1 Overview of Maryland Pepco and Delmarva Power Spring 2007 Blueprint for the Future Filings Tom Graham, President Pepco Region Maryland Commission Hearing.

Slides:



Advertisements
Similar presentations
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Advertisements

1 Conservation Program Cost-Effectiveness Tests Presentation to the: Florida Public Service Commission Workshop on Energy Efficiency Initiatives November.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
0 © 2011 Silver Spring Networks. All rights reserved. Building the Smart Grid.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
1 NARUC/FERC Collaborative on Demand Response Pepco and Delmarva Power Blueprint for the Future Filings J. Mack Wathen July 15, 2007.
1 11 Public Service Commission Update on Utility Issues: Reliability and Infrastructure Upgrades, Advanced Metering Issues, and Related Matters Briefing.
Regulatory View of DSM/EE David Drooz Public Staff – N.C. Utilities Commission April 2015.
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
ON IT 1 Con Edison Energy Efficiency Programs Sustaining our Future Rebecca Craft Director of Energy Efficiency.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
SMART REGULATORY APPROACH FOR SMART GRID INVESTMENTS Barbara R. Alexander Consumer Affairs Consultant 83 Wedgewood Dr. Winthrop, ME (207)
The Efficiency of Energy Efficiency Program Tom Van Paris Vice President-Member Services & Communications October 18, 2012.
System Reliability Procurement: Non-wires Alternatives in Rhode Island Tim Roughan National Grid.
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
1 Overview of Allocating Revenue Requirements Based on Shares of Marginal Costs May, 2012.
Power Utilities in the Telecom Business in the USA: Past Failures and Future Trends Mike Oldak Vice President & General Counsel Utilities Telecom Council.
SPP.org 1. SPP: Demand Response and Advanced Metering in Arkansas.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
MEC: Customer Profitability Models Topic DSM – DR, Advanced EE and Dispatch Ability Jesse Langston, OG&E Oct 20 th 2013.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Technical Conference on Net Metering Load Research Study November 5, 2014.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
The Secrets to Successful AMI Deployment – The Ontario Experience Paul Murphy, President & CEO Independent Electricity System Operator February 19, 2007.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
Demand-Side Management Models & Practices in California Innovating for Sustainable Results: Integrated Approaches for Energy, Climate, and the Environment.
Linking the Wholesale and Retail Markets through Dynamic Retail Pricing Presented by: Henry Yoshimura Manager, Demand Response ISO New England September.
EEI Energy Efficiency Initiative Eric Ackerman ( Senior Manager, Regulatory Policy April 23, 2007.
CEC 08-DR-1 Efficiency Committee Workshop 3/3/08.
New York State System Benefits Charge (SBC) – NGA Center for Best Practices April 29, 2004 Bob Callender Vice President for Programs NYSERDA.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
FERC Staff’s Report on Demand Response and Advanced Metering.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
Demand Response
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
CEC Public Workshop Order Instituting Informational and Rulemaking Proceeding (08-DR-01) March 3, 2008.
1 Potomac Electric Power Company Case 9155 & Delmarva Power & Light Case 9156 EmPOWER MARYLAND DRAFT NON-RESIDENTIAL ENERGY EFFICIENCY AND.
EmPower MD Act overview and Demand Response Training EmPower Maryland.
1 Pepco and Delmarva Power September 1, 2008 EmPOWER Maryland Filing (Case Nos and 9156 ) First Working Group Discussion Sept. 25, 2008.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
BGE Smart Grid Initiative Stakeholder Meeting September 17, 2009 Wayne Harbaugh, Vice President, Pricing and Regulatory Services.
1 Pepco and Delmarva Power Demand Side Management Programs Stakeholders Meeting February 20, 2009.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Energy Conservation at Dominion George Washington Regional Commission Green Government Commission January 28, 2009 Harold Crowder Program Manager Harold.
0 Proposed AMI and Dynamic Pricing Customer Education Plan for Pepco’s Maryland Service Area November 15, 2010.
1 BGE Smart Energy Pricing Program: Update to Maryland Public Service Commission April 23, 2008 Wayne Harbaugh VP – Pricing & Regulatory Services.
Workshop February 4, Idaho Power Smart Grid Vision At Idaho Power, our smart grid vision remains focused on seven major characteristics : 1.Enhance.
1 PLANNING CONFERENCE ON MARYLAND’S ENERGY FUTURE WILLIAM GAUSMAN VICE PRESIDENT ASSET MANAGEMENT JULY 25 – 26, 2007.
Smart Grid Tariff Changes
National Action Plan for Energy Efficiency Energy Efficiency Policy Options and Program Best Practices MD PSC Planning Conference on State’s Future Electricity.
1 Proposed Performance Tracker for PSC Working Group 1 of 3 CategoryMetricResults Project Costs Cost to Deploy: Capital vs total Capital deployment cost.
Technical Advisory Group Meeting
SMECO Demand Response filing
MEPAV 2010 CONFERENCE. AMI MANASSAS Gregg S. Paulson, P. E
Pepco and Delmarva Power
Energy Efficiency and Conservation
Technical Advisory Group Meeting on BGE’s Conservation Program
Allegheny Power Residential Demand Response Program
SMART REGULATORY APPROACH FOR SMART GRID INVESTMENTS
Smart Grid Primer Energy Bar Association – Primer for Lawyers
Electricity Demand Response and Advanced Metering for Integrated Utilities Arkansas Public Service Commission Lonni Dieck AEP May 24, 2007.
Tajiguas Resource Recovery Project Doing More with Our Waste
Anna Garcia Air Innovations Conference August 2004
New England Electricity Restructuring Roundtable
Advanced Metering Infrastructure Smart Meters
Wholesale Electricity Costs
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Maryland’s Grid Modernization Experience
Presentation transcript:

1 Overview of Maryland Pepco and Delmarva Power Spring 2007 Blueprint for the Future Filings Tom Graham, President Pepco Region Maryland Commission Hearing -- Annapolis July 26, 2007

2 Motivation for Pepco and Delmarva Blueprint Filings Higher Regional Energy Costs – Blueprint Plan facilitates Maryland customer control over electricity bills and places downward pressure on PJM market wholesale energy and capacity prices. MADRI/Commission/PJM Brattle Study recently calculated that a 3% reduction in peak electricity demand would reduce regional electricity prices annually by $57 million to $182 million. Demand response capabilities mitigate generator market power. Constrained Regional Transmission Import Capability – Blueprint Plan reduces future peak electricity demand to lessen burden on transmission system. Growing Environmental Concerns over Power Plant Air Emissions – Blueprint Plan reduces future power plant air emissions and resulting greenhouse gases.

3 Motivation for Pepco and Delmarva Blueprint Filings (continued) Availability of New Electric Distribution System Technology –Blueprint Plan uses new tested technology to enhance distribution system operation, improving service quality, reducing electric distribution operational costs, supporting demand side management initiatives – including both dynamic pricing and new demand response technologies, supporting renewable generation technologies, and supporting future plug-in vehicles. Plan Benefits vs. Costs –Blueprint Benefits will be Significantly Greater than Costs for Maryland Pepco and Delmarva Customers –DSM Proposals are Cost-Effective and were Tested Using All Ratepayers Test (Pepco and Delmarva recommend Commission adoption of Societal Test) –AMI Utility Specific Business Case to be Shared w/Maryland Stakeholders in the Near-term –Significant Regional/National Benefits from Resulting Reductions in Greenhouse Gases

4 Key PHI Blueprint Initiatives Energy Efficiency/Conservation Programs –Reduce Annual Electricity Use Demand Response Programs –Reduce Summer Peak Electricity Demand Advanced Metering Infrastructure –Improve Distribution System Operation –Improve Customer Service –Provide Interval Consumption Data through Remote Readings –Support Demand Response through Dynamic Pricing and Direct Load Control Technology Capability –Support Small Renewable Generation/Plug-In Vehicles

5 PHI Blueprint Filings Delaware Delmarva Power Filing -- February 9, 2007 –Commission Established Working Group Process Maryland Delmarva Power Filing – March 21, 2007 –Commission Established Working Group Process Maryland Pepco Filing – March 21, 2007 –Commission Established Working Group Process

6 PHI Blueprint Filings (continued) District of Columbia Pepco Filing – April 4, 2007 –Commission Established Regulatory Case Each Blueprint Plan Includes: –AMI Universal Deployment for all PHI Electric/Gas Distribution Customers –Utility Provided Energy Efficiency Programs –Utility Provided Demand Response Programs –Each Plan Specific to Each Jurisdiction New Jersey Atlantic City Electric Filing – Planned for Summer 2007

7 Maryland Blueprint Plan(s) Requested Regulatory Commission Actions 1)Permission to Establish a Delmarva Power and a Separate Pepco Specific Demand Side Management (DSM) Collaborative –DSM Collaboratives would Discuss Utility Provided DSM Programs and Submit Final Agreed Upon Utility Provided DSM Programs for Commission Approval –Collaboratives to be Lead by Delmarva and Pepco 2)Permission to Establish a Delmarva Power and a Separate Pepco Specific AMI Advisory Group Utilities to Share AMI Technical Plans w/participants and permit exchange of ideas Utilities responsible for determining final technical specifications and selection/negotiations w/vendors

8 Maryland Blueprint Plan(s) Requested Regulatory Commission Actions (continued) 3)Establish a DSM Cost Recovery Mechanism – Proposed Distribution Bill Surcharge w/5 Year Recovery Period, Similar to Previous MD DSM Surcharge 4)Establish AMI Cost Recovery Mechanism – Proposed Distribution Rate Adjustment to Ensure Timely Recovery of AMI and Related Demand Response Capital Costs over a 15 Year Period, Similar to Mechanism Established by other States 5)Approve Bill Stabilization Adjustment Mechanisms Contained in Delmarva Power and Pepco Base Distribution Rate Cases – Removes Financial Disincentive for Distribution Utility Investments in DSM

9 Delmarva Power/Pepco Recommended Utility DSM Programs General Awareness Campaign – Customer DSM Education/Marketing Effort Residential Programs –Home Performance w/Energy Star: Home Audit Based Program –HVAC Efficiency: High Efficiency Central AC/HP and Training Program –Lighting/Window AC Program: Compact Fluorescent Lighting and High Efficiency Window Units Program –Smart Stat: Remotely Controllable Programmable T-stat Central AC/HP Program

10 Delmarva Power/Pepco Recommended Utility DSM Programs (continued) Non-Residential Programs –Building Commissioning and O&M: Consulting/Engineering Services to Improve Efficiency of Buildings –HVAC Efficiency: High Efficiency HVAC Equip. up to 30 Tons and Contractor Training –Prescriptive: Energy Efficiency Measure Incentives for Electric Motors and Lighting –Custom Incentive: Site Specific Efficiency Measures –Smart Stat: Remotely Controllable T-Stat Program –Internet Platform: Web-based Platform to Facilitate Participation in PJM Demand Response Market

11 Delmarva Power DSM Forecast Impact After Three Year Initial Implementation Residential –13.6 MW Peak Demand Reduction –20,600 MWh Annual Energy Reduction –41,200 Participants –181,100 DSM Measures Non-Residential –40.6 MW Peak Demand Reduction –60,900 MWh Annual Energy Reduction –5,210 Participants –446,000 DSM Measures

12 Delmarva Power Three Year DSM Budget Residential –$8.9 million Non-Residential –$6.1 million General Awareness –$2.9 million Total (including start-up) –$18.3 million

13 Pepco DSM Forecast Impact After Three Year Initial Implementation Residential –33.6 MW Peak Demand Reduction –55,900 MWh Annual Energy Reduction –110,500 Participants –493,800 DSM Measures Non-Residential –57.8 MW Peak Demand Reduction –124,300 MWh Annual Energy Reduction –9,200 Participants –1,079,944 DSM Measures

14 Pepco Three Year DSM Budget Residential –$21.8 million Non-Residential –$10.8 million General Awareness –$3.9 million Total (including start-up) –$37 million

15 Advanced Metering Infrastructure Universal Deployment of Advanced Meters for All Distribution Customers –Meters Capable of Providing Interval Data through Remote Readings –Providing Distribution System Monitoring –Communications with Direct Load Control Equipment/Smart Appliances/Data Display Devices

16 Delmarva Power Maryland AMI Deployment Overview Install Meter Data Management System Replace 204,278 Meters Build Out Required Communications Project Schedule –18 to 24 Months for Technical Specifications/Vendor Selection –5 Year Installation Period Estimated Capital Cost: $1 million for MDMS, $50 million for AMI

17 Pepco Maryland AMI Deployment Overview Install Meter Data Management System Replace 530,952 Meters Build Out Required Communications Project Schedule –18 to 24 Months for Technical Specifications/Vendor Selection –5 Year Installation Period Estimated Capital Cost: $2.7 million for MDMS, $125 million for AMI

18 AMI Benefits Remote Meter Reading –Eliminates Need for Meter Reader –Permits More Frequent Readings –Supports Enhanced Customer Service Capabilities –Improves Reading Accuracy –Discovers Malfunctioning Meters –Customer Specific Load Research Data

19 AMI Benefits (continued) Demand Response –Communicates w/Demand Response Enabling Technology –Supports Dynamic Pricing Options –Enhances Customer Control Over Monthly Bills through Detailed Consumption Data

20 AMI Benefits (continued) Distribution System Monitoring –Improves Distribution System Design, Reliability, and Performance Distribution System Asset Management –Outage Reporting –Increased Accuracy of Repair Crew Dispatch Remote Service Disconnect –Reduces Utility Service Visits Tamper Detection –Informs Utility of Possible Meter Tampering

21 AMI Benefits (continued) Supports New Rate Options –Pricing for Renewable Generators –Pricing for Plug-In Vehicles –Any Time Differentiated Pricing Summary of Benefits –Distribution Utility Cost Reductions –Distribution Customer Service Enhancements –Peak Demand Reductions –PHI to Share Estimated Monetary Value of Benefits with Maryland Stakeholders in the Near-term

22 Blueprint Path Forward Pepco and Delmarva Power are Prepared to Begin the Implementation of their Blueprint Plan Now The Plan Will: –Reduce Electricity Use/Reduce Peak Electricity Demand –Help Maryland Customers Manage Higher Energy Costs –Reduce Overall Regional Wholesale Electricity Market Prices –Lessen Burden on Increasingly Constrained Regional Transmission –Reduce Future Power Plant Air Emissions –Improve Distribution System Operations –Improve Utility Customer Service –Take Advantage of New Technologies Implementation Delay will Lengthen the Period Before these Benefits are Available to Maryland Consumers

23 Blueprint Backup Slides

24 DSM Program Selection Process Commercially Available DSM Measure Applicable to Maryland Market Screened for Cost-Effectiveness using All Ratepayers Test (ART) –Avoided Energy Prices Derived from MD SOS Prices –Avoided Capacity Prices Derived from Cost of New Generation Entry and Regional Transmission Constraints Approx. 370 DSM Measures Screened for Cost-Effectiveness –65% Projected to be Cost-Effective Under ART Additional Measures Would Pass if Societal Test Used and Value of Reduced Negative Externalities Estimated Pepco/Delmarva Power DSM Programs Intended to be a Starting Point for Utility Specific Collaboratives –Measures Expected to be Cost-Effective Packaged into Programs

25 Cost Recovery Bill Stabilization Adjustment –Distribution Rate Decoupling Mechanism Removes Utility Financial Disincentive to Offer/Support DSM –Only Applicable to Distribution Portion of Bill –Proposed in Delmarva Power/Pepco Current Distribution Base Rate Cases DSM Surcharge –Non-Bypassable Distribution Surcharge –Rate Class Differentiated –5 Year Recovery of DSM Costs –Interest on Unrecovered Costs at Utility Allowed Rate of Return –Similar to Maryland DSM Surcharge in Existence During the 1990s

26 Cost Recovery (continued) AMI Adjustment Mechanism –Timely Recovery of AMI Capital Costs Over 15 Year Period to Reflect Expected Equipment Life –Accelerated Cost Recovery of Existing Meters Over 3 to 5 Year Period –Recovery of Demand Response Smart Thermostat Capital Cost Over 15 Year Period –Interest on Unrecovered Capital Costs at Utility Allowed Rate of Return –Utility Monetized AMI Operational Savings to be Netted from AMI Adjustment Mechanism –AMI Adjustment Mechanism Set Annually Based on Previous 12 Month Actual Expenditures –Similar AMI Cost Recovery Mechanisms Approved by Other Jurisdictions

27 Cost Recovery (continued) Alternative Cost Recovery Method - Utility Base Distribution Rate Cases –Delays Timeliness of Cost Recovery, Potentially Increasing Utility Cost of Capital –Increased Regulatory Burden on All Maryland Market Stakeholders