Identification of Waste WASTE Input (Resources) Energy People Capital Water Materials Tools Output Products Services WASTE Transformation.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
Yellow Belt Training Kaizen Concepts
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
Just-In-Time and Lean Systems
Principles for Implementing Lean Manufacturing Lecture 2: Overview 1.Discussion of Joe’s Garage 2.Lean Terminology in Joe’s Garage 3.Types of Waste; Eliminating.
Operations Management Just-in-Time Systems Supplement 12
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
The Seven Forms of Waste
1 Value Stream Mapping Sustainable Operations Professor Mellie Pullman.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Chapter 7, Lean Thinking and Lean Systems
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes.
Lean and Clean—Friend or Foe? Great Lakes Regional Pollution Prevention Roundtable.
The Concept of Waste ”Understanding & identifying waste is the
Toyota Production System (TPS) MGMT- E5060 Operations Management.
LeanSigma ® Facilitator Training Module 5 – Waste.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Value Analysis/ Flow Analysis
Lean Production - Objectives
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
Lean Basics Dewey Warden.
JIT and Lean Operations
Value adding Optimize Necessary but not value adding Minimize Non value adding = WASTE 5% 35% 60% Primary focus of “traditional” efficiency improvements.
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
LeanSigma ® Fundamentals Module 4 – Specify Value.
Philosophy and Key Concepts
Lean Production (MUDA)
Just-in-Time and Lean Systems
(And How to Tame Them) The Seven Deadly Wastes (And How to Tame Them)
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
7 Types of Waste –C –Correction –O –Overproduction –M –Movement of Material & Information –W –Waiting –I –Inventory –P –Processing Lean Principle: Lean.
1 Slides used in class may be different from slides in student pack Chapter 12 Just-in-Time and Lean Systems  JIT Defined  The Japanese Approach to Productivity.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
13-1 Learning Objectives  Explain what is meant by the term lean operations system.  List each of the goals of JIT and explain its importance.  List.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Kaizen Eventing: The process of observation and the elimination of waste in a process.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
FMS 100 Series FBP-FMS284A 3 M’s and 9 Wastes.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
Cost of Poor Quality Cost of Poor Quality.
Introduction to Motion and Time Study
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
An Introduction to Lean
Mel Wendell – Mountain Pointe High School
Slide 16.1 Just-In-Time & Waste Reduction. Slide 14.2 What is Just-in-Time?   Management philosophy of continuous and forced problem solving  are needed.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
COMPUTER INTEGRATED MANUFACTURING
Lean Manufacturing Basic Overview XYZ Company.
Inputs and Outputs to Aggregate Production Planning
Pricing your Products to be Profitable
Chapter 2 Office and knowledge work
Total Productive Maintenance and Quick Changeover
Lean and Quality Management Basics of Lean Management
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
Chapter 12 Lean Production. Chapter 12 Lean Production.
1 LEAN Safety. 2 Lean safety is a systematic approach to identifying and controlling the waste in processes/activities which could cause accidents or.
Introduction to Lean and Lean Training
Inputs and Outputs to APP
Presentation transcript:

Identification of Waste WASTE Input (Resources) Energy People Capital Water Materials Tools Output Products Services WASTE Transformation

Purpose of Waste Educate supplier of the evils of waste – What – Where – Why – Steps to reduce and/or eliminate Show improvement potential that exists Improve the process’s value added content

WASTE Identification of Waste Input (Resources) People Capital Tools Energy Materials Output Products Services WASTE Transformation

Defining Waste Webster:“To consume carelessly” “Squander” “Fail to take advantage” “Uncultivated area” “Junk” “Worthless residue” “Lose energy” “Grow weaker”

Definition of Waste Anything that doesn’t add value to the process Anything that doesn’t help create conformance to the customer’s specifications Anything your customer would be unwilling to pay you to do

Identification and elimination of waste is the central focus of a lean system. It is dependent on the understanding and involvement of all employees. Successful implementation requires all employees be trained to identify and eliminate waste from their work areas. Understanding Waste

Waste exists in all work.... and at all levels in the organization Understanding Waste

Waste: Anything other than the minimum resources Equipment and tooling Direct and indirect labor Material Floor space Energy Absolutely necessary to add value to the product !!

Identification of Waste Types of Waste Inventory Overproduction Correction Material & Information Movement Processing Waiting Motion

WASTE of Inventory Definition:Any supply in excess of customer requirements necessary to produce goods or services just-in-time Root Causes Product complexity Incapable processes Unleveled scheduling Poor market forecast Unbalanced workload Unreliable supplier shipments Inadequate measurement Misunderstood communications Reward system Symptoms Complex tracking systems Extra storage & handling Extra rework / hidden problems Paperwork / documents Stagnated information flow High disposal costs Obsolete material / landfill In-process packaging High utility costs

Your Company Inventory Hides Problems !! Inventory Hides Waste !! Water = Inventory Rocks = Problems (Opportunities) Poor Layout Variation Equipment Downtime Inventory Level Large Lot Sizes Supplier Quality Long Changeover

Why We Want To Reduce Inventory 1) Interest expense associated with working capital: Requirements to produce goods: -People, materials, facility, know-how, customers -An organization + working capital Working Capital = Cash + Inventory + Accts. Receivable - Accts. Payable -Collect faster -Defer payments -Reduce inventory Benefits of reducing inventory in working capital: -Save interest expense -Free up cash for investment 2) The greater the inventory, the greater the handling: Forklifts, bins, containers, indirect labor to move/store inventory Administrative effort and cost to control the inventory (losses, locating and counting)

Why We Want To Reduce Inventory 3) Inventory deteriorates, causing more scrap & rework: Metal rusts Lubricants dry out Materials accumulate dirt 4) Inventory takes up space: Adds cost to heat, light, and insurance Facilities should be used for Value Added activities (i.e., production rather than warehousing) 5) Guiding principles of “lean” manufacturing: Elimination of buffers makes problems surface and forces organization to address and resolve problems. Leads to need for: -Pull systems -Quick die setup -Manufacturing organized by product, rather than process -Good balancing -Multifunctional workers -Preventative maintenance -etc.

Why We Want To Reduce Inventory 6) Reduce scrap / rework. When defect is detected, the entire inventory has to be scrapped, reworked, and/or sorted.

WASTE of Overproduction Definition:Producing more than needed Producing faster than needed Root Causes Just-in-case logic Misuse of automation Long process set-up Unleveled scheduling Unbalanced workload Over engineered equipment/capability Redundant inspections Lack of reuse & recycling Symptoms Excessive raw materials Extra inventory Unnecessary work Excessive floorspace utilized Unbalanced material flow Backups between departments Complex information management Disposal charges Extra waste handling & treatment High utility costs

WASTE of Correction Definition:Inspection and/or repair of a product or service Root Causes Weak process control Questionable quality Lack of error proofing Unbalanced inventory level Deficient planned maintenance Poor product design Customer needs not understood Improper handling Poorly managed waste streams Inadequate training Symptoms Rework, repairs & scrap Added inventory costs Customer returns Loss of customer confidence Loss of business Missed shipments / deliveries Hazardous waste generation Frequent spill cleanups High disposal costs High utility cost WHITE OUT

WASTE of Material & Information Movement Definition:Any material or information movement. Root Causes Mislocated materials Unleveled scheduling Unfavorable facility layout Redundant inspections Poor workplace organization & housekeeping Poorly managed waste streams Unbalanced processes Supply chain management Symptoms Extra handling Extra handling equipment Extra inventory Large storage areas Over-staffing Reduced quality Extra Paperwork Extra hand-offs Transport of disposal Excessive energy consumption Excessive emissions OVERNIGHT DELIVERY

WASTE of Processing Definition:Effort which adds no value to the product or service from the customer’s perspective. Root Causes Product changes without process changes Just-in-case logic Lack of communication Redundant approvals Extra copies, excess information Undefined customer requirements “Stop-gap” measures that become part of the process Lack of reuse / recycling Symptoms Unnecessary work Extra equipment Longer lead time Reduced productivity Extra material movement Sorting, testing, inspection Inappropriate use of resources Excess energy consumption Processing by-products

WASTE of Waiting Definition:Idle time created when people wait for machines, people wait for people, machines wait for people, and machines waiting on machines. Root Causes Unbalanced work load Unplanned maintenance Long process set-up times Misuse of automation Quality problems Unleveled scheduling Ineffective layout Specialization Symptoms Under-utilization of resources Reduced productivity Increase in investment Idle equipment Large waiting / storage rooms Equipment running, not producing Unnecessary testing

WASTE of Motion Definition:Any movement of people or machines. Root Causes Poor ergonomics / layout Machine / process design Inconsistent work methods Poor workplace organization & housekeeping Extra “busy” movements while waiting Symptoms Reduced productivity Large reach / walk distances Longer lead times Excess handling Reduced quality People / machines waiting High energy cost Inappropriate use of resources

Resource Conservation and Pollution Prevention

Key Point Observations Overproduction (Too much, too fast) Correction (Rework, inspect) Material Movement (Too much, too far) Processing (Adds no value) Inventory (Excess stock, banks ) Waiting (Idle time) Motion (Inefficient movement) Unevenness (Overburden current methods) Observation Worksheet: Identification of Waste

Key Point Resource Conservation and Pollution Prevention Energy (Excess usage) Water (Excess usage) Transportation (Fuel use, emissions) Hazardous Waste (Toxicity, cost) Non-Hazardous Waste (Inefficiency, cost) Product Design (Cost, inefficiency, toxicity) Environmental Mgmt. Practices (Excess usage, waste) Other Observation Worksheet: Identification of Waste