12-31 EMC Approval of Broad River Basin Hydrologic Model November 8, 2012 Division of Water Resources NC Department of Environment and Natural Resources.

Slides:



Advertisements
Similar presentations
Nebraska Water Management Nebraska Department of Natural Resources September, 2004.
Advertisements

© 2014 HDR, Inc., all rights reserved. Catawba-Wateree Water Supply Master Plan.
Governor’s State Water Law Review Committee Recommendations 1982: Implementation Update David G. Baize Bureau of Water.
© 2014 HDR, Inc., all rights reserved. Catawba-Wateree Water Management Group Water Supply Planning.
Apalachicola/Chattahoochee/Flint Focus Area - USGS WaterSMART NIDIS SE Climate Forum Lake Lanier Islands, GA December 2, 2011.
Flow 2008 Don Kraus, P.E., General Manager The Central Nebraska Public Power and Irrigation District.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
Interdistrict Transfers of Water and Local Sources First Land Resources and Regulatory Committee November 3, 2005 Land Resources and Regulatory Committee.
Alabama Water Resources Association Geological Survey of Alabama
What is OASIS? Water resources simulation/optimization model
2016 Columbia River Basin Long-Term Water Supply and Demand Forecast Dan Haller, PE
© 2014 HDR, Inc., all rights reserved. L. Kevin Mosteller, PE, SVP-HDR BUILDING A ROBUST WATER MODEL TO EVALUATE LONG- TERM WATER SUPPLY OPTIONS FOR UNION.
NYS Department of Environmental Conservation Flow Standard Amendment to New York’s Water Quality Standards Regulations Scott J. Stoner Chief, Standards.
Division of Water Resources COMPREHENSIVE BASIN PLANNING The Integration of Water Quality Planning and Water Quantity Planning Ian McMillan Chief, Basin.
The Future of Sustainable Water Initiatives in North Carolina PENC Engineering Leadership Conference Tuesday, December 2, 2013 Donald L. Safrit, P.E.,
Road map hydrology and water allocation SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning in Turkey.
5th Shire River Basin Conference 22 February 2017 Shire River Basin Management Project Shire Basin Planning Tool Sub-Component A1 Development of a.
Department of Environmental Quality
Department of Environmental Quality
Department of Environmental Quality
Department of Environmental Quality
Regulatory Review of 15A NCAC 02L Groundwater Classification and Standards Jeff Manning - Division of Water Resources Environmental Management Commission.
Ten Reasons to Use South Carolina’s Surface Water Quantity Models
Department of Environmental Quality
Klamath ADR Hydrology Report
NC EMC – Water Allocation Committee
Department of Environmental Quality
Department of Environmental Quality
Water Quality and Environmental Flows
Division of Water Resources Overview
Request for Approval of Cape Fear / Neuse River Basin Hydrologic Model
May 12, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
Department of Environmental Quality
Ten Tribes Partnership Tribal Water Study
Department of Environmental Quality Division of Water Resources
Water Quality Rulemaking in Response to S.L
Department of Environmental Quality
Department of Environmental Quality
WATER POLICY And Management in AlabamA
Department of Environmental Quality
Department of Environmental Quality
Groundwater and Waste Management Committee November 9, 2016
May 11, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
Department of Environmental Quality
Department of Environmental Quality
Local Water Supply Plan Summary
Report of Proceedings Surface Water Quality Standards Triennial Review Environmental Management Commission November 13, 2014 Steve Tedder – EMC Hearing.
Evan Kane Division of Water Resources
Temporary Rulemaking for 15A NCAC 02L Section .0400
Department of Environmental Quality
Department of Environmental Quality
Department of Environmental Quality Scott Bullock
September 8, 2016 Request Approval of the Determinations to be Submitted to Rules Review Commission for Subchapter 15A NCAC 02E (Periodic Review of Existing.
Committee Update: Review of Groundwater Standards/IMACs
Department of Environmental Quality Division of Water Resources
Julie Woosley, Division of Waste Management
Final Determination Environmental Management Commission March 11, 2015
Department of Environmental Quality
Department of Environmental Quality
Department of Environmental Quality
North Carolina Division of Water Resources
Regulatory Reform Act (SL ) Periodic review and expiration of existing rules NC Environmental Management Commission March 13, 2014 Jeff Manning.
2013 CCPCUA Assessment Central Coastal Plain Capacity Use Area
Water Allocation Committee IBT Update July 2015
Solutions to Challenges to Water Supply Permitting
Department of Environmental Quality Division of Water Resources
Jacques Delsalle, DG Environment, Unit D.1
Presentation transcript:

12-31 EMC Approval of Broad River Basin Hydrologic Model November 8, 2012 Division of Water Resources NC Department of Environment and Natural Resources Managing Water Resources to Support North Carolina’s Future 1

Staff Recommendations Managing Water Resources to Support North Carolina’s Future 2 Based on the public comments and staff validation of the model, the DWR recommends that the Environmental Management Commission approve the Broad River Basin Model.

Improve River Basin Modeling – SL Managing Water Resources to Support North Carolina’s Future 3 (3) Model. – Each basinwide hydrologic model shall: a.Include surface water resources within the river basin, groundwater resources within the river basin to the extent known by the Department, transfers into and out of the river basin that are required to be registered under G.S H, other withdrawals, ecological flow, instream flow requirements, projections of future withdrawals, an estimate of return flows within the river basin, inflow data, local water supply plans, and other scientific and technical information the Department deems relevant. b.Be designed to simulate the flows of each surface water resource within the basin that is identified as a source of water for a withdrawal registered under G.S H in response to different variables, conditions, and scenarios. The model shall specifically be designed to predict the places, times, frequencies, and intervals at which any of the following may occur: 1.Yield may be inadequate to meet all needs. 2.Yield may be inadequate to meet all essential water uses. 3.Ecological flow may be adversely affected. c.Be based solely on data that is of public record and open to public review and comment. (6) Approval and modification of hydrologic models.

Broad Hydrologic Model Basin models required by Session Law (G.S. § (o)) DWR uses OASIS for meeting the requirements of SL – OASIS is a patented, mass balance, water resources simulation/optimization model. – Change-in-Storage = Inflow - Outflow Uses Operations Control Language (OCL) to communicate operating policies to the model Managing Water Resources to Support North Carolina’s Future 4

Applications of Broad OASIS Model Alternatives Evaluation – “What if?” 1.Evaluation of the combined basinwide effects of current and future water supply demands. 2.Evaluation for Interbasin transfer permit applications. 3.Model will be on the DWR server and available to stakeholders and their consultants. – Development of individual water supply plans. – A platform for developing risk-based triggers for water shortage response plans. – SEPA impact analysis. Managing Water Resources to Support North Carolina’s Future 5

Broad River Basin Modeling Process Managing Water Resources to Support North Carolina’s Future 6

Model Schematic Managing Water Resources to Support North Carolina’s Future 7

8

Broad River near Boiling Springs Arc Validation Scenario Managing Water Resources to Support North Carolina’s Future 9

Public Notice In July 2012 the DWR published a Public Notice recommending that The Environmental Management Commission approve the Broad River Basin Hydrologic Model. This notice provided a 60-day public comment period ending on August 30, 2012 as well as opportunities for model training. 10

Comments made by Duke Energy 1. Raise the lower rule for Lake Summit from to year-round. This will more closely reflect how the lake is operated. 2. Raise the upper rule for Gaston Shoals to year-round. Currently, the upper rule is set to for a few periods during the year. By license, this lake is operated within either the top foot or top two feet depending on the time of year. The lower rules for Gaston Shoals in the model are accurate for all time periods. 11

Staff Recommendations Managing Water Resources to Support North Carolina’s Future 12 Based on the public comments and staff validation of the model, the DWR recommends that the Environmental Management Commission approve the Broad River Basin Model.

Questions? Managing Water Resources to Support North Carolina’s Future 13 Broad Model Website Broad Model Report - _Modeling_the_Broad_River_Basin_Operations_with_OASIS.pdf _Modeling_the_Broad_River_Basin_Operations_with_OASIS.pdf Contact Information Tom Fransen, Deputy Director