Change Management for MIS “The Interim Is over” Thatcher Deane Sep 28, 2011.

Slides:



Advertisements
Similar presentations
Slide 1 Configuration Management. Slide 2 Goal – Primary Objective To provide a logical model of the IT infrastructure by identifying,controlling, maintaining.
Advertisements

IT Asset Management Status Update 02/15/ Agenda What is Asset Management and What It Is Not Scope of Asset Management Status of Key Efforts Associated.
Software change management
Configuration management
Program Management Portal: Overview for the Client
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
Software Quality Assurance Plan
ServiceConnect® 2.0 Your access to the DrägerService® world.
ITIL: Service Transition
Project Perfect Pty Ltd Project Administrator Overview of Software.
Best Practices – Overview
Chapter 5: Project Scope Management
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
Remedyforce Value Enablement Kit – Change Management
1 Change Management FOR University Medical Group Saint Louis University Click this icon for Audio.
ITIL: Why Your IT Organization Should Care Service Support
Configuration Management
Defining Services for Your IT Service Catalog
Software Configuration Management
Outlook Web Access (OWA) is a web mail service of Microsoft Exchange; allow users to connect remotely via a Web browser OWA is used to access ,
Basics of Good Documentation Document Control Systems
Release & Deployment ITIL Version 3
DBS to DBSi 5.0 Environment Strategy Quinn March 22, 2011.
OnBase Client for Department Admins JUNE 2015 Version 1.3.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
Asset Record Does Not Equal CI: The confusion between Asset and Configuration Management Christine M. Russo Manager, IT Asset Management and Property.
Document Control Basics of Good Documentation and
SERVICE MANAGER 9.2 CHANGE PRESENTATION JUNE 2011.
ITIL Process Management An Overview of Service Management Processes Thanks to Jerree Catlin, Sue Silkey & Thelma Simons University of Kansas.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
Drinking Water Infrastructure Needs Survey and Assessment 2007 Website.
CRS Helpdesk Software Presented By The Systems House, Inc.
Microsoft Virtual Academy. STANDARDIZATION SELF SERVICEAUTOMATION Give Customers of IT services the ability to identify, access and request services.
Project Scope Management 1. 2 Learning Objectives Understand the elements that make good project scope management important. Explain the scope planning.
CRS Helpdesk Software Presented By The Systems House Inc.
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
Introduction to ITSM processes. CONFIDENTIAL Agenda Problem Management  Overview  High Level process Change Management  Overview  High Level process.
ITSM Status: Metrics,Problem Management, FUSION12 and the ITSM Program Page ITS Quarterly Staff Meeting Friday November 30 th 2012 ITS Team.
Problem Management for ITSD “Getting to the root of it” Thatcher Deane Feb 28, 2013.
ITIL® Core Concepts “Foundations to the Framework” Thatcher Deane 02/12/2010.
Chapter 25 – Configuration Management 1Chapter 25 Configuration management.
IT Infrastructure Library (ITIL) For You -With Max Mart The ManageEngine Guy!!
 1- Definition  2- Helpdesk  3- Asset management  4- Analytics  5- Tools.
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
ITIL: Service Transition
Pegasus: Request Management
Configuration Management
Software Project Configuration Management
Please review these important Webinar Etiquette guidelines
CARA 3.10 Major New Features
Software Configuration Management
Release Management Release Management.
ITSM Request Fulfillment
ITIL Model Overview and Impact on ITS
Establishing Strategic Process Roadmaps
ITSM Request Fulfillment
The Process Owner is the Secret Agent!
ITIL: Why Your IT Organization Should Care Service Support
ITIL: Why Your IT Organization Should Care Service Support
Computing Division Helpdesk Activity Report
Assessment Workshop Title of the Project (date)
Project Information Management Jiwei Ma
E-Procurement Project
The Service Portal What is the Self-Service Web Portal?
Inside a PMI Online Course
ITIL: Why Your IT Organization Should Care Service Support
The Service Portal What is the Self-Service Web Portal?
DSG Governance Group Recommendations.
Principles of Change Management
Contract Management Software 100% Cloud-Based ContraxAware provides you with a deep set of easy to use contract management features.
Presentation transcript:

Change Management for MIS “The Interim Is over” Thatcher Deane Sep 28, 2011

AGENDA  Where we are  Where we’re going  The new Change Process  Tool support: KBOX  TIPS / FAQ  What’s next?  Questions

The Basics  Change Management (CM) Provides a formal, consistent and efficient methodology facilitating successful Changes while minimizing the impact of those Changes on services and operations. The primary Objectives of Change Management are: Communication Assessment Logging Scheduling Testing and Plans Reporting Configuration Management

Where we are  Major Interim Process Limited Scope (Major) Change Manager did most of the work Change tickets owned by Change Manager Request for Change (RFC) isolated Word Form Limited | Parallel tracking in KBOX Manual preparation of Stats and Forward Schedule of Change (FSC)

Where we are  Major Interim Process Stats (Feb 25, 2010 – Sep 19, 2011)  Total Changes 147  Successful 112  Unsuccessful 9  Cancelled 4  Changes triggering Incidents 77 A record of what we did, when we did it and how it turned out

Where we’re going  New Change Management Process Broader scope Fully Documented More Self-service Clarified Work flow More Distributed Work load Process Supported by a tool (KBOX)

Where we’re going  What else New Change process is a prequel to other ITSM Processes (Incident, Request and Problem)  Documented in the same format  Statuses specific to work flow  Use of separate KBOX Process Queue How it was built  Informed by templates and Interim experience  Tailored to our organization  Built with tools on hand

What’s not new  Process Basic Process Flow Tracking our work Exercising professional care  Tools KBOX (our work management tool) RFC (Request for Change)

What’s new  Scope increase  Distinct approval step  Change tickets in your KBOX ticket list  Linking Changes to and from Incidents  Start on linkage of Change to Config Items  Terms Successful – Followed the Change implementation plan – not necessarily fixed the targeted Incident or Request Requester – Replaces submitter

Scope of new Change Process (1/3)  The addition, modification, or removal of anything (hardware, software, process, procedure etc.) that contributes to or could impact an IT Service.  Three types of 'Managed' Changes: (1) Normal Change – ‘Change’ (2) Standard Change (3) Emergency Change

Scope of new Change Process (2/3) (2) Standard Change - Changes that are low risk, low impact, pre- approved, and well documented. Standard Changes are managed via the Request Fulfillment Process, not the Change Management Process. An example of a Standard Change is provision of a new computer. (3) Emergency Change - Change of an urgent nature but in the same scope as a Normal Change, where the addressed Incident impact and urgency do not allow for all steps of the Change Management Process to be competed before the Change is implemented. Emergency Changes have a faster approval process but require, after the fact, the same level of documentation as a Normal Change.  Un-managed Change - Any Change that is undertaken without the support of this Process. That is, a change that has no Change ticket opened and no RFC filed against it.

Scope of new Change Process (3/3) (1) Normal Change, (a.k.a. Change) include, in the production environment or data center: a) addition, significant reconfiguration or removal of network devices such as routers, bridges, switches, firewalls. b) addition, significant reconfiguration or removal of storage devices such as SAN servers, SAN storage c) addition, significant reconfiguration or removal of file, application, web or other servers d) significant modification to the standard desktop or impacting an entire business function e) significant modification to application infrastructure or functionality f) significant modification to Internet or Intranet Web infrastructure or functionality g) addition, significant reconfiguration or removal of Database infrastructure or services.

Documentation for your Binder  Process Flow Diagram  Process Description Executive Summary  Extracts from full Process Description Definitions Process Procedures  Request For Change (RFC) Template

Work Flow: High Level Five Activities Role Primarily Responsible for each Activity KBOX Statuses and Owners during each activity

Work Flow: Detail Activity Tasks Responsible Roles

Process Description (1/2)

Process Description (2/2) Goal Objectives Statuses Metrics Roles Policies Governance Activities Initiate Authorize and Schedule Review and Assess Implement and Verify Review and Close  Standard Sections:

RACI Chart by Task / Role

Process Definitions

Process Procedures  Work instructions for Changes in KBOX

Request For Change Template  The RFC is for the information that will not fit into the KBOX ticket screen. Instructions for the RFC Tips for dealing with a Word Form

Tool support: KBOX Changes  New ‘Process Queue’ allowing Change Process Specific screen fields Change Process Status settings Linkage (baby steps) to Configuration Items  Lookup into KBOX assets  Free form field

The Change Process Queue (1/3)  Something New at the New Ticket button Use Process Queue ‘Change’ for New Changes You will not see the other Process Queues for Incident, Problem and Request Fulfillment until those Processes are rolled out. Everything else (New Incidents and Requests) use the The MIS HelpDesk Process Queue.

Change Process Specific Layout Mostly fields obvious, but instruction in labels and detailed instructions provided in Procedures Document. Moved some items from RFC to Change ticket screen

Process Specific screen fields Statuses relate only to the lifecycle of a Change not to Incident or Request.

Single list for dependent Orgs

Linkage to Configuration Items (1)Look up CI touched by Change in KBOX here… (2) If you want a more complete look up / list of KBOX asset items go to this link… (2) If you don’t find it or have more than one, enter here…

The Change Process Queue (2/3)  Seeing C along with I and R tickets.

The Change Process Queue (3/3)  Then sort, if needed, on column

KBOX Screen Shots: New Ticket

KBOX Screen Shots: Ticket Example

TIPS –Show owned or submitted To Shows tickets you own or you submitted: use View By Active Tickets

TIP – Custom Views To Create and Save a Particular Ticket List View Create a Custom View

TIPS – URL to All Process Queues To Shows tickets you own or you submitted in all process queues, rather than navigate via the ‘View By’ drop downs, just go to this URL: To Shows tickets you own or you submitted in all process queues, rather than navigate via the ‘View By’ drop downs, just go to this URL: LL&ORDER[]=QUEUE_NAME&ORDER_R EV=1

TIPS – KBOX Asset Extract  ex.asp ex.asp

TIP – comments and attachments to KBOX tickets  Easy way to attach RFC and other docs to a Change Ticket.  Specific TIPS in Process Procedures Document  Each process queue has different address: (The MIS Help Desk) (Change)  Sender must be a KBOX Owner for the process queue, that is MIS staff.

TIP – comments and attachments to KBOX tickets

FAQ  Where do I find the Documentation about all this, including this presentation?  The usual place: MIS Services > MIS Division > MIS ITSM Improvement Program > Active ProcessesMIS DivisionMIS ITSM Improvement Program

FAQ  When does this take effect? Start of Business, Mon Oct 3 rd  What if I’m not clear if something is a Change or can’t tell if it is a Normal or Standard Change? If the documentation is not clear, consult with a Section Head or the Change Manager.

What’s Next  For Change Management Change Models Finding all the Standard vs Normal Change distinctions Process adjustments as needed and scheduled tune ups (CSI)

The End Mahalo, especially to those of you who:  Created and support the Test KBOX environment  Had a Change under the Interim Major process  Read the Full Change Process Description document  Commented on the new Change process beta KBOX  Assisted beta testing of the new process  Reviewed earlier versions of this presentation QUESTIONS? and COMMENTS!