EPS HEP 2007 Manchester -- Thilo Pauly -- 28 July 2007 11 The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.

Slides:



Advertisements
Similar presentations

Advertisements

Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
Inefficiencies in the feet region 40 GeV muons selection efficiency   Barrel – End Cap transition 10th International Conference on Advanced Technology.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
8th Workshop on Electronics for LHC Experiment, Colmar, France, 10 Sep R.Ichimiya, ATLAS Japan 1 Sector Logic Implementation for the ATLAS Endcap.
The ATLAS B physics trigger
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
The ATLAS trigger Ricardo Gonçalo Royal Holloway University of London.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The digitization procedure occurs separately for each Muon technology, MDT, CSC, RPC and TGC. Here the main steps of each MuonHits to Muon Digits conversion.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
CF 8/June/2003 ATLAS muon week in Gallipoli 1 The 1 st Beam Test of TGC electronics at H8 in May/June ‘03 Chikara Fukunaga on behalf of TGC electronics.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
L1Calo Intro Cambridge Group, Dec 2008 Norman Gee.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Il Trigger di Alto Livello di CMS N. Amapane – CERN Workshop su Monte Carlo, la Fisica e le simulazioni a LHC Frascati, 25 Ottobre 2006.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
Pierluigi Paolucci - INFN of Napoli 1 Official Muon talks at 2006 Conferences 1.10th Topical Seminar on Innovative Particle and Radiation Detectors – 1-5.
The ATLAS Trigger: High-Level Trigger Commissioning and Operation During Early Data Taking Ricardo Gonçalo, Royal Holloway University of London On behalf.
Muon Trigger Slice Report Sergio Grancagnolo for the Muon Trigger group INFN-University of Lecce CERN Jan 23, 2007.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Artemis School On Calibration and Performance of ATLAS Detectors Jörg Stelzer / David Berge.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Design Studies of the ATLAS Muon Level-1 Trigger based on the MDT Detector for the LHC Upgrade O.Sasaki, Y.Suzuki, K.Nagano, M.Ishino, M.Ikeno (KEK), K.Bendtz,
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
First CMS Results with LHC Beam
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern Takuya SUGIMOTO (Nagoya University) On behalf of TGC Group.
Status of the ATLAS first-level Central Trigger and the Muon Barrel Trigger and First Results from Cosmic-Ray Data David Berge (CERN-PH) for the ATLAS.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
TRIGGERING IN THE ATLAS EXPERIMENT Thomas Schörner-Sadenius UHH Teilchenphysik II 4. November 2005.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
K + → p + nn The NA62 liquid krypton electromagnetic calorimeter Level 0 trigger V. Bonaiuto (a), A. Fucci (b), G. Paoluzzi (b), A. Salamon (b), G. Salina.
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Integration and alignment of ATLAS SCT
ATLAS L1Calo Phase2 Upgrade
Kevin Burkett Harvard University June 12, 2001
The ATLAS Level-1 Central Trigger
ATLAS Muon Spectrometer and
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
The First-Level Trigger of ATLAS
ATLAS Silicon Tracker commissioning
TDAQ commissioning and status Stephen Hillier, on behalf of TDAQ
Project Presentations August 5th, 2004
Commissioning of the ALICE-PHOS trigger
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
LHCb Trigger, Online and related Electronics
Mini Tower Preliminary Results
11th Pisa meeting on advanced detectors
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
The CMS Tracking Readout and Front End Driver Testing
Plans for the 2004 CSC Beam Test
Presentation transcript:

EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo Pauly (CERN) on behalf of the ATLAS Level-1 Trigger Collaboration

EPS HEP 2007 Manchester -- Thilo Pauly July ATLAS Trigger and DAQ System 1)Level 1 decision based on data from calorimeters and muon trigger chambers; synchronous at 40 MHz 2)Level 2 uses Regions of Interest identified by Level-1 (< 10% of full event) with full granularity from all detectors 3)Event Filter has access to full event and can perform more refined event reconstruction Software Hardware Reduce rate from 40 MHz to 200Hz while retaining the rare, interesting events

EPS HEP 2007 Manchester -- Thilo Pauly July ATLAS Level-1 Trigger System Trigger path Pre-processors Cluster Processor Jet/Energy Processor End-cap Muon Trigger (TGC) Barrel Muon Trigger (RPC) Muon Interface (MUCTPI) Sub-detector Front-Ends/Read-out Muon Trigger DetectorsCalorimeter Detectors Central Trigger Processor (CTP) Level-2 Trigger LTP TTCBusy LTP TTCBusy Trigger path Regions of Interest Readout path

EPS HEP 2007 Manchester -- Thilo Pauly July In Situ Cosmic-Ray Commissioning Recently (June 2007): combined cosmic-ray run with a large slice of ATLAS in situ Aim: Exercising full data recording chain, from detector to disk Level-1 triggers: –Barrel muon trigger –Endcap muon trigger –Temporary hadron calorimeter trigger Readout: –Silicon strips (noise) –Transition radiation tracker –Em calorimeter (Liquid Argon) –Hadronic calorimeter (Tiles) –Muon precision chambers (MDT) –Level-1 Barrel muon trigger (RPC) –Level-1 Endcap muon trigger (TGC) –Level-1 Calorimeter trigger –Level-1 Central trigger Level-2: –Muon algorithm from muon regions of interest (no rejection yet)

EPS HEP 2007 Manchester -- Thilo Pauly July ATLAS Level-1 Muon Trigger Dedicated muon chambers with good timing resolution –Barrel: Resistive Plate Chambers (RPC) –Endcaps: Thin Gap Chambers (TGCs) Local track finding on-detector, candidate multiplicity calculation off-detector Two low-momentum (6-9 GeV), one high- momentum (9-35 GeV) layer Looking for coincidences in chamber layers within programmable roads (road width related to momentum) 6 programmable coincidence windows determine momentum threshold (using B-field deflection)

EPS HEP 2007 Manchester -- Thilo Pauly July Level-1 Barrel Muon Trigger: Commissioning Most chambers installed and being commissioned Off-detector electronics in production –demonstrators used for commissioning Cosmic ray commissioning in June 2007: top sector provided cosmic ray trigger to Muon Interface and Central Trigger Processor through final trigger chain –rate: 120 Hz First time chambers are operated with final set-up: gas system, final cabling and power system, slow control Measured trigger latency: 1490ns from chamber to CTP output, as expected Synchronization tests between layers have been successfully performed

EPS HEP 2007 Manchester -- Thilo Pauly July Level-1 Endcap Muon Trigger: Commissioning Chamber installation in full swing Final on-detector electronics being installed and commissioned Off-detector electronics being installed June 2007: Endcap muon trigger sector (inner layer) provided cosmic ray triggers (1-station coincidence) –sent trigger to Muon Interface and Central Trigger Processor through final trigger chain –Trigger rate: few Hz Measured trigger latency: 1550ns from chamber signal to output of the Central Trigger Processor, as expected Endcap muon trigger was integrated into DAQ system via final readout

EPS HEP 2007 Manchester -- Thilo Pauly July Setup of the Level-1 trigger during commissioning with cosmic rays Muon interface (MUCTPI): –receives muon trigger data from up to 208 muon trigger sectors –handles overlaps and sums muon multiplicities –sends muon multiplicities to Central Trigger Processor –crate with close to final boards installed Trigger inputs: –Muon interface (MUCTPI): Barrel (RPC): 120Hz Endcap (TGC): few Hz –Temp. hadron calorimeter cosmics (sub-Hz) DAQ Hadron calorimeter cosmic trigger Sub- detector DAQ Endcap muonBarrel muon Trigger path Readout path CTP MUCTPI Level-2

EPS HEP 2007 Manchester -- Thilo Pauly July ATLAS Level-1 Central Trigger Processor Final crate installed at the experimental site since 2006 Routinely used during cosmic runs and commissioning to provide a Level-1 trigger Central Trigger Processor is configured via the final trigger database Input boards Core board: trigger decision, links to DAQ and Level-2 Output boards CTP Crate

EPS HEP 2007 Manchester -- Thilo Pauly July Endcap-triggered event with hits in precision muon chamber

EPS HEP 2007 Manchester -- Thilo Pauly July Muon confirmation in the precision muon chambers Both, endcap- and barrel-triggered events have hits in the precision muon chambers with characteristic muon TDC spectrum Trigger from barrel reaches the precision muon chamber front-end electronics 130ns sooner than from endcap TDC spectra in precision muon chambers Endcap Barrel

EPS HEP 2007 Manchester -- Thilo Pauly July Muon confirmation on Level-2 Reconstruction and selection algorithms were running in the Level-2 trigger, seeded by regions of interest from Level-1 See next presentation: R. Goncalo, “ATLAS High-Level Trigger”

EPS HEP 2007 Manchester -- Thilo Pauly July Level-1 Calorimeter Trigger Status Installation is moving quickly: –Preprocessor 40% installed –Jet/energy processor installation almost complete –Cluster processor 50% installed –Complex cabling (analogue and digital) fully installed –All hardware will be installed by October Commissioning: –Vertical slices through the system –Tests of integration with Level-2 and DAQ ongoing June 2007 cosmic run: initial small test system (prepocessor and readout) Next cosmic run (end of August): –expect half system to be present –exciting time for commissioning the calorimeter trigger chains

EPS HEP 2007 Manchester -- Thilo Pauly July Summary ATLAS first-level trigger system is based on data from the calorimeters and dedicated muon chambers It reduces the event rate of initially 40 MHz to less than 100 kHz with a latency of less than 2.5 microseconds Significant parts of the ATLAS Level-1 trigger system are already installed at the experimental site Regular combined cosmic-ray commissioning runs are undertaken with a substantial fraction of the ATLAS detector ATLAS Level-1 trigger is well on track to be fully operational for the first collisions in summer 2008