HL-LHC: project status and plans Lucio Rossi – LARP CM16, Montauk 16 May 2011.

Slides:



Advertisements
Similar presentations
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
Advertisements

Name Event Date Name Event Date 1 LHC Upgrade We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Role of Management and Technical Coordination
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
E. Todesco DESIGN STUDY FOR THE LHC UPGRADE WP3: MAGNETS E. Todesco CERN, Geneva, Switzerland Thanks to O. Bruning, G. De Rijk, T. Nakamoto, J. M. Rifflet,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Future Accelerators at the High Energy Frontier
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
General Considerations for the Upgrade of the LHC Insertion Magnets
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
HL-LHC: scope, structure and management HL-LHC internal kick-off day 15 April 2011.
CERN- KEK about LHC upgrades programs Lucio Rossi 14 December 2011.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
FP7 HiLumi LHC Design Study Lucio Rossi CERN. Structure of the project HL-LHC and the FP7 HiLumi FP7 Design Study
LHC High Luminosity Upgrade plans (including introduction to FP7 Hi-Lumi Design Study) Lucio Rossi CERN sLHC-PP Public CERN 8 March 2011.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
The integration of 420 m detectors into the LHC
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
Overview of Wire Compensation for the LHC Jean-Pierre Koutchouk CARE-HHH Meeting on beam-beam effects and beam-beam compensation CERN 08/28/2008.
E. Todesco LAYOUT FOR INTERACTION REGIONS IN HI LUMI LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Dalena, M. Giovannozzi, R. De Maria,
08/11/2007M. Giovannozzi – CARE-HHH-APD IR’071 Optics issues for Phase 1 and Phase 2 upgrades Massimo Giovannozzi, CERN Outline: –Option for Phase 1 and.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The High Luminosity LHC Project
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
CERN, 11th November 2011 Hi-lumi meeting
Fabio Follin Delphine Jacquet For the LHC operation team
Superconducting Links R2E and Avalilability Workshop
Operating IP8 at high luminosity in the HL-LHC era
HL-LHC IT STRING and Series test of SC link
contribution to the round table discussion
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
The HL-LHC Circuits: Global View and Open Questions
The LHC - Status Is COLD Is almost fully commissioned
e-lens Readiness Review Introduction
Optimization of Triplet Field Quality in Collision
Accelerator and Experiment Interface Session: LS2, LS3
The HL-LHC project: info day for industry
HL-LHC project overview
DEBRIS IMPACT IN THE TAS-TRIPLET-D1 REGION
CSP Meeting CERN CERN Accelerators in th November 2010
Summary Thursday h21: Stable beams fill #1303.
HL-LHC operations with LHCb at high luminosity
Frank Zimmermann & Walter Scandale
SLHC-PP kick-off meeting, CERN 9 April 2008
Summary Tuesday h23: Machine closed. Precycle started.
Review of Quench Limits
LHC Machine Advisory Committee, CERN 12th June 2008
Presentation transcript:

HL-LHC: project status and plans Lucio Rossi – LARP CM16, Montauk 16 May 2011

Content Scope Structure A few WPs non included in LARP Management Situation of HiLumi FP7 DS 16 May LARP CM162

How the luminosity might evolve optimistic to 2012, then prudent: nominal 16 May LARP CM16 Data from M. Lamont Graph E. Todesco NOT yet validated in LMC Based on 15 months LS1 now under change 3

16 May LARP CM16 Data from M. Lamont Graph E. Todesco NOT yet validated in LMC How the luminosity might evolve optimistic to 2012, then nominal -cont 220 inv fb by end of 2020 Based on 15 months LS1 now under change 4

Lumi evolution: more otpimistic (ultimate=2xnominal) is reached 16 May LARP CM16 If LHC performs « nominal »: the upgrade is required by the saturation If LHC performs better, saturation is 2 years later, but radiation limits may come in earlier In such case we may reach 320 inv. fb for end of Data from M. Lamont Graph E. Todesco NOT yet validated in LMC Based on 15 months LS1 now under change 5

Not yet approved! S. Myers 11 April 2011

The goal The main objective of HL-LHC is to implement a hardware configuration and a set of beam parameters that will allow the LHC to reach the following targets: A peak luminosity of 5×10 34 cm -2 s -1 with levelling, allowing: An integrated luminosity of 250 fb -1 per year, enabling the goal of 3000 fb -1 twelve years after the upgrade. This luminosity is more than ten times the luminosity reach of the first 10 years of the LHC lifetime. 16 May LARP CM167

Goal – cont. Levelled lumi of LL p =5  s -1 cm -2 (not Hz cm -2 ) Annual integrated luminosty: IL =250 fb-1 – More than 1 fb -1 a day Which is more important? I guess IL. We take L p as guideline, not a barrier, however it is understood that this is the nominal limit. These goals are already questioning parameter space of Linear Collider: we need to be correct, optimist but not overoptimist 16 May LARP CM168

We need to have potential for L p =10-15  (before levelling) – Today the preferred baseline is to reach and then « crabbing ». But may be we put crab at max immediately and then use another parameters. – We cannot rely only on one scheme: we need to have scheme with very low  and not small , we need to explore very high beam current and moderate beam current, and having more than on leveling methods. – Many actions will be needed in addition to the most visible being discussed today to reach integrated : Turn around time: will allow « releasing » beam current (protection) Stops, Shutdowns, etc… – Advanced robotics and monitoring? – Remove on surface of sensible equipments. To be worked out with experiments The upgrade is « ultimate consolidation », too. I see these actions as a « continuum » with some spike activities, the biggest being the final installation around May LARP CM169

example HL-LHC parameters,  *=15 cm parametersymbolnom.nom.* HL crabHL sb + lrcHL 50+lrc protons per bunchN b [10 11 ] bunch spacing  t [ns] beam currentI [A] longitudinal profile Gauss rms bunch length  z [cm] beta* at IP1&5  [m] full crossing angle  c [  rad] 285 ( )508 Piwinski parameter  c  z /(2*  x *) tune shift  Q tot potential pk luminosityL [10 34 cm -2 s -1 ] events per #ing effective lifetime  eff [h] run or level timet run,level [h] e-c heat SEY=1.2P [W/m] SR+IC heat KP SR+IC [W/m] IBS  rise time (z, x)  IBS,z/x [h] 59, 10240, 69 38, 668, 3318, 31 annual luminosity L int [fb -1 ] March

Here the critical zone in IP1 and IP5 16 May LARP CM16 ATLAS 1. Change of Triplet + D1 and all IR; but it is not enough 2. We need to touch deeply also the matching section lay-out; 5. For collimation we would like to change also this part, DS in the continous cryostat 3. We need to insert Crab Cavities in the matching section; LR BB compensation wires

Structure By deliverable – Study and R&D (big part in FP7 HiLumi Design Study and Eucard(2)) – Construction tooling&infrastructure, if needed, components, Assembly Test (on surface) – Installation, commissioning This way external contribution are easy to evidence and to account Also is easy to do a cost-to-completion and decision making by line management My view is to agree at Management level the cost (M+P) and time profile, then transfer resources (with clear control) to Department/Groups. It is their job to efficiently manage it and our job to check, to see sufferance or excess and propose transfers/integrations. Contingency at CERN level (or Project with full transparency toward management, but see US project: in this way contingency is always used) The cost-structure should be based on CORE-cost. This will easy in-kind contribution and make them visible. Next slides: quick overview, details and substructure to be discussed with various leaders of projects and systems. First INTERNAL(CERN) meeting held on 14 April 2011 (Indico, select Project, look for HL-LHC) 16 May LARP CM1612

HL-LHC composition Collimation Project Matching section and correctors Beam Diagnostics High Field Magnets R&D HE-LHC Studies Hardware Commissioning 16 May LARP CM1613

LARP CM1616 May 2011 Cold powering system: electrical transfer of the current from the room temperature terminal of the current leads to the magnet bus (LHe). It is an active mechanical, electrical and cryogenic system that incorporates superconducting parts - in the LHC High Temperature Superconductor (Bi-2223) in the current leads and Low Temperature Superconductor (Nb-Ti) in the bus. Cold Powering LHC: DFBs in line with the magnets in most of the cases. Power converters are in the tunnel in dedicated alcoves -as near as possible to the the DFBs. Current Leads SC bus bar DFB From A. Ballarino - CERN 14

Link LARP CM1616 May 2011 SC bus bar DFB Powering via remote power converters requires the use superconducting links Current Leads Electrical transfer at cryogenic temperature across long lengths From A. Ballarino - CERN 15

LARP CM1616 May 2011 Advantages of remote powering: -Safer long-term operation of powering equipment (power converters, current leads and associate auxiliary devices) located in a radiation-free environment; -Safer access of personnel to equipment for maintenance, repair, diagnostic and routine tests interventions; - Reduced time of interventions on power converters, current leads and DFBs if the powering equipment is located outside of the tunnel areas – gain in machine availability ; - Free space in the beam areas which becomes available for other equipment. Cold Powering via Superconducting Links From A. Ballarino - CERN 16

LARP CM1616 May 2011 LocationEquipment concerned P7DFBA and DFBM: DFBAM+DFBMH (P7L, RR73) DFBAN+DFBMH (P7R, RR77) R2E: Radiation To P7 The PCs will be re-located in the Tunnel (TZ76) → semi-horizontal underground links P7L P7R Betatron cleaning Insertion DQR IP7 Q4 Q5D3Q6 DFBM DFBA Q11, Q10…Q7 IP 6 D4 4.5 K 8.75 m  1 m RR 73  22 m To TZ76 PC From A. Ballarino - CERN 17

Leads and Power Converters ~ 250 m R2E: Radiation To P7 LARP CM1616 May 2011 Integration studies by Y. Muttoni From A. Ballarino - CERN 18

LARP CM1616 May 2011 UJ 13RR 13 IP1 Q3,Q2,Q1 DFBXD1Q4,D2Q5Q6 DFBL DFBA Q11, Q10…Q7 IP 8 TAS TAN 4.5 K 1.9 K  12 m  3 m  3.6 m To the surface IR Upgrade : HL-LHC Project From A. Ballarino - CERN 19

CERN-Fermilab collaboration on 11 T 2in1 LHC dipole LHC collimation system upgrade. –11 T 11-m long twin-aperture Nb 3 Sn dipoles compatible with the LHC lattice and major systems can provide the required space for cold collimators additional design constrains Space in the LHC lattice for different insertion devices –dynamic collimators, correctors, instrumentation, etc. LARP CM1616 May

Single-bore Demonstrator Challenges: aperture, length, B max, W, schedule 16 May LARP CM16 From A. CM1 21

Twin-bore Demonstrator Challenges: 2-in-1 horizontal configuration, aperture, aperture separation, B max, length, schedule 16 May LARP CM16 From A. CM1 22

Long Range Beam – Beam Compensation Tests at RHIC and SPS indicate that a wire carrying a DC current can be used to compensate long-range beam-beam effects Challenges for such a system in the LHC – Machine protection issues for a wire which is positioned at less than 12 sigma to the beam – Accurate positioning of the wire – Cooling of a few mm 2 wire carrying up to 200A The current plan is to test such a system as soon as possible in the LHC – Proposal to base the system on a collimator design Profits from collimator controls & interlocks Integrated BPMs would allow precise positioning Water cooling already integrated in collimator design – Infrastructure for 2 such systems (Pts 1 & 5) to be prepared during Long Shutdown 1. – Installation either in LS1 or in subsequent winter technical stops R. Jones - CERN

HL-LHC & Beam Instrumentation BLM System – Investigations underway to integrate BLMs into the triplet cold mass Need to be close to the beam-pipe to distinguish between beam loss and collision debris Several technologies being looked into for operation at 2-5K – Despite using many rad-tolerant components the current BLM electronics needs to be distanced from the detectors in high radiation areas (collimation, triplet, DS) Requires long cables which increases noise For 7TeV operation this is already close to the quench limit ASIC design being studied to allow front-end electronics next to the detector Increase in Bunch Intensity – Many systems, including the BPM system, may require upgrade of electronics to be able to cope with these higher intensities. R. Jones - CERN

HL-LHC management 16 May LARP CM1625

Installation PDR preparation m Choice TDR Approval Construction FP7 DESIGN STUDY HiLumi EU FP7 Design Study 16 May LARP CM16 End of year 26

Large participation application 25 Nov May LARP CM1627

HiLumi is the focal point of 20 years of converging International collaboration The collaboration wiht US on LHC upgrade started during the construction of LHC. DOE programs are fundamental for LHC upgrades. EU programs have been instrumental in federating all EU efforts With Hi-Lumi the coordination makes a step further: from coordinated R&D to a common project CERN is not anymore the unique owner, rather is the motor and cathalizer of a wider effort. Managed like a large detector collaboration (with CERN in special position as operator of LHC). 16 May LARP CM1628

Budget FP7 HiLumi 16 May LARP CM16 Waiving effect CERN waives all technical works: LHC is core program. Only kept the CERN cost for managem. 50% 85% of CERN gen. mngt Only EU research area N.1/67 Score 15/ M€ 29

Budget cont. 16 May LARP CM16 Personnel for HiLumi by WP 1.Manag and Tech. Coord. (6%) 2.Acc. Physics and beam 3.Magnets for IR 4.Crab Cavities 5.Collimators 6.Sc links Estimated cost for the the whole HL-LHC over 10 years in M€ Precise cost evaluation by end

In-Kind contributions: targets Profiting of LARP – 200 M$ from USA (US accounting) 5 G¥ (50 MCHF) from Japan Others? – Member States? Difficult or impossible? CH and FR are the obvious candidates Other MSs (or Labs) with specific interest or exchange of help we give them – Non MSs: we need to think wide… 16 May LARP CM1631

conclusions 16 May LARP CM1632