802.1 – Activities & status Tony Jeffree, 802.1 WG Chair 24 th July 2006.

Slides:



Advertisements
Similar presentations
Submission, Slide 1. Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG-PSC Closing Report] Date.
Advertisements

802.1 Plenary - 11/2004 Agenda. Topics n Administrative stuff n IEEE Patent Policy n Exec stuff n Interim meetings n Task group stuff.
802.1 Closing Plenary - 11/2004 Agenda. Topics n Administrative stuff n IEEE Patent Policy n Interim meetings n Liaison stuff n Sanity check n New work…?!!
802.1 Closing Plenary - 07/2005 Agenda. Topics n Administrative stuff n IEEE Patent Policy n Interim meetings n Motions.
Geneva, Switzerland, 13 July 2013 IEEE 1588 revision Silvana Rodrigues, Director of System Engineering, IDT Joint IEEE-SA and.
802.1 – Activities & status Tony Jeffree, WG Chair 22 March 2008.
1 November 2005 ResE Study Group Residential Ethernet Study Group Closing Report Vancouver, BC, Canada November 16, 2005 Michael Johas Teener*, RESG Chair.
November 2004 Dorothy Stanley (Agere Systems) IEEE IETF Liaison Report November 2004 Dorothy Stanley – Agere Systems IEEE Liaison – IETF.
Preliminary Interworking Agenda Very Preliminary – This agenda is *very* preliminary and subject to change. Some agenda items may take more time than anticipated.
802.1 – Activities & status Tony Jeffree, WG Chair 16 July 2007.
IEEE CSMA/CD Working Group Status as of Mar. 15, 2002 (Close of St. Louis Plenary) Major Activities/Approved Projects: P802.3ae 10 Gigabit Ethernet.
July 2014 doc.: IEEE < July 2014>
July Session Supplementary Material
OmniRAN EC SG Proposals towards IEEE 802.1
Review of March 2013 Proposed Pars
Status Report November 2007
Submission Title: [TG3 BSIG PM Pitch 16Jun00]
Submission Title: [TG3 Opening Report 18Sep00]
Jan Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, January 2003 Date Submitted:
Sub-1 GHz Study Group Closing Report Sept 2018
Submission Title: TG4r Sept 2014 Closing Report
doc.: IEEE /468r0 November 11-15, 2002 Hyatt Regency Kauai
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Submission Title: f Task Group Closing Report for Okinawa, Japan
July 2014 doc.: IEEE /4/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Closing IEEE 802 EC July 2018, San Diego
July 2002 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, July 2002 Date Submitted:
Tony Jeffree, WG Chair 6th July 2006
IEEE MEDIA INDEPENDENT HANDOVER
Submission Title: [WG-TG3 closing Report May02]
IEC Maintenance Committee Report
September 2002 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, September 2002 Date.
Task Group Process Overview
Steve Haddock Interworking chair, IEEE
WG Technical Editor’s Report
Supplementary Plenary Information - November 2009
July 2014 doc.: IEEE /15/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
doc.: IEEE <doc#>
<month year> doc.: IEEE < e> <July 2018>
<month year> doc.: IEEE < e> <September 2018>
July 2014 doc.: IEEE /24/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
802.1 consent agenda items for LMSC Closing Plenary
802.1 consent agenda items for LMSC Closing Plenary
802.1 consent agenda items for LMSC Closing Plenary
<month year> doc.: IEEE < e> <September 2018
May 2002 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, May 2002 Date Submitted:
July 2014 doc.: IEEE /7/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Task Group Process Overview
July 2014 doc.: IEEE /18/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Closing Report Plenary Meeting Dallas, TX November 10-14, 2008
78th Session of the IEEE WG
802.1 Motions for EC consent agenda, including supporting material
802.1 Motions & supporting material
Other Working Group Activities
Submission Title: [WG-TG3 Opening Report Nov02]
November Plenary Opening Report
Submission Title: [TG3 Opening Report 17Sept01]
802.1 Thurs. Plenary - Albuquerque 9 Mar 2000
July 2014 doc.: IEEE /29/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
July 2014 doc.: IEEE /26/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Roger Marks (Huawei) capable 18 July 2019
July 2014 doc.: IEEE /21/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
802.1 consent agenda items for LMSC Closing Plenary
802.1 Motions for EC consent agenda, including supporting material
802.1 Motions for EC consent agenda, including supporting material
Submission Title: TG9ma Closing Report for July Meeting
802.1 Motions for EC consent agenda, including supporting material
May 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG5 Motions at Mid-Week Plenary] Date Submitted:
802.1 consent agenda items for LMSC Closing Plenary
Presentation transcript:

802.1 – Activities & status Tony Jeffree, WG Chair 24 th July 2006

Areas of work n 802 Architecture and interworking between 802 technologies –Cross-802 Architecture group –“Technical Plenary” if needed n MAC Bridging –“Traditional” (802.1D) bridging –VLAN (802.1Q) bridging –Provider bridging –AV bridging –Congestion management n Security –Secure frame transmission –Key management n LAN management –Discovery mechanisms

Officers n Chair: Tony Jeffree n Vice Chair: Paul Congdon n Recording Secretary: Michael Wright n Interworking and Link Sec TG Chair: Mick Seaman n AV Bridging TG Chair: Michael Johas Teener n CM Study Group Chair: Pat Thaler n Link Sec TG Secretary: Allyn Romanow n Maintenance of exploder: Hal Keen n Maintenance of website: John Messenger –Website:

Status of current projects - (1) n The following draft PARs were forwarded to NesCom this week: –P802.1at – Stream Reservation Protocol –P802.1au – Congestion Notification –P802.1H Revision – MAC Bridging of Ethernet – up for 5-year cycle action n 5-year cycle action is due for Standard 802 Overview and Architecture; this will undergo a reaffirmation Sponsor ballot.

Status of current projects - (2) n MAC Service revision (P802.1ac) –Initial input generated based on ISO/IEC JTC1 standard plus ISS, E-ISS from 802.1D and 802.1Q –Second draft (D0.1) generated for circulation to the WG n P802.1af – Key Agreement –Current draft is D0.5 –Under TG balloting – ballot resolution completed this week n P802.1ag Connectivity Fault Management –Current draft is D6.1 –First WG ballot completed –Will be submitted for a further WG ballot

Status of current projects - (3) n P802.1ah – Provider Backbone Bridges –Proposed amendment to 802.1Q to provide further scaling characteristics in conjunction with P802.1ad in large provider networks –Current draft is D2.2 –Will transition to WG ballot before November n P802.1aj – Two-port MAC Relay –Proposed amendment to 802.1Q to define a relay device, commonly known as a “media converter”, that will assist the integration of 802 LAN technologies with emulated LAN services in use in the provider networking space. –Current draft is 1.4 –Second TG ballot conducted; ballot resolution completed –Further TG balloting in September timeframe n P802.1ak – Multiple Registration Protocol –Proposed amendment to 802.1Q to improve the performance/scalability of GARP-based applications (GVRP, GMRP) in provider networks –WG balloting completed –Current draft is D6 –Submitted for Sponsor ballot –Comment resolution will be at our September interim meeting

Status of current projects - (4) n P802.1ap - Management Information Base (MIB) definitions for VLAN Bridges –PAR approved, outline draft generated draft n P802.1aq – Shortest Path Bridging –Current draft is D0.4 –First Task group ballot – comment resolution completed n P802.1AR – Secure Device Identity –Current draft is D0.5 –Under Task group balloting – ballot resolution completed n PAR for P802.1AS – Timing and Synchronization in LANs – Approved by NesCom

Next Interim meeting n 26 th -29 th September 2006 – York, UK