGARUSS A new DFS system.
Sinewave Computer Services Pvt. Ltd. Page 1 7/2/2015 Taxbase New Features Index.
How to Get The Most Out of Outlook 2003 Michele Schwartzman Division of Customer Support Summer 2006.
Cummins® Inc. Update Manager 3.0 Training Electronic Service Tools.
Cummins® Inc. Update Manager 3.1 Training Electronic Service Tools.
FireRMS SQL Audit, Archiving & Purging Presented by Laura Small FireRMS Quality Assurance.
NSTS For Regulators. Agenda 1.NSTS Release Summary 2.Functionality/Enhancements 3.Scenarios/Demo 2.
NSTS Internal Demo. Agenda 1.NSTS Release Summary 2.Functionality/Enhancements by User Group Licensee Agency Admin 3.Scenarios/Demo 2.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Support.ebsco.com My EBSCOhost Tutorial Tutorial.
ADP Portal: How to Request & Cancel Time Off Into The Future June 2009 All Employees Eligible for Vacation/Sick Benefits Dalton State College Requests.
Learningcomputer.com SQL Server 2008 – Administration, Maintenance and Job Automation.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Diagnostic Pathfinder for Instructors. Diagnostic Pathfinder Local File vs. Database Normal operations Expert operations Admin operations.
Reports and Learning Resources Module 5 1. SLMS Primary Administrator Training Module 5: Reports and Learning Resources 2.
Basic Navigation in Oracle R12 BY: Muhammad Irfan.
2016 Annual Redrock Conference Record Connect Report Success 25 Years of Success Strategies for Your Campus The Ins and Outs to Preparing for a New Semester.
Using the My EBSCOhost Folder Tutorial support.ebsco.com.
Web Content And Customer Relationship Management Solution. Transforming web sites into a customer-focused, revenue generating channel with less stress.
June 23–24, 2016 Hyatt Regency Boston Harbor User Group Meeting and Conference Helpful Tools and Utilities that may surprise you Rachael LeBlanc, Solution.
June 23–24, 2016 Hyatt Regency Boston Harbor 1 User Group Meeting and Conference Letters Katie Thuotte, Technical Support Analyst June 23–24, 2016 | Hyatt.
June 23–24, 2016 Hyatt Regency Boston Harbor User Group Meeting and Conference CAQH and IntelliCred Lynne O’Connor, Sr. Director, Consulting & Advisory.
June 23–24, 2016 Hyatt Regency Boston Harbor User Group Meeting and Conference Special Introduction to the New User Interface/Experience Rachael LeBlanc,
June 23–24, 2016 Hyatt Regency Boston Harbor 1 User Group Meeting and Conference IntelliCred Recredentialing and Reappointments Lynne O’Connor, Sr. Director,
T AGEISS Accounting Manager P. O. Box 6126 Longmont, CO Phone: Fax:
How to Schedule Usage Reports in EBSCOadmin
HR Operations-2.
Melissa Wagner & Jaime Patel
Project Management: Messages
GRBmobile Deposit for Business User Guide
Software Application Overview
Recruiter 2.0 Overview May 1, 2012.
Employee Self Service Lite Version
Adastra v3 Reporting & National Quality Requirements
Faculty/advisor Portal training guide
SubAnywhere: Setup and Configuration
Presented by: Aubrena Pickens, LIS Specialist
Welcome to all Salesforce Enthusiasts Once Again
Materials Engineering Product Data Management (ePDM)
PE Determiner Portal Registration and Log on Workshop
Viewing Admissions Data
5.8 Presentation.
Active Orders Supplier Administrator Training Getting Started Activities This training presentation describes the Getting Started activities that will.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Welcome to the LMS Quick Manager Guide.
10 Steps to Prepare for a New Semester
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
PE Determiner Portal Registration and Log on Workshop
Adding and Editing Users
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Data Upload & Management
To the ETS – Encumbrance Online Training Course
How to run and format reports for your Local Board of Health
Welcome to the LMS Quick Manager Guide.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Overview of Contract Association Batch Upload
Steps in the TDES Evaluation Process
Creating new GobiAlerts
To the ETS – Encumbrance Online Training Course
PCW-09 Vision: Information Center Approval System
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Data Quality 2 (DQ2) & Staff Reporting Webinar
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Module 1.3 Introduction to the HFR Administration Module
Presentation transcript:

June 23–24, 2016 Hyatt Regency Boston Harbor User Group Meeting and Conference Scheduler/Notifications Rachael LeBlanc, Solution Consultant Katie Thuotte, Technical Support Analyst June 23–24, 2016 | Hyatt Regency Boston Harbor

June 23–24, 2016 Hyatt Regency Boston Harbor The Scheduler Module can reduce the need to run many manual processes by allowing you to set particular program functions to run on a schedule defined by YOU! Imports Exports Reports Web Crawlers Other online Web Verifications Action Item Queries Scheduler

June 23–24, 2016 Hyatt Regency Boston Harbor The Scheduler Module works in much the same way as the Auto Import and Export did in previous versions in which you set particular program functions to run on a user defined schedule. This can be daily, weekly monthly, or every 10 minutes depending on your need. There are several components to a scheduled function. Run Frequency Schedule Type and settings Additional settings Run Frequency The frequency is how often a particular function is run. This is controlled by two values: The Interval Unit and the Multiplier. Interval Units include minutes, days, weeks, and months, and the Interval is the multiplier of the unit. So for a quarterly export, the Unit would be Month and the Interval would be 3; For a report run every two weeks the Unit would be Week and the interval 2. Scheduler – How does it work?

June 23–24, 2016 Hyatt Regency Boston Harbor Exports set up in the system can be scheduled. For these, the bulk of the functionality is based on the export setup. For this Schedule type, necessary data is the Export to be run, and the file save path for the export file. Schedule Types: Export

June 23–24, 2016 Hyatt Regency Boston Harbor Imports in the system can be scheduled. Again, the functionality is dependent primarily on the Import setup. Necessary Schedule data is the Import or the Project. Schedule Types: Import

June 23–24, 2016 Hyatt Regency Boston Harbor The Action Items Query is typically run once a day at the first login into the system. It can also be run manually from the System menu in the program. These functions include: Expiring Credentials Verification Creation. Expiring Appointments Verification Creation. Resetting of Verifications that need reprinting. Workflow Step Processing (Workflow Module). Processing (Contracts Module). Notification Alerts processing. These functions need only the interval settings. Schedule Types: AIQ (Action Items Query)

June 23–24, 2016 Hyatt Regency Boston Harbor Verification functions like Web Crawlers and NPDB queries, can be run off hours to reduce manual processing. Schedule Types: Verification Functions

June 23–24, 2016 Hyatt Regency Boston Harbor For almost any Standard or IntelliReport, the generated SQL query can be copied to a Scheduled Item to produce the report as needed. The results can be saved in several formats including Excel and XML. Schedule Types: Reports

June 23–24, 2016 Hyatt Regency Boston Harbor Run the report as normal. From the results window click the View Syntax. This is the SQL query used to generate the data. Copy the syntax to the clipboard and paste into the Retrieve Query field of the Schedule item. Copying Syntax for the Scheduler: Standard Reports

June 23–24, 2016 Hyatt Regency Boston Harbor Run the report as normal from the Run Report tab. Click the Show SQL button to view the query. Click the Save SQL button to copy the syntax to the clipboard, and paste into the Retrieve Query field of the Schedule item. Copying Syntax for the Scheduler: IntelliReport

June 23–24, 2016 Hyatt Regency Boston Harbor See when/if items were successfully sent Error codes View Log Reports

June 23–24, 2016 Hyatt Regency Boston Harbor Notifications are user defined Alerts automatically generated by the program for: Expiring records including Expiring Credentials, Expiring Appointments, and OPPE/FPPE period ends. Scheduled notices for Birthdays and Meetings Notification when a new practitioner has been entered. Notifications

June 23–24, 2016 Hyatt Regency Boston Harbor Each Notification will have one or more alert steps defined as to when then alert is sent and to whom it is sent. This may be as simple as sending a single to the Credentialing person at the expiration of a license, to a multi-level escalated process. For example: For an Expiring License record, alerts need to be sent at four time points: 90 days before expiration to the Practitioner. 60 days before expiration to the Credentialing person and supervisor. 1 Day before expiration date to the Credentialing person, supervisor, and the practitioner 14 days after expiration to the department head. Each of these rules can be setup as an alert step having its own parameters for when, to whom, and a specified template. Defining Notifications

June 23–24, 2016 Hyatt Regency Boston Harbor After scheduling a report to run and be saved somewhere you can have the notification module “pick it up” and send it to someone. In this example, the notification will run once a week (every 7 days) It’s scooping up my saved/scheduled report and sending it to the I selected Using the Scheduler with Notification Module

June 23–24, 2016 Hyatt Regency Boston Harbor Audit Alert Logs View the processed alert records directly from the Alert Audit button in Notification Setup or from the System Utilities. Alert records automatically pass through different Statuses.  Active records have been processed, and have remaining steps until completion.  Completed means all steps have been processed for that alert record.  History means that the alert record is no longer required. This would take place, for example, when the expiration date for a license data record has been updated.