Technical and financial management of the project

Slides:



Advertisements
Similar presentations
BUDGETING Training Unit 13.2 Principles and financial rules of mobility.
Advertisements

1 OUT-IN: Organising, Using and Transferring INnovation LLP-LDV/TOI/07/IT/017 PROJECT MONITORING PLAN AND TOOLS First transnational workshop Manchester,
INTERNAL CONTROLS.
Click to edit Master title style 1 Financial aspects of closure European Commission Felix LOZANO, DG Agriculture and Rural Development.
The Managing Authority –Keystone of the Control System
European Union Cohesion Policy
1 Unit C3 Finance, legal Affairs and Partner support CALL FOR PROPOSALS APPLICATION PROCEDURE SPECIFIC ADMINISTRATIVE AND FINANCIAL ISSUES Version
European Union Cohesion Policy
Accounting and Financial Reporting
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
Characteristics of projects in EU research programmes
PIC INTERREG IIIC Sud “Robinwood” Mr. Paolo Forno Financial Manager Subprojects Administrative procedures.
Communication campaign Most common issues identified: Personnel costs & Other direct costs Antonio Requena Fernández FCH JU Financial Officer.
Technical and financial management of the project Joint Technical Secretariat Seminar on Reporting 13 August Rezekne, Latvia.
Progress and Financial Reporting Geoff Butters, MDR Partners 05 March 2012, KB, The Hague.
1 Financial Procedures in FP7 Projects Reporting and Audits Karolina Lis Research Assistant DCU, Finance Office
“MED P ROGRAMME ” Z ERO C O (2) Z ERO EMISSION CO MMUNITIES F INANCIAL MANAGEMENT SYSTEM K ICK O FF M EETING J UNE 17° 18° 2010.
GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Partners and cross-border cooperation. Why a partnership? Address common challenges jointly (e.g. cross-border pollution) Jointly develop opportunities.
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
Project Implementation training session for actions financed under the Call for Proposals Joint Managing Authority Levi,
DAPHNE II Programme An investigation into forms of peer-peer bullying at school in pre-adolescent and adolescent groups: new instruments and preventing.
This project is funded by the EUAnd implemented by a consortium led by MWH Expenditure verification Estonia Latvia Russia ENPI CBC Programme Project Management.
Financial management Management and control systems Training for Programme Operators March 2012.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
Initial considerations for the project start-up Joint Operational Programme “Black Sea Basin ” Bucharest, 18th of September 2013 Laura Bobârnac,
Reporting Instructions For Beneficiaries and Partners of the HUSKROUA ENPI CBC Programme November 2011.
Delegation of the European Commission to Russia 1 Financial Reporting for Grant Contracts General Conditions
INTERREG IVA 2 Mers Seas Zeeën Crossborder Cooperation Programme Part-financed by the European Regional Development Fund (ERDF) Legal framework:
School Leadership Toolkit for Accelerating Achievement London 17 th November 2014.
Communication campaign Most common issues identified: analysis per cost category Antonio Requena Fernández FCH JU Financial Officer.
DG DEVCO, Unit B.6 Brussels, November Outline 1.Useful links 2.General conditions 3.General issues 2.
Tacis Contracting Procedure Documents to be submitted together with the application:  Original Declaration by the Financial Lead Partner for Tacis  Partnership.
DG DEVCO, Unit B.6 Brussels, April Outline 1.Useful links 2.General conditions 3.General issues 2.
Narrative reporting: good practices. Joint Technical Secretariat Seminar for Beneficiaries February 2012 Narva, Estonia.
ADMINISTRATIVE & FINANCIAL ISSUES DG ECHO HUMANITARIAN AID AND CIVIL PROTECTION Finance, Legal Affairs and Partner Support unit-C3.
Financial reporting Linda Wormö, MA Per Dahlström, MA 1st October,2015 Kuopio, Finland.
REPORTING, BUDGET, ELIGIBLE COSTS. Main steps of the financial management of the project.
1 EURO REPORTING – Doing Business With The EC –. 2 Index  Relationship Overview  The FAFA Principles  Gain/Loss Scenarios  Financial Risk  Possible.
ACP S&T Programme - Stakeholder conference October Implemented by the ACP Secretariat Funded by the European Union EDULINK - ACP Science and.
Paulius Baniūnas Ministry of Finance of the Republic of Lithuania EU Structural Support Management Department Monitoring and Analysis Division SYSTEM OF.
1 Eurostat’s grant policy for 2010 Luxembourg, 23/03/2010 Unit A4 – Financial Management Section 3 – Grant procedures and agreements.
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
Grant contract and annexes Training for Auditors Estonia/Latvia/Russia ENPI CBC Programme Riga, Tartu, April 2012.
Reporting and payment claims Black Sea Basin ENPI CBC Programme Training for Grant Beneficiaries and Partners Bucharest 18 September 2013 Financial Unit.
Reporting and payment claims Black Sea Basin ENPI CBC Programme Training for Grant Beneficiaries and Partners Bucharest 18 June 2014 Financial Unit.
Reporting requirements - contractual and financial issues NGO Kick-off meeting Lorenzina Bruno, Senior Financial Officer Manuel Montero Ramírez, Project.
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Contractual and Financial Management Administrative and Financial Handbook.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
- Special Education Needs (SEN) Network Administrative and Financial Aspects.
EU - China 11 Guidelines for Applicants rules for applications European Union Delegation to China & Mongolia Beijing Information Session 14 th November.
The LIFE Programme: the EU funding tool for the Environment and Climate Action Lorenzina Bruno, Senior Financial Officer EASME – C.1.6 LIFE NGO Kick-off.
Kolarctic ENPI CBC Programme Project implementation training session under the 1st Call for Proposals FINANCIAL ISSUES Joint Managing Authority.
Chisinau, Republic of Moldova 2017
Understanding your Budget, P&L statement and Balance Sheet
Chisinau, Republic of Moldova 2017
Reporting and payment claims
Chisinau, Republic of Moldova 2017
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
Chisinau, Republic of Moldova 2017
Role & Responsibilities
Management Verifications & Sampling Methods
INTERREG IPA CBC “GREECE ALBANIA ”
Kick-off meeting of the project UMBRELLA
MINISTRY OF ECONOMY AND FINANCE
Management Verifications & Sampling Methods
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
Financial and Administrative presentation on PARTICULATES project
Presentation transcript:

Technical and financial management of the project Estonia Latvia Russia ENPI CBC Programme Project Management and Implementation training 20&21 February 2012

Sound project implementation For a sound technical and financial management of your project you need: a monitoring system a financial plan a project accounting system a procurement plan Let’s see these in details now! These need to be set up and regularly updated

1. Monitoring system Why a monitoring system? To keep track of how a project is progressing in terms of resource use, implementation, delivery of results and the management of risks To support effective decision making with systematic and continual collection, analysis and use of management information

Monitoring system Monitoring is: An information system Performed on a systematic, regular basis Based on indicators Concerned with the facts! Concerned with both financial and operational progress information The information needed for monitoring should be identified when the project is first designed and/or when reviewed

Setting up the monitoring system Good monitoring depends on having reliable, relevant and timely information about the activities, outputs and outcomes of your project. This may be achieved by: Setting up a shared, internet-based (intranet), information tool including the control of deadlines, activities, deliverables and indicators using available project management software Requiring the project manager for each partner to submit a regular, short monitoring report to the Beneficiary providing information about the progress being made in implementing the project.

Sources of information for monitoring The grant contract (your logframe, workplan…) Contracting information (sub-contracts) The record of project indicators at the levels of activities, outputs and results The financial records – bookkeeping system Special reports like quantitative surveys, questionnaires

Elements of Financial Monitoring The value of the grant, the co-financing The expenditure and revenue budget and the actual financial position for the reporting period Expenditure & revenue Cash flows Cash flow forecast Bank balances Expected reimbursement claims for next period

Specific financial items to highlight Actual expenditure significantly more than budget Actual expenditure significantly less than budget (eg savings on procurement) Delays in submitting payment requests Unexpected ineligible costs Significant change in exchange rates (effect on budget) Any other unexpected financial issues

Content of Operational Monitoring Synopsis of the Grant contract Contracting (secondary procurement) Input / activity/ output monitoring (efficiency) Results monitoring (effectiveness) and impact Risk monitoring Sustainability Horizontal and cross-cutting issues Good practices Prognosis for future See annex on Operational Monitoring See document attached for more information

Setting-up a monitoring system

The monitoring report Monitoring is based on a standard template adapted to the project Monitoring reports are usually collected on a regular basis (monthly, bi-monthly) Report is based on tables – very little narrative But with the possibility of highlighting unusual good or bad events A good monitoring report is easy and quick to read Monitoring will feed in project reporting Monitoring is no double work, will need to do it anyway for reporting – but adds great value

2. Financial planning (1) Why should you revise project financial planning? Is it not enough with the project budget approved? Even though you prepared a budget including expenditure and sources of funding when preparing the application form, you have to take into consideration that: The budget doesn’t include an accurate monthly estimate for the whole project duration The approved budget does not have any forecast of the timetable for receipt of the sources of funding Not all expenditure imply an additional cash-flow, as they correspond, for example, to staff already working in your organisation

Why should you revise project financial planning? Even though there is a 90% grant contribution, the balance will only be received after the project closure. The pre-financing may not avoid completely some cash deficits during project’s lifetime. Therefore, it is important to make an accurate plan of receipts and payments in order to: Avoid any setbacks in project implementation due to cash shortage; Avoid misunderstandings among partners; Encourage partners to spend in time and contribute to a timely reporting and payment claim to JMA/JTS.

Steps for project financial planning Review your budget in detail to identify needs for minor adjustments in the initially estimated amounts; Confirm your sources of funding and, in particular, the dates of expected receipt of contributions by external donors; Prepare a monthly (or bi-monthly) forecast of all project expenditure; Estimate when you will be able to submit and receive further pre-financing; Prepare a project cash flow forecast.

Let’s see a practical example Our simplified case study will be a project with: Beneficiary and one partner 24 months duration No additional donors, no direct revenue, no in-kind contribution A limited number of budget items Let’s see the project budget See tables annexed

Planning and adjusting expenditure Staff costs Confirm which persons will be working for the project and see if they are already contracted or they have to be recruited Confirm the estimated monthly cost (as “month” is the unit of time in budget) Find out in which month the persons will start working and on what basis, if not full time Unit cost 2000 in real life 500 each month – compare to budget, total is OK

Planning and adjusting expenditure Staff costs Calculate the monthly cost

Planning and adjusting expenditure Other categories Revise the estimated amounts and other necessary assumptions Identify when invoices for services and goods will be paid, according to the delivery dates and credit terms (usually X days after delivery) Make a monthly estimate of paid expenditure for each categories Exclude “contingency reserve” and “administrative costs” from these estimations Let’s see a couple of examples See tables annexed

Planning and adjusting expenditure Other categories

Planning and adjusting expenditure Other categories

Planning payment claims Take the amounts of the first pre-financing Calculate the thresholds of minimum expenditure in order to be allowed to submit payment claims for further pre-financing (see your contract) Estimate the date for submission of payment claims and the receipt of the grant after the approval of the financial report by JMA/JTS Let’s see an example in two tables:

Planning payment claims Do not forget to take into account the administrative costs to estimate when you will reach the threshold!

Planning of cash flows Prepare a final table with: The revenues and their month of receipt; “Additional” foreseen expenditure paid for the project; Monthly and cumulative cash flow and surplus/deficit taking into account the “additional” expenditure; Other payments already budgeted in your organisation, such as permanent staff or administrative costs; Monthly and cumulative cash flow and surplus/deficit taking into account all expenditure

Final remarks on financial planning As with all estimates, the financial forecast is only useful if reviewed and updated on a regular basis Discuss the planning with your partners, get information from them and reach a consensus on commitment for expenditure and payments Cash forecasts tend to be optimistic; revenues arrive later and expenditure on time or earlier Be prudent and ensure that no partner is blocked in their contribution to project implementation for lack of liquidity of funds The tables and assumptions shown in this presentation are just an example

3. Accounting system requirements Art. 16.1 of General Conditions (annex II to the contract): The Beneficiary and partners shall keep accurate and regular accounts of the implementation of the project, using an appropriate accounting and double-entry bookkeeping system. The system: May be either part of the beneficiary’s and partners’ regular system or an adjunct to that system Shall be run in accordance with the accounting and bookkeeping policies and rules that apply in the country concerned Accounts, expenditure and revenue relating to the project must be identifiable and verifiable Details on interest accruing on funds paid by EC have to be provided Again, accounting different from project reporting!

What is an accounting system? Accounting IS NOT a list of expenditure and revenue. An excel file is not an accounting system. General definition of accounting The systematic recording, reporting and analysis of the financial transactions of an entity. Common provisions on accounting by Financial Regulation (Article 132 of EC Regulation 1605/2002) The institution’s accounting system is the system serving to organise the budgetary and financial information in such a way that figures can be input, filed and registered The accounts shall consist of general accounts and budgetary accounts Obvious to your accountant? Maybe not so for non experienced

General requirements on accounting All partners need to have a general accounting in conformity with national rules The project accounting has to be organised as a budgetary accounting in all partners The project accounting has to be kept in the national currency, as the translation to Euro will only be necessary for the financial report to JMA/JTS.

Use of exchange rates in the project Conversion: Purpose Which exchange rate Bank transfer Actual rate applied by bank Reimbursement of subsistence costs to staff National bank daily rate Payment of invoices in foreign currency Translation: Purpose Which exchange rate Reporting Average of monthly rates for the reporting period from Inforeuro Decision on procurement procedure (verification of threshold) Inforeuro rate of the month of launch of the procedure http://ec.europa.eu/budget/contracts_grants/info_contracts/inforeuro/inforeuro_en.cfm

What is double-entry bookkeeping? Definition of double-entry bookkeeping An accounting technique which records each transaction in at least two different accounts, as a credit and as a debit. Credit entries represent the sources of financing, while debit entries represent the use of this financing. Let’s see an example of expenditure in a project-dedicated accounting: The debit will indicate to which category of expenditure the invoice has to be imputed The credit will indicate if the invoice was paid by the beneficiary or a partner. In case of non-dedicated bank accounts, the entry should also indicate which one was used.

Reconciliation with reports Article 16.1. of General Conditions also indicates that: The financial report has to be properly and easily reconciled to the accounting and bookkeeping system and to the underlying accounting and other relevant records. For this purpose, the beneficiary shall prepare and keep appropriate reconciliations, supporting schedules, analyses and breakdowns for inspection and verification.

Setting up your accounting system Ensure that it is in conformity with the requirements of art. 16.1 of General Conditions Design it to provide the necessary information for the interim and final reports Use it periodically to allow a proper follow-up of the project budget and enable you to identify any major deviations beforehand Ensure that there is shared understanding by all partners. If it is a separate system, use the same for all the partnership; if it is included in the partners’ accounting, check its adequacy Ask support to the auditors on the conformity of the system by all partners several months before the first reporting Project monitoring

Archiving of supporting documents Requirements of your archiving system All transactions in accounting are referred to the necessary supporting documents (see presentation on eligible expenditure) The originals of the supporting documents have to be kept by each partner institution, but copies (either scanned or physical) are easily available by the Beneficiary in order to facilitate the financial controls by authorized bodies. A web-based document repository shared by all partners may be very useful for this purpose. The documents have to be archived in a way that they are easily accessible after the project closure. (7 years after receiving the balance payment)

4. Procurement plan Delays in procurement procedures is one of the main risks for not keeping the working plan. Therefore: Identify which are the procurement procedures to be launched during the project implementation and who is the responsible partner Identify the applicable legislation and specific procedures and deadlines Insert the timing of the procedures in the working plan and ensure that no activity will be delayed for this reason Include the procurement plan in your monitoring system