The GEM Proto-Collaboration (“GEMs for CMS”) Marcus Hohlmann, Florida Tech Interim Chair of Proto-Collaboration Board 2 nd CMS Workshop on High-eta Muon.

Slides:



Advertisements
Similar presentations
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
Advertisements

Introducing Florida Tech Laszlo Baksay Marcus Hohlmann High Energy Physics Group Dept. of Physics & Space Sciences.
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
Presentation of the CB Chairperson Candidates, 10 Dec Claudia-Elisabeth Wulz CB Chairperson Views and Ideas.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
TE/MPE/EM/PMT Collaborations Rui de Oliveira on behalf of PCB workshop team 29/11/20121.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
General news CLIC detector and physics meeting at LC2013, May 30 th 2013 Lucie Linssen L. Linssen, CLIC detector & physics meeting, May 30th
28 July 2011 Las Vegas-ADCOM 1 International Conference Liaison Patrick Le Dû (CEA and IN2P3/CNRS) A short review of ANIMMA and ICALEPCS.
GEMs for CMS Upgrade Muons are quite central to most of the Physics that would unfold from “CMS” Triggering and tracking with muons, is therefore a challenging.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
IUPAP International Union of Pure and Applied Physics C11 Commission of Particles and Fields Gregor Herten, Chair of C11 Freiburg University, Germany Report.
October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.
27 April ’12 MINER A meeting Alessandro Bravar Université de Genève UniGE Miner a Application Motivation UniGE neutrino group MINER UniGE NA61 / SHI.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Pierluigi Paolucci - INFN of Napoli 1 Official Muon talks at 2006 Conferences 1.10th Topical Seminar on Innovative Particle and Radiation Detectors – 1-5.
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
India CERN Meeting, BARC, 28/02/11
ATLAS micromegas activities (MAMMA)
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
Marcus Hohlmann (Florida Institute of Technology) with C. Armaingaud, S. Colafranceschi, R. De Oliveira, and A. Sharma (CERN) on behalf of the CMS GEM.
GEM Detector R&D at Florida Tech – “Get to know each other” –
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
M. Staib, M. Abercrombie, B. Benson, K. Gnanvo, M. Hohlmann Department of Physics and Space Sciences Florida Institute of Technology.
Muon Conference Pigi Paolucci. Front-End Control and Monitoring System for the Resistive Plate Chambers at the CMS Experiment Contributed to be given.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
Few ideas for the future of the collaboration I.laktineh.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
TEMPLATE DESIGN © CONFIG. 1: 12mm(Drift) / 12mm(T1) / 12mm(T2) / 12mm(Induction) CMS Endcap Resistive Plate Chamber Muon.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
1 Third RD51 CB meeting – 16/6/2009 AGENDA 1.Approval of the agenda 2.Approval of the minutes of the 14/10/2008 CB meeting in Paris (Minutes circulated.
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association INSTITUT FÜR EXPERIMENTELLE KERNPHYSIK
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
CMS at LNF group activities Davide Piccolo for the LNF CMS group LNF Scientific commettee1.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS 12th Topical Seminar on Innovative.
Trigger & Tracking detector for CMS
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Supported by Italian Ministry for Foreigner Affaires Sponsored by Academy of Scientific Research and Technology of the Arab Republic of Egypt (ASRT) CM.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
Ain Shams University & The British University
Organization and Goals for the Workshop
PANDA Muon Group Meeting, Protvino 7 June 2011 G
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Stefano Colafranceschi on behalf of:
GEM DAQ-Chamber Integration Test Stand for GE2/1 & ME0 at Florida Tech
WP5: Micropattern Gas Detectors
June 22, 2017 Burkhard Schmidt for the DT coordination team
for the EURISOL Steering Committee
A. Zhang, S. Colafranceschi, M. Hohlmann
LABORATORI NAZIONALI DI FRASCATI
Seventh RD51 CB – 14/4/2011 AGENDA Approval of the agenda
Third Workshop on GEMs for CMS
INO TRIDAS presentations
Matthew Bomberger1, Francisco Izquierdo1, Aiwu Zhang2
Bulgaria’s research landscape and the context of CERN collaboration
NTU Proposal to join CMS Tracker on Pixel Upgrade Phase I
Report on EUCARD WP6: MICE Transnational Access (TA)
Francesco Forti University and INFN, Pisa
Development of Gas Electron Multiplier Detectors for Muon Tomography
EIC Tracking Meeting, March 26, 2012
Update on ATLAS insertable B-layer
A. Zhang, S. Colafranceschi, M. Hohlmann
Micro Resistive Well Detector for Large Area Tracking
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

The GEM Proto-Collaboration (“GEMs for CMS”) Marcus Hohlmann, Florida Tech Interim Chair of Proto-Collaboration Board 2 nd CMS Workshop on High-eta Muon Upgrade with GEM Detectors CERN, June 24, 2011

Overview Timeline so far Current organizational structure Collaboration issues –Conferences & Publications (author list) –Manpower needs & Engaging collaborators –Meetings Regular technical meetings CMS weeks Collaboration / Institution Board –Funding 6/24/2011 M. Hohlmann, 2 nd CMS Workshop on High-eta Muon Upgrade with GEM Detectors, CERN 2

Collaboration Timeline March 28, 2011 Constitutional meeting of institutional team leaders during CMS week and formation of proto-collaboration April 2011 Internal approvals of: –organizational structure –name “GEM Collaboration (GEMs for CMS)” (to evolve into “CMS GEM Collaboration” if approved by CMS) –common fund to cover operating costs Initial author list assembled May 2011 –Formal letter sent to CMS management notifying of formation of proto- collaboration; acknowledged by CMS CB chair, T. Rodrigo (May 5) –Integration of talks by GEM Collaboration into CMS CINCO approval system for conference contributions 6/24/2011 M. Hohlmann, 2 nd CMS Workshop on High-eta Muon Upgrade with GEM Detectors, CERN 3

Current Collaboration The GEM collaboration currently comprises –76 collaborators (see author list on GEM coll. twiki)twiki –15 institutions Bari (INFN & Univ.), Beijing, Bhubaneswar (NISER), CERN, Delhi, Florida Tech, Frascati, Gent, Islamabad (NCP), Kolkata, Mumbai (BARC & TIFR), Napoli, INFN Pisa/Siena, Warsaw, and Wayne State – 7 countries (plus CERN) Belgium, China, CERN, India, Italy, Pakistan, Poland, USA Additional groups are interested in joining: –ULB Brussels, Belgium (Gilles De Lentdecker) –Tsinghua U., China (Chunhua Jian) –2 nd group (instrumentation) from BARC, India (Abhijit Bhattacharyya) –Panjab U., India (Jasbir B. Singh) –KODEL, Seoul, Korea (Sung Park) 6/24/2011 M. Hohlmann, 2 nd CMS Workshop on High-eta Muon Upgrade with GEM Detectors, CERN 4

Organizational Structure 6/24/2011 M. Hohlmann, 2 nd CMS Workshop on High-eta Muon Upgrade with GEM Detectors, CERN 5 Interim Test Beam Coordinator Stefano Colafranceschi Interim Test Beam Coordinator Stefano Colafranceschi Interim Data Analysis Coordinator S. Colafranceschi / W. Li Interim Data Analysis Coordinator S. Colafranceschi / W. Li Interim Electronics Coordinator Paul Aspell Interim Electronics Coordinator Paul Aspell … Interim Physics/Simulation Coordinator M. Maggi / T. Moulik Interim Physics/Simulation Coordinator M. Maggi / T. Moulik Collaboration / Institution Board Interim Detector Coordinator A. Sharma / A. Marinov Interim Detector Coordinator A. Sharma / A. Marinov Interim Software Coordinator Marcello Maggi Interim Software Coordinator Marcello Maggi Interim Project Manager Archana Sharma, CERN Interim Deputy Michael Tytgat, Gent Interim Project Manager Archana Sharma, CERN Interim Deputy Michael Tytgat, Gent Institutions: Bari (INFN & Univ.), Beijing, CERN, U. Delhi, Florida Tech, Frascati, Gent, Kolkata, Napoli, Mumbai (BARC & TIFR), NCP (Pakistan), NISER (India), INFN Pisa/Siena, Wayne State, and Warsaw (currently 15 institutions with 76 collaborators) Interim CB/IB Chair:Marcus Hohlmann, Florida Tech Interim Deputy Chair: Duccio Abbaneo, CERN Interim Publications & Conf. Board Stefano Bianco, Frascati Marcus Hohlmann, Florida Tech Interim Resource Manager Michael Tytgat, Gent Interim Resource Manager Michael Tytgat, Gent Interim CMS Trigger Liaison Karol Bunkowski Interim CMS Trigger Liaison Karol Bunkowski

Publications 2010 –Characterization of GEM Detectors for Application in the CMS Muon Detection System 2010 IEEE Nucl. Sci. Symp. Conf. Rec ; RD51 Note ; arXiv: v1Characterization of GEM Detectors for Application in the CMS Muon Detection System –Construction of the first full-size GEM-based prototype for the CMS high-eta muon system 2010 IEEE Nucl. Sci. Symp. Conf. Rec ; RD51 Note ; arXiv: v2Construction of the first full-size GEM-based prototype for the CMS high-eta muon system –Gas Flow Simulations for Gaseous Detectors 2010 IEEE Nucl. Sci. Symp. Conf. Rec ; RD51 Note Gas Flow Simulations for Gaseous Detectors 2011: –Thermal Stretching of Large-Area GEM Foils Using an Infrared Heating Method;Thermal Stretching of Large-Area GEM Foils Using an Infrared Heating Method RD51 Note –Planned publications: Proc IEEE Nucl. Sci. Symp., Valencia, Spain (Oct 2011) –Construction and Performance of Large-Area Triple-GEM Prototypes for Future Upgrades of the CMS Forward Muon System –Test beam results of the GE1/1 prototype for CMS high-eta muon system future upgrade possibly others ? 6/24/2011 M. Hohlmann, 2 nd CMS Workshop on High-eta Muon Upgrade with GEM Detectors, CERN 6

Conference Contributions 6/24/2011 M. Hohlmann, 2 nd CMS Workshop on High-eta Muon Upgrade with GEM Detectors, CERN : ANIMMA 2011: The Second International Conference on Advancements in Nuclear Instrumentation, Measurement Methods and their Applications, 6-9 June, 2011, Gent, Belgium Characterization of a Full-Size Triple-GEM Prototype for the CMS Muon Detection System, Andrey Marinov (abstract, talk)talk TIPP 2011: Technology and Instrumentation in Particle Physics, 9-14 June 2011, Chicago, IL, USA 1. Performance of a Large-Area Triple-GEM Detector in a Particle Beam, Paul E. Karchin (abstract, talk)abstract 2. Simulation of a Triple-GEM detector for a potential CMS muon tracking and trigger upgrade, Tania Moulik (abstract, talk)abstracttalk EPS-HEP 2011: EPS High Energy Physics Conference, Jul 2011, Grenoble, Isère, France 1. Performance studies of large-area triple-GEM prototypes for future upgrades of the CMS forward muon system, Salvatore Tupputi (abstract, talk accepted)abstract 2. Possibly a poster on advanced construction techniques for GEM detectors (tbc), Michal Zientek MPGD 2011: 2 nd International Conference on Micro Pattern Gaseous Detectors, 29 Aug-1Sep 2011, Kobe University, Japan 1. An overview on the design, construction and performance of large area triple-GEM prototypes for future upgrades of the CMS forward muon system, Archana Sharma (abstract, talk accepted)abstract 2.Test Beam Performance of Triple-GEM Prototypes for the Upgrade of the CMS Muon System in the Forward Region, Michael Tytgat (abstract, poster accepted)abstract ICATPP 2011: 3 rd Int’l Conference on on Advanced Technology and Particle Physics: Astroparticle, Particle, Space Physics, and Detectors for Physics Applications, 3-7 Oct 2011, Como, Italy 1. A dedicated beam test for the full scale GEMs for CMS prototype in a strong magnetic field, Michal Zientek (tbc). 2.Title to be announced, Stefano Colafranceschi (tbc) 2011 IEEE Nuclear Science Symposium and Medical Imaging Conference, October 2011, Valencia, Spain 1. Construction and Performance of Large-Area Triple-GEM Prototypes for Future Upgrades of the CMS Forward Muon System, Michael Tytgat (abstract, talk tbc)abstract 2.Test beam results of the GE1/1 prototype for CMS high-eta muon system future upgrade, Stefano Colafranceschi (abstract, tbc)abstract  Good cross section of speakers from pool of currently active collaborators

Manpower Issues Even though the collaboration comprises ~80 people, much of the work is currently shouldered by a relatively small group of people. They are the ones that also participate regularly in the weekly technical working meetings. We need to engage all collaborators actively: –Task coordinators to identify specific tasks and manpower needs –Team leaders to identify expertise and interest of their team members (ongoing) –Match needs with human resources (CB with task coordinators and team leaders) and assign people to working groups 6/24/2011 M. Hohlmann, 2 nd CMS Workshop on High-eta Muon Upgrade with GEM Detectors, CERN 8

Meetings Weekly technical working meetings (ongoing): –Detector R&D meeting, Tuesdays, 14:00 CET –Electronics R&D meeting, Thursdays, 14:00 CET –Trigger issues covered in CMS trigger upgrade meetings CMS weeks –Plan on having regular technical meetings of the GEM collaboration at all future CMS weeks –Also have a CB/IB meeting at every CMS week, e.g. at the end of the technical meeting 6/24/2011 M. Hohlmann, 2 nd CMS Workshop on High-eta Muon Upgrade with GEM Detectors, CERN 9

Funding In 2011, collaboration is “self-funding” with 3,000 SFr contributions to a common fund from each institution (cash or in-kind). This covers cost for prototype development and summer test beam effort The next steps towards more solid funding are –Produce Technical Proposal –Get approval by CMS as official upgrade project –Approach various national funding agencies for project funding For details, see Michael Tytgat’s talk (next) 6/24/2011 M. Hohlmann, 2 nd CMS Workshop on High-eta Muon Upgrade with GEM Detectors, CERN 10