LCG Introduction John Gordon, STFC GDB December 7 th 2010.

Slides:



Advertisements
Similar presentations
Storage: Futures Flavia Donno CERN/IT WLCG Grid Deployment Board, CERN 8 October 2008.
Advertisements

Jan 2010 Current OSG Efforts and Status, Grid Deployment Board, Jan 12 th 2010 OSG has weekly Operations and Production Meetings including US ATLAS and.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Storage Accounting John Gordon, STFC GDB June 2012.
What if you suspect a security incident or software vulnerability? What if you suspect a security incident at your site? DON’T PANIC Immediately inform:
EGI-Engage Recent Experiences in Operational Security: Incident prevention and incident handling in the EGI and WLCG infrastructure.
CERN IT Department CH-1211 Genève 23 Switzerland t EIS section review of recent activities Harry Renshall Andrea Sciabà IT-GS group meeting.
LCG Introduction John Gordon, SFTC GDB December 2 nd 2009.
Operating Systems & Information Services CERN IT Department CH-1211 Geneva 23 Switzerland t OIS Drupal Database Selection Tim Bell 6 th June.
CERN IT Department CH-1211 Geneva 23 Switzerland t Storageware Flavia Donno CERN WLCG Collaboration Workshop CERN, November 2008.
LCG Introduction John Gordon, STFC GDB September 9th 2009.
LCG Introduction John Gordon, STFC-RAL GDB September 9 th, 2008.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES GGUS Overview ROC_LA CERN
INFSO-RI Enabling Grids for E-sciencE Enabling Grids for E-sciencE Pre-GDB Storage Classes summary of discussions Flavia Donno Pre-GDB.
WLCG Grid Deployment Board, CERN 11 June 2008 Storage Update Flavia Donno CERN/IT.
Information System Status and Evolution Maria Alandes Pradillo, CERN CERN IT Department, Grid Technology Group GDB 13 th June 2012.
LCG Introduction John Gordon, STFC-RAL GDB May 2, 2007.
CERN IT Department CH-1211 Genève 23 Switzerland t 24x7 Service Support Tony Cass LCG GDB, 24 th November 2009.
EMI INFSO-RI Accounting John Gordon (STFC) APEL PT Leader.
LCG Introduction John Gordon, STFC GDB September 14 th 2011.
LCG Introduction John Gordon, STFC GDB December14 th 2011.
LCG Introduction John Gordon, STFC GDB June 8 th 2011.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES GGUS Ticket review T1 Service Coordination Meeting 2010/10/28.
Accounting Update John Gordon and Stuart Pullinger January 2014 GDB.
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
GDB Introduction Ian Collier STFC Rutherford Appleton Laboratory Group info (if required) GDB, January 13 th 2016.
LCG Support for Pilot Jobs John Gordon, STFC GDB December 2 nd 2009.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES Andrea Sciabà Hammercloud and Nagios Dan Van Der Ster Nicolò Magini.
LCG Introduction John Gordon, STFC GDB July8th 2009.
LCG Accounting Update John Gordon, CCLRC-RAL WLCG Workshop, CERN 24/1/2007 LCG.
LCG User Level Accounting John Gordon CCLRC-RAL LCG Grid Deployment Board October 2006.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
CERN IT Department CH-1211 Genève 23 Switzerland t SL(C) 5 Migration at CERN CHEP 2009, Prague Ulrich SCHWICKERATH Ricardo SILVA CERN, IT-FIO-FS.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES Andrea Sciabà Ideal information system - CMS Andrea Sciabà IS.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
Outcome should be a documented strategy Not everything needs to go back to square one! – Some things work! – Some work has already been (is being) done.
CERN - IT Department CH-1211 Genève 23 Switzerland t Service Level & Responsibilities Dirk Düllmann LCG 3D Database Workshop September,
LCG Accounting Update John Gordon, CCLRC-RAL 10/1/2007.
LCG Introduction John Gordon, STFC-RAL GDB June 11 th, 2008.
LCG Introduction John Gordon, STFC-RAL GDB November 7th, 2007.
Storage Accounting John Gordon STFC GDB, Lyon 6 th April2011 GDB January 2012.
CERN IT Department CH-1211 Genève 23 Switzerland t DPM status and plans David Smith CERN, IT-DM-SGT Pre-GDB, Grid Storage Services 11 November.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
LCG Introduction John Gordon, STFC-RAL GDB August 31st, 2007.
GDB Introduction Ian Collier STFC Rutherford Appleton Laboratory GDB, May 11 th 2016.
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT Middleware Update GDB, 9 th February 2011 Slides by Maria Alandes.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES Author etc News from the CMS computing and offline monitoring.
Daniele Bonacorsi Andrea Sciabà
WLCG IPv6 deployment strategy
Jeremy Coles, STFC-RAL GDB April 4, 2007
Sviluppi in ambito WLCG Highlights
David Kelsey CCLRC/RAL, UK
gLite->EMI2/UMD2 transition
LCG Security Status and Issues
Ian Collier STFC Rutherford Appleton Laboratory
Short term improvements to the Information System: a status report
WLCG Operations Coordination
Update on Plan for KISTI-GSDC
The CREAM CE: When can the LCG-CE be replaced?
Update on SHA-2 and RFC proxy support
John Gordon, STFC-RAL GDB March 11, 2009
John Gordon, STFC-RAL GDB April 8th 2009
WLCG Accounting Task Force Update Julia Andreeva CERN WLCG Workshop 08
John Gordon, STFC GDB October 12th 2011
John Gordon, STFC-RAL GDB June 6, 2007
John Gordon, STFC GDB April 6th 2011
WLCG Collaboration Workshop;
New Types of Accounting Beyond CPU
CHIPP - CSCS F2F meeting CSCS, Lugano January 25th , 2018.
Presentation transcript:

LCG Introduction John Gordon, STFC GDB December 7 th 2010

LCG Since the Previous Meeting Distributed Database Operations Workshop 16/17 th November VOMS/VOMRS and Experiments, CERN 2

LCG GDB meetings in 2010 Second Wednesday of each month Pre-GDB rooms booked, October 3

LCG GDB meetings in 2011 Propose second Wednesday of each month Rooms booked Do these dates clash with anything? EGI-UF th April – moved to 6 th 4

LCG Pre-GDB meetings None currently planned Proposals please.

LCG Forthcoming Events VOMS/VOMRS and Experiments, CERN ISGC, Taipei, March 2011 (With OGF) EGI User Forum, Vilnius, th April, 2011 WLCG Workshop, Summer

LCG GDB Issues MU Pilot Jobs, SCAS, Argus, gLExec CREAM SL5 – SL4 phase out Virtualisation Installed capacity OPN 7

LCG Three Security Incidents security incident at a WLCG site –ssh account compromised. –entry point: weak SSH password on the "squid" user in general, –ssh remains the main entry point for attackers –"Valid SSH credentials grant you access to our site, but not our trust" CVE : instant root exploit –another critical vulnerability enabling any local user to be root –no reboot required to install the security patches –situation carefully monitored, 99% sites are patched savannah.gnu.org compromised via an SQL injection –savannah.cern.ch uses the same software –The security and savannah team at CERN investigated and protected the application 8

CERN IT Department CH-1211 Geneva 23 Switzerland t ES Xrootd Capacity Publishing As of today, site administrators of xrootd-based storage implementations miss tools to publish installed capacity and usage information for their storage resources. This concerns mainly ALICE sites but also CERN EOS. We have worked to develop, validate and make available information providers for wide deployment. Flavia Donno - WLCG Management Board - December 7, 2010

CERN IT Department CH-1211 Geneva 23 Switzerland t ES Status Xrootd GIP provided by Claudiu Schiaua (ALICE). Installations at NIHAM and SUBATECH used as guinea pigs for code improvement/validation. Monitoring through Gstat2 also improved. Both sites are now validated. KIT will be validated soon. CERN EOS in the loop. Code ready for wide deployment. – (install instructions) – (source code) How should this code be distributed? Support? –Frontier/Squid is another example. Flavia Donno - WLCG Management Board - December 7, 2010

CERN IT Department CH-1211 Geneva 23 Switzerland t ES CREAM At the November GDB the experiments stated that their testing of CREAM had been successful. –Alice and ATLAS are already using it in production Time for all sites to install and to set a date for withdrawal of support for the LCG-CE –No SL4 support after the end of 2010 –How about before data taking in 2011 (end of February? Detailed review of performance and any other issues in January GDB

CERN IT Department CH-1211 Geneva 23 Switzerland t ES WLCG Middleware When CERN had a significant presence in EGEE and gLite the boundaries between the software developed and supported by these projects and WLCG was slightly blurred. Now that EGI and EMI are more arms- length, WLCG must be confident that it understands the support models and expectations for all software important to us.

LCG IPV6 Security Update Middleware HEPiX Virtualisation WG CVMFS for Software Distribution Experiment Operations Celebration Drink Today

LCG DAaM Demonstrator Review –Wednesday 12 th January Argus EMI Release 1 January GDB

LCG Merry Christmas... And a Happy New Year 15