G. Pugliese Task 13.4.6 Preparation for large series production: production protocols of optimised RPC components for easy technology dissemination G.

Slides:



Advertisements
Similar presentations
Development of high rate RPCs Lei Xia Argonne National Laboratory.
Advertisements

DFNA-Ilie Cruceru PERSPECTIVES FOR A POSITRON EMISSION TOMOGRAPHY (PET) PLANT BASED ON RESISITIVE PLATE COUNTER (RPC) Ilie Cruceru, Mihai Petrovici, Florin.
Status of the ATLAS MM project
Status of OPERA RPC production. A. Garfagnini Opera collaboration meeting Nagoya, 12 march 2002  RPC production at GT;  Schedule for OPERA in 2002; 
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Results from development of Glass RPCs for INO detector
PHENIX RPC in China Li Ye Shouyang Hu Xiaomei LI China Institute of Atomic Energy
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
RPC Development in Beijing and Potential for NO A Tianchi Zhao University of Washington May 16, 2005.
RPC R&D status in Bucharest (JRA12-I3HP) Mihai Petrovici - CBM-Meeting, GSI, March 1,2006 Short history SMSMGRPC – Glaverbel Glass Prototype –Construction.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
CMS-GRPC status Imad Laktineh for the GRPC-CMS groups.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
CBM -Russia meeting, ITEP, 5 November 2004 DEVELOPMENT OF LOW RESISTIVE GLASS FOR HIGH RATE RPC F.Guber, INR, Moscow C B M.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
Update on DHCAL and RPC progress Lei Xia ANL - HEP.
Tests of RPCs (Resistive Plate Chambers) for the ARGO experiment at YBJ G. Aielli¹, P.Camarri¹, R. Cardarelli¹, M. Civardi², L. Di Stante¹, B. Liberti¹,
ITEP participation to the CBM TOF project ITEP ALICE - TOF group CBM – Russia meeting at ITEP, Nov 5 th, 2004.
C.Gustavino, june 4th 2004, Hamburg XPC Status report VETO status report Glass RPC R&D Outline:
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
CMS GRPC detector& cassette I. laktineh. Concepts Two concepts of RE1/1 detectors were developed : 1- One based on gluing glass plates to have large RPC.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items.
Academia meets Industry: RPC and TGC Vienna University of Technology March 25 th 2014 By R. Santonico.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
WP 13 Task Develop a complete system of large size RPC (single- gap/multi-gap) with timing capability better than few hundreds ps. This includes.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
SDHCAL-GRPC Review I.LAKTINEH For the SDHCAL-GRPC groups.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
Activity of Koreans in ALICE Collaboration Do-Won Kim
14.4. Readout systems for innovative calorimeters
Imad Laktineh IPN-Lyon On behalf of the CMS muon group
P. Paolucci G. Pugliese M.Tytgat
A particle detector for educational purposes
The principle of operation of a micromegas chamber
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Results achieved so far to improve the RPC rate capability
Production ad Quality control of RPCs for the CMS muon barrel system
Enrique Calvo Alamillo DAEGU
Atlas: Upgrade Phase I Massimo Della Pietra.
A proposal to equip the high eta muon stations with High Rate GRPC
RPC built a new plastic (peek doped with CB)
RPC Production at GT A Mass scale RPC Production
Gaseous detectors Task Resistive anode Micromegas
LABORATORI NAZIONALI DI FRASCATI
GRPC activity for EuDHCAL in IHEP-Protvino
Multigap Resistive Plate Chambers (MRPC)
India-based Neutrino Observatory (INO)
Semi-Digital Hadronic CALorimeter
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
CLIC-ILC BDS & MDI work.
ATLAS Muon Spectrometer and
CMS Goal of the experiment
BESIII RPC Detector Jiawen Zhang
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
Resistive Plate Chambers performance with Cosmic Rays
Development of Resistive Plate Chamber for charge particle detection
Limited Streamer Tube Project Summary
SHLC INFN Road Map Working Group 11/01/2006
Gaseous detectors at the LHC experiments: GEM technology (lesson #3)
Presentation transcript:

G. Pugliese Task Preparation for large series production: production protocols of optimised RPC components for easy technology dissemination G. Pugliese

Past experience 2 Scientific applications: RPCs used in most of LHC experiments as well as in Cosmic Rays (Argo), underground (Opera) experiments and for time of flight measurements (Alice, Hades, Fopi). Scientific applications: RPCs used in most of LHC experiments as well as in Cosmic Rays (Argo), underground (Opera) experiments and for time of flight measurements (Alice, Hades, Fopi). The joint effort from research and industry was crucial in order to build up these large area detectors. Two examples: 1.Resistive electrodes: there was no industrial material qualified with the needed resistivity. A lot of work done to adapt the standard production to our needs. 2.Gas mixer: the good gas candidate for the standard RPC gas mixture was found in the refrigeration industry (first the CF3Br then the C2H2F4). Now we have to replace C2H2F4 and the Tetra-fluoropropene seams the new gas industrially candidate.

G. Pugliese What next 3 OtherApplications: Muon tomography for inspection systems (trucks, containers, trains) for heavy materials (guns, fissile materials) PET Volcano radiography with cosmic-ray muons Scientific Applications HL – LHC ILC CBM Each application implies specific requirements However they have in common: 1.Development of production protocols of optimised RPC components for an easy construction 2.Quality controls and assurance needed to guarantee high quality and stability of the production.

G. Pugliese Technological activity (1) 4 1.Production protocols of optimized RPC components for easy technology dissemination:  Standardized production of each components o Electrode: the Bakelite and glass (or others) production should be standardized keeping high level of quality and with technical specification satisfying the specifiations (see value resistivity).  Detector construction simplification: o New coating  Bari – Roma o Spacers gluing  Bari – Roma o Improved Gas distribution  LYON o Microstrip  LIP  Develop of engineering design and protocols suitable for standards large-scale production  LYON - Mun

G. Pugliese Preparation for the construction of large GRPC (>2 m2) for ILC New gas distribution system (2 inlets and one outlet) Control of homogeneity distribution using the radioactive Krypton 83m New Design of a robust way to maintain the electronics on the GRPC in a large cassette GRPC example (Lyon)

G. Pugliese For CMS: Construction of large GRPC using small pieces of Chinese glass By gluing the glass plates together Or by mechanical fixation with gas- tight cassette. GRPC example (Lyon)

G. Pugliese 480 strips pitch 2.54 mm600 strips pitch 2.54 mm Microstrip Boards example (LIP) Made in the past by machining (up to 1.2mx1.5m). Another solution build a machine for mechanically cutting strips.

G. Pugliese Technological activity (2) 8 1.Quality controls and assurance to guarantee high quality of the production:  In the mass production for industrial applications QC & QA are crucial to guarantee uniformity on each detectors components.  The definition and developing of common tools hardware and software for QC & QA procedures needed.

G. Pugliese Partners 9 The prototypes production for scientific application will be the test bench for both production protocols optimization and QC & QA definition. INFN Tor Vergata Gap and read-out Lyon Large Glass RPC LIP microstrip boards INFN – Bari Prototypes Production Munich Mechanical structure

G. Pugliese Planning of the first year 10 Each partner will propose technical solutions to facilitate the detector construction first in view of the large production as required by future high precision HEP Experiments and for future applications. 1.In contacts with industry: common tools to facilitate the detector construction will be studied. Protocol for a QC/QA production will be developments 2.Technical solutions will be tested on small scale.

G. Pugliese 4-years planning 11 Official milestones and deliverables: Production protocols of optimised RPC components (specification of the protocols for production procedures, quality assessment and quality control in view of large-scale production) -- M36  Year 1: identification of technologies  Year 2: tests of candidate technologies  Year 3: consolidation and final test of the elected technology  Year 4: production of report

G. Pugliese Complementary financial resources 12  RPC R&D CMS - ATLAS  Link from other Wp13..

G. Pugliese Spare 13

G. Pugliese 1 m2 GRPC with embedded readout electronics and its cassette for the SDHCAL prototype(ILC)