AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.

Slides:



Advertisements
Similar presentations
INJECTOR TEST FACILITY UPGRADE PHASE I: 5-10 MEV INJECTOR Feb. 7, 2014.
Advertisements

S2E Design Plan Start with Matt’s layout Consider Cave1 + Cave2 constraints Use Elegant for initial spatial layout (X,Y,Z) and transverse optics (beam.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Possible new EMMA injectors bdm. Motivation ALICE due to shut down soon Alternate EMMA injection (assuming EMMA project continues which it should …) Several.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Technical aspects of the ATLAS efficiency & intensity upgrade Peter N. Ostroumov ATLAS Users Workshop, August 8-9, 2009.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
I.V. Bazarov, Multivariate Optimization of High Brightness DC Gun Photoinjector, UCLA Workshop, 8-10 November CHESS / LEPP ERL DC Gun Injector.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
12 GeV CEBAF INJECTOR Reza Kazimi Users Group Annual Meeting June 4, 2012.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
Design Requirements/Issues Source/Injector Performance -successful run of 135 pC -DC photocathode gun: cathode lifetime >600 C; GaAs wafer > 2 kC Delivery.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
BIA’s Director Review, September Accelerator Improvements FY11-16 Fulvia Pilat.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Y. Roblin, D. Douglas, F. Hannon, A. Hofler, G. Krafft, C. Tennant EXPERIMENTAL STUDIES OF OPTICS SCHEMES AT CEBAF FOR SUPPRESSION OF COHERENT SYNCHROTRON.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
Optimization Objectives Top Level Questions 10 MeV – Incorporate studies on operability, cost etc. 50 MeV – More stringent beam specs  Optimize 50 MeV.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
Aperture Interception for Full Energy Injector Upgrade Alicia Hofler Reza Kazimi 09/23/
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Beam Commissioning Adam Bartnik.
Joe Grames Center for Injectors and Sources
with help from Riad Sulieman, Arne Freyberger, and Joe Grames
CEBAF Injector Update PREX/CREX March 3-4, 2017
DC Injector and Space Charge Simulation Status
Joint Accelerator Research JGU & HZB
CEBAF Injector Overview
12 GeV CEBAF.
Upgraded Injector Test Facility
The Cornell High Brightness Injector
Operations Department
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Electron Source Configuration
LAL meeting on e+ studies, Oct. 2010
Thoughts on Energy Reach
CEPC Injector Damping Ring
Pulsed Ion Linac for EIC
Center for Injectors and Sources
Advanced Research Electron Accelerator Laboratory
Performance Recovery at CEBAF
Linac/BC1 Commissioning P
A. Freyberg Aug 2016 ECT’16 =>
Test of Booster at UITF Reza Kazimi (12/12/18)
Polarized Source: Recent Activities
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
CEBAF Pulsed Operation for JLEIC Electron Injection
Injector/Linac Design Status C. E
Injector for the Electron Cooler
Update on ERL Cooler Design Studies
Multi-Ion Injector Linac Design – Progress Summary
MEIC low rep-rate operation and path length
HE-JLEIC: Do We Have a Baseline?
Some Thoughts on the JLEIC Ion Injector
Presentation transcript:

AIP and Large Projects Arne Freyberger OPS 2015 StayTreat

Accelerator Improvement Projects Accelerator Improvement Projects (AIP): Large greater than $500k projects Can span multiple years Assigned a special B&R code, but more or less funded by moving funds from Accel OPS B&R into AIP account. Tracked at a high level (DOE), included in the annual budget briefing and S&T reviews. Must be an improvement, not maintenance. C50 program is not an AIP project. High power dump maintenance is not an AIP project. S and T Review July 28-30,

AIP FY13-FY15 AIP work completed FY15 Dogleg Upgrade -- Restores CEBAF path length adjustment to pre-12GeV upgrade range. FY13-FY15 AIP work completed FY14 Injector Upgrade (R100) – Install, commission and operate R100, 100MeV capable cryomodule, effectively doubling the Injector energy gain for compatibility with 12GeV CEBAF. AIP work completed FY13 Injector Upgrade (Gun portion) – Install 200keV capable DC gun, operate for physics at 130keV FY12-FY13 S and T Review July 28-30,

AIP FY14FY15FY16FY17FY18FY19FY20FY21 Dogleg Upgrade Full Energy Injector – 1/4 Cryomodule Full Energy Injector – Integration C50 RF Power & Controls Global Timing System D Beam Diagnostics AIP work planned for FY15 – FY19 Injector Upgrade – Upgrade the CEBAF Injector for 12GeV parity program. Build ¼ Cryomodule – Establish uncoupled transport in the injector. FY11-FY16 Integration – Commission the new ¼ cryomodule in the Upgrade Injector Test Facility (UITF). Upgrade CEBAF Injector components in the warm RF region to support 200keV operation. Install the commissioned new ¼ cryomodule. Commission the complete upgraded injector, from the 200keV gun operation through the new ¼ cryomodule and R100. FY15-FY19 S and T Review July 28-30,

RK, 2010 The goals of the CEBAF Injector upgrade Chopper PCup FC#1FC#2 Apertures BuncherCapture Bunchlength Cavity CryounitCryomodules Synchrotron Light Monitor 500 keV Dump 5 MeV Dump Injection Chicane 45 MeV Dump/Spectrometer Prebuncher Gun#2 Gun#3 Wien Filter New Cryounit with new SRF design Eliminates the x/y coupling and improves and simplifies the Parity Quality beam setup. Add a second 90 deg Wien Filter Enables 180 deg electron spin flip as required by Parity Quality experiments Integrate Capture into the Cryounit Simplifies the acceleration process and lowers the RF power. Increase the injector final energy from 45 MeV to 123 MeV by upgrading the Cryomodules To achieve the 12 GeV injector energy requirement Increase Gun Voltage from 100 keV to 200 keV Lowers the space charge effect to achieve higher beam current in the early injector

The New Booster S and T Review July 28-30,

Results – checked with two codes Bunch length for different currents. This accelerator has to work for both low and high beam currents at the same time! The currents are for 499Mhz CW beam structure. S and T Review July 28-30,

Injector Upgrade New ¼ cryomodule will be ready for initial testing in FY16 Commission at the UITF Cavities complete Cryomodule design nearly complete, procurements started. Need a upgrade team and project leader/manager to manage the many aspects of this upgrade: Gun 200kV operation Upgrade warm RF section for 200keV transport Commissioning new ¼ cryomodule in UITF (FY16/FY17) CEBAF installation and commissioning FY18 and FY 19 S and T Review July 28-30,

AIP Beyond Injector Upgrade C50 RF Controls upgrade: Digital upgrade of the C50 zones, probably about one per year. AIP Funding starts in FY17. Use RSR funds to start preliminary design and cost estimates in FY16. Global Timing System: Epics synchronous timing system AIP funding projected to start in FY19 While waiting for AIP funding, small team should start working on the requirements. Some aspects of this project may already be in progress S and T Review July 28-30,

Large non-AIP projects C50 refurbishment Hall-C dump maintenance S and T Review July 28-30,

Summary Need to attach names/teams to the long term AIP projects. Empowered to work through funding shortfalls. Maintain project momentum Project list subject to change C75 project….. S and T Review July 28-30,

Stop S and T Review July 28-30,

Simulation and Optimization Different designs for the SC Booster was studied. The best results were found with 2+7 quarter design. DC Gun Solenoid Pre-Buncher Cavity Buncher Cavity Chopper Capture Cavity Aperture SC Booster Cavity INJECTOR LAYOUT Old New S and T Review July 28-30,

A set point Energy spread gets large with decreasing current. A result of the over bunching before entering the 2 cell in the unit. Yellow- Red – Magenta – Green - Blue – 100 – 200uA S and T Review July 28-30,

Sensitivity Limits: Set points chosen randomly +/-2% around the nominal condition. Phase in unit +/- 5% Range: Bunch length and transverse emittance still within budget Energy spread and mean energy also reasonable S and T Review July 28-30,