ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,

Slides:



Advertisements
Similar presentations
Cryogenic discussion and update 30 October 2014Neutrino platform.
Advertisements

LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
LAr1-ND David Montanari Fermi National Accelerator Laboratory CERN – Feb 16, 2014.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
LAr1-ND Cryogenics Concept David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014.
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Single Phase Test at CERN Cryostat/Cryogenics Update
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
EHN1 Cryogenic Integration Requirements David Montanari / Johan Bremer Jun 18, 2015 Rev. 1.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
Installation of the T600 at Fermilab CSN2, September 22,
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Overview of the ESS Linac Cryogenic Distribution System
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
Installation of the T600 at Fermilab
Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Magnet cryogenic system update.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
IT-4189 Supply and installation of a cryogenic distribution system
Proximity Cryogenics P&IDs Meeting
protoDUNE – single-phase Instrumentation - Gas Analyzers
Neutrino Platform Overall Protodune Risk Mitigation Plan O
HFM Test Station Main Cryostat
Proximity Cryogenics P&IDs meeting
M. Chalifour - TE/CRG-CI
SPS cryogenic proximity equipment and SM18 validation
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Status of the PANDA Magnet
Warm structure requirements :
Test box for ProtoDUNE SP – Integration Test
CRYOMODULE FINAL ASSEMBLY
Discussion on MERIT Cryogenics Specifications
Cryogenics – The Basics
SNS PPU Cryomodule Instrumentation
Vacuum System Design for the Target Monolith System
Overview of the TARGET Monolith Rough Vacuum
CRYOMODULE FINAL ASSEMBLY
J. Fleiter, S. C. Hopkins, A. Ballarino
INTRODUCTION ALAQUA is a US corporation. We manufacture process equipment. Our engineers have over 20 years experience in the engineering of sanitary and.
Presentation transcript:

ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14, 2016

Outline Intro Process Flow Diagram (PFD) Interfaces Dielectric breaks Example of interface Example of interface sheets Summary Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents2

Intro The scope of the tender is the design, procurement, fabrication and installation of the following items:  SBN-FD (NP-01) Proximity Cryogenics.  ProtoDUNE Dual Phase (NP-02) Proximity and External Cryogenics (minus the LAr/LN2 tanks and the LAr circulation pumps).  SBND (NP-03) Proximity Cryogenics.  ProtoDUNE Single Phase (NP-04) Proximity and External Cryogenics (minus the LAr/LN2 tanks and the LAr circulation pumps). The tender is issued with a Design Specifications (we do not supply pipe/valve sizes, etc.). The Internal Cryogenics is NOT part of this tender for any project. We have defined the interfaces between the Proximity and Internal (and/or External where applicable) such that we can procure the Proximity and properly interface it with the rest of the equipment. The warm piping is NOT part of this tender for any project. This contribution presents the interfaces for NP-02 and NP-04. Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents3

Main document: Design Specifications. P&IDs. 3D Models of buildings (EHN1, SBND, SBD-FD) and installation with valve boxes and pipes envelopes (not to exceed) based on space constraints. Interface sheets. 2D drawings. Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents4 Information supplied to the bidders

Cryogenic systems Internal Cryogenics:  Inside the cryostat.  GAr/LAr distribution for cryostat purge, cool down, fill. Proximity Cryogenics:  Circulate and purify LAr.  Achieve and maintain LAr purity.  Recondense and purify boil off GAr. Infrastructure/External Cryogenics:  Receive Ar/N2.  Transport GAr/LAr, GN2/LN2 to Proximity.  Vents. Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents5 For NP-02 and NP-04 this tender covers Proximity and External Cryogenics only. Not part of this tender.

Process Flow Diagram (NP-04) Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents6 EDMS: External Cryogenics Proximity Cryogenics

Process Flow Diagram (NP-02) Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents7 External Cryogenics Proximity Cryogenics EDMS:

Interfaces External to the tender:  The two sides are supplied by two parties. There is an actual interface.  Internal/Proximity Cryogenics (right outside the top of the cryostat).  Internal/External (right outside the top of the cryostat). Internal to the tender:  The selected vendor supplies both sides, there is no actual interface, but a continuous item.  Proximity/External Cryogenics (not a specific point, in the vicinity of the cryogenic area near the cryostat).  Valve Box/Transfer Line.  Valve Box/Uninsulated Line. Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents8

Common Cryogens supply (Sheet 3/3) Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents9 EDMS:

LAr/GAr Filtration (NP-04) Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents10 EDMS:

Cryostat (NP-04) Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents11 EDMS:

Condenser Valve Box (NP-04) Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents12 EDMS:

Dielectric Breaks – 1/2 Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents13 Dielectric breaks will be ceramic on all process pipes and G-10 spacers on vacuum jackets. CERN has experience with them. Will include bellows to ease the alignment. Each dielectric break will have its own insulation monitor (per CERN HSE). They are part of this tender. EDMS: Interface Proximity/Internal Cryogenics

Dielectric Breaks – 2/2 Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents14 EDMS:

Example of a valve box and interface with Transfer Line Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents15

Example of Interface sheet 1/5 (From NP-04) Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents16 Process parameters of the lines connected to the valve boxes: -Port name and type. -Process pipe or not. -Description. -Dimensions  Vendor’s task. -Maximum allowable conditions (Pressure and Temperature). -Operating conditions (Pressure, Temperature, Flow rate). -Maximum mechanical loads  Vendor’s task. EDMS:

Example of Interface sheet 2/5 (From NP-04) Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents17 EDMS: Process parameters of the pipes inside the valve boxes: -Description -Nominal and max flow rate. -Max pressure drop  Vendor’s task. -Outer diameter  Vendor’s task.

Example of Interface sheet 3/5 (From NP-04) Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents18 Transfer lines and process parameters. EDMS:

Example of Interface sheet 4/5 (From NP-04) Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents19 EDMS: Transfer lines and interface points/types.

Example of Interface sheet 5/5 (From NP-04) Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents20 Types of interfaces with the valve boxes: -Name and type. -Cold pipe connection. -Vacuum connection. -Cold pipe size  Vendor’s task. EDMS:

The implementation of the Protego design within the GTT membrane cryostat design is ongoing and proceeding well. New drawing available (specific for this project), but proprietary. Side Penetration Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents21 EDMS:

Summary We have identified the type, size and location of the penetrations (through the cryostat top and sides) for the cryogenic services and instrumentation. We have identified the interfaces between the Proximity and Internal Cryogenics: they will be outside of the cryostat, where the dielectric breaks (part of this tender) will be located. The interfaces between Proximity and External are internal to the selected vendor: both sides are part of this tender. We have developed the interfaces between the various parts with process parameters, type and location of connections that the vendor will need to design to. Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents22

Thanks Apr 14, 2016David Montanari | ProtoDUNEs Interface Documents23