Cleanrooms Keith Middleman. Particulates and Clean rooms What is a particulate? Small discrete mass of solid or liquid. Human hair is 60-90 microns in.

Slides:



Advertisements
Similar presentations
Filter Changing Procedures For TEOM Series 1400ab and Model 8500 FDMS (B & C Types)
Advertisements

Ice. Pure and Simple ™ Welcome to the Ice-O-Matic ® on-line training modules.
Making online claims for OCR Nationals A step-by-step guide for centres.
Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
1 NSF-MRSEC NCMN CLEAN ROOM OPERATING and safety TRAINING Jiong Hua Nebraska Center for Materials and Nanoscience University of Nebraska NCMN Facility.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
Vacuum Vessel Production Readiness Review
Progress and Plan for Superconducting RF Cavity RF Group.
Introductory Validation and the Cleanroom. What we see FDA regulations require Documentation These regulations do not provide Guidelines on how specifically.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
HYGIENE CONTROL IN THE BREWING INDUSTRY
World Health Organization
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
October Module 6: Cleaning Activities and Checking Your Work Overview What is effective cleanup? Interior cleaning techniques. Exterior cleaning.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Houston Material Handling Society October 2008 Baghouse Cleaning Control Presented by: T.J. Winalski.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
OILGEAR PVV PUMPS PVV 200 Performance Curves.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 2/21/
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH HARDWARE PREPARATION FOR XFEL TTC topical workshop.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
 Market Survey  Design, supply, delivery and installation of a Clean Room Facility  at the entrance of the LAr detector tank,  used for the storage.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
Vacuum Processes for Beam Transport Modules (LWU’s) of ESS Keith Middleman STFC Daresbury Laboratory ESS PDR, Lund, 10 th November 2015.
JLab UHV omponent leaning and nitrogen blow off procedures and development Ari D. Palczewski JLab Ari D Palczewski, TTC topical 13Nov2014 Sacley France.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Philippe Goudket ASTeC, STFC Daresbury Laboratory TTC –TOPICAL WORKSHOP SRF CLEANROOM ASSEMBLY.
Update on Work Package 12 Beam Transport Modules (LWUs) - UK-A-6 Dr Paul Aden, STFC Daresbury Laboratory ESS Beam Diagnostics Forum, Lund, 11 th February.
Mixtures 5 methods for separating mixtures. What is a Mixture? A mixture is a substance made by combining two or more different materials in such a way.
Chapter 4 Training Package HCFC Phase-out RACSS – UNEP 2014 Servicing of HCFC/HFC Based Air-conditioners.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
Freestyle Precision Pro
CANTY QUICKPORTS™ “How they work”
Completion of the MICE-US construction project
UK Knowledge of Pipe Bending and Pressure Testing Martin Gibson (RAL) Pipe bending by Ian Lancaster University Connector welding by.
Field Emission Minimization for LCLS-II
14 Refrigerant Recovery, Recycling, and Recharging.
Lecture (9): Monitoring & sampling methods, maintenance ,
NL12 Girder Removal and Reinstallation
DESY Experiences on Use of Gas overlay during Assemblies
Mark Pendleton – STFC Daresbury Laboratory
Operating SRF systems reliably in a “dirty” accelerator
Modern Devices: Chapter 5 – Cleanrooms,
Definition of work flow for string DESY Example on critical operation
National Laboratory Association
Darin Boling / CorrStream Technical Specialist
XFEL Collimation and Beam Switchyard Vacuum Issues
IMP Cryomodule Assembly and Alignment
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
TRENTON Casing Filler Presentation
Experimental equipment Edgar L. Black February 17, 2019
Sterile technique.
BOP FLUID FLUSHING SIMON McMANUS WM CANNING LTD.
Cryomodule Assembly Plan
Daresbury ESS In-Kind Contributions
Sterile technique.
Overview of the TARGET Monolith Rough Vacuum
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Cleanrooms Keith Middleman

Particulates and Clean rooms What is a particulate? Small discrete mass of solid or liquid. Human hair is microns in diameter. Micron = 1/1,000,000 of a metre. What is a clean room? A specially designed room to achieve a specific ISO standard. A filtered distributed air supply. Set of operating and regulatory procedures. A manager.

Particulate origins Where do they come from? All around us. Equipment, process, clean room materials. From us, 10Ks particles / min depending on type of clothing worn.

Low particulate experience on ALICE ALICE Photoinjector vessel In ISO 4 Cleanroom

ISO cleanroom standards Class maximum particles/m 3 FED STD 209E equivalent ≥0.1 µm≥0.2 µm≥0.3 µm≥0.5 µm≥1 µm≥5 µm ISO ISO ISO 31, Class 1 ISO 410,0002,3701, Class 10 ISO 5100,00023,70010,2003, Class 100 ISO 61.0× ,000102,00035,2008,320293Class 1,000 ISO 71.0× ×10 6 1,020,000352,00083,2002,930 Class 10,000 ISO 81.0× × ×10 7 3,520,000832,00029,300 Class 100,000 ISO 91.0× × × ,200,0008,320,000293,000Room air ESS BTM vessels to be particle tested to ISO 5

Signs are important.

Changing room. Sanitise & moisturise

Once all vacuum work in the vacuum laboratory is completed the vessel or component is then transferred to the area outside the clean room and prepared for the cleanroom Cleanrooms Vessels are wiped down with tack cloths All surfaces cleaned and wiped down with IPA wipes Vessels blown off with high pressure filtered N2 Allow time for any particles to settle and then open doors for transfer into the clean room Vessels are transferred into the outer area of the cleanroom – ISO6 and are left for a number of hours before they enter the main ISO4 assembly area

Cleanroom Change 6m 2 ISO 7. Outer 80m 2 ISO 6. Inner 12m 2 ISO 3. at rest

Cleanroom Change 6m 2 ISO 7. Outer 80m 2 ISO 6. Inner 12m 2 ISO 3. at rest

LWU Particle Counting Particle counts to be taken in 4 positions Purge vessel with 0.5 bar N 2 Measure particle count Purge vessel with 0.5 bar N 2 Measure particle count Particle counts to meet ISO 5 on 5 consecutive occasions before moving to the next position

Particle counting procedures 1.A one minute sample of particle level should then be taken and checked to ensure it meets the ISO 5 standard. If it does not then the chamber should be left for a further 30mins and the area retested. If it is still not below the required level then the chamber should be moved back out to the changing area and re-cleaned with a lint free wipe and blown down with N 2. 2.The chamber then should be un-flanged, to do this remove all but two bolts from the flanges (note: this will produce an increase in the particle count) then let the chamber settle again and take another one minute particle count. Then remove the flanges and take a one minute area sample to check ISO class. 3.If ISO 5 is not achieved wait a further 30mins and take a further sample. Repeat this upto 5 times. If the area still does not reach the required level the chamber should be removed and the process re-started. 4.Once the area is acceptable blow the internal chamber surfaces with filtered N 2 at 7 bar. The chamber should then be tapped delicately a number of time across the surface with a rubber mallet. This, N 2 blow then tapping procedure, should be repeated twice more. 5.Then take a one minute sample at the location specified for the unit whilst purging at 0.5 bar with filtered nitrogen. This should be done remotely if possible. 6.Repeat stages 4&5 four more time, recording the counts each time. 7.If each of the particle counts in stage 5 meets the ISO5 specification seal/cap the vessel – passed 8.If any of the particle counts in stage 5 do not meet ISO5 repeat another 5 times, if vessel repeatedly fails then speak to area supervisor.

Cleanrooms After acceptance of the vacuum component it will be vented with pure ‘dry’ filtered N 2 Filtered down to 0.1µm ‘Dry’ - N 2 purged until a dew point of - 70 ⁰ C is measured, keeping moisture down to acceptable low levels Vessel is capped and remains under a N 2 atmosphere

Particulate counting Unfiltered 12 mins of filtering later. Printed result & data file to be saved to database

Particle counting issues STFC experience with ion pumps: Could not condition all ion pumps down to ISO5 Ion pump specification relaxed to ISO6 Decision taken to locate all ion pumps on ALICE beneath the beamline or girder so any particles generated would be captured in the base of the ion pump due to gravity NEG pumps: Given the nature of the NEG pumps having a huge surface area and very difficult to particle count, they were blown with 0.5bar N 2 but they were also positioned beneath the beamline.

Controlled venting and evacuation Aim to implement similar procedures for ESS Venting and Evacuation rates have been agreed to be < 20 mbar per minute to avoid turbulent flow STFC Design option is a combination of In-house design Modular unit purchased from industry Pumping solutions – do not need to be assembled under particle control conditions but some procedural arrangement is required Dedicated procedure to be agreed and implemented across both sites to guarantee ISO particle standards are maintained

Controlled venting and evacuation

Mobile Installation Cleanrooms

Mobile cleanroom used during ALICE build Modular design for use in multiple locations to enable different modules to be connected in the accelerator tunnel Cleanroom and vessel preparation procedures in the mobile cleanrooms are the same as those in the dedicated cleanrooms. Only when ISO5 is established in the mobile cleanroom can the end flanges of each module be removed and the 2 modules connected together Each modular cleanroom has 2-3 parts: Changing area Tool storage area Main working area where flanges are to be connected

ESS Mobile Cleanroom Requirements

Timescale & Plan 1 st mobile cleanroom to be delivered late further mobile cleanrooms to be delivered by Q A total of 3 mobile cleanroom to be delivered (as specified in the technical annex) Once STFC/ESS have agreed on the specification STFC will go out to UK manufacturing to have the cleanrooms manufactured in industry. STFC will conduct a site visit and perform an acceptance test at mnaufacturer’s. Manufacturer to ship directly to ESS.

Similar Systems Conventional mobile cleanroom Cantilevered solution

Thank You

Once all vacuum work in the vacuum laboratory is completed the vessel or component is then transferred to the area outside the clean room and prepared for the cleanroom Cleanrooms Vessels are wiped down with tack cloths All surfaces cleaned and wiped down with IPA wipes Vessels blown off with high pressure filtered N2 Allow time for any particles to settle and then open doors for transfer into the clean room Vessels are transferred into the outer area of the cleanroom – ISO6 and are left for a number of hours before they enter the main ISO4 assembly area

Change area 6m 2 - ISO 7 Outer area 80m 2 - ISO 6 Inner area 12m 2 ISO 3 at rest ISO 4 with 1 person working ISO 5 with 2 people Cleanrooms All vacuum vessels will be transferred into the cleanroom on dedicated cleanroom trolleys which are to be designed

Particle Control Options – full assembly BPMs Difficult to blow out with N2, when cleaning bellows, just pushing particulates into chamber? Also how difficult will counting at this end be if we are blowing the N2 2m away? I’m guessing the counts will be low. Particle control as a complete assembly or not? - Discuss

Particle counting options – split assembly Particle count each part separately then bolt together. BPM blocks can be either welded onto the chamber or flanged.

Summary Report 1-2 page summary after all vacuum processes complete Printed particle count results to included with the report along with the job card