Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation and Mongolia First year budget Dr. Sergey Kudelya.

Slides:



Advertisements
Similar presentations
Development Alternatives SOUTH ASIA E N V I R O N M E N T O U T L O O K.
Advertisements

LAMP 101 Elizabeth LaPlante US Co-Chair, Superior Work Group US Environmental Protection Agency.
TIA Study Group, Hosei U., Tokyo Use of Information Management and Public Participation by GEF IW Projects Dann Sklarew, Ph.D. Director/Chief.
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
“Participatory approaches towards water management: transboundary cooperation in the River Lielupe (Latvia/Lithuania) ” 9 June 2005, St. Petersburg,
International Cooperation in Water Management and Pollution Control in the Danube River Basin Joachim Bendow, ICPDR Executive Secretary 1.
Environment and Energy Community of Practice meeting, Bratislava, 24 – 26 September, 2007 INTERNATIONAL WATERS.
© 2009 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. Overview of GEF’s STRATEGIC.
The GEF Strategic Partnership for the Mediterranean Large Marine Ecosystem Mediterranean Workshop on ICZM Alghero, Italy – May, 2008.
Dr. Sergey Kudelya Project manager Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation and Mongolia Project.
Approaches and Mainstreaming of Ecosystem-based Adaptation in Europe International workshop “Mainstreaming an ecosystem based approach to climate change.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
The Global Environment Facility 4 th Biennial International Waters Conference July 31 – August , Cape Town, South Africa Pacific Islands Oceanic.
SUB REGIONAL WORKSHOP REPUBLIK OF SERBIA, 1-3 APRIL 2008 BULGARIA’S MOST SUCSESFUL PROJECTS funded by the Global Environment Facility.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
Characterization Report Module 2: Water Budget, Pressures and Impacts, Significant Water Management Issues, Monitoring, Characterization Report Characterization.
International legal Agreements - working together in the environment sphere Massimo Cozzone Italian Ministry for the Environment, Land and Sea 4th EU-Central.
Development of lake Druksiai/Drisviaty Basin Management Program Feasibility study.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia Update on strengthening the implementation and enforcement of EU environmental.
Erkki Vedder Cooperation with Russia in the Context of the EU Enlargement.
International Conference: “Living Lakes” – 10-Year Partnership at Baikal: Chances and Challenges for Sustainable Future for People and the Lake", Russia,
UNDP-GEF Dnipro Basin Environment Programme1. 2 Dnipro basin map.
Approaches and Mainstreaming of Ecosystem-based Adaptation in Europe International workshop “Mainstreaming an ecosystem based approach to climate change.
IWRM in the Danube River Basin Tokyo, 8th December Integrated water resources management in the Danube River Basin Tokyo, 7|12|2004 Ivan Zavadsky,
Information and transboundary cooperation – challenges and responses Francesca Bernardini United Nations Economic Commission for Europe.
1 INTEGRATED WATER RESOURCES MANAGEMENT STRATEGY IN GHANA Water Resources Commission.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
The GEF Strategic Partnership for the Mediterranean Sea WORLD BANK A GEF/World Bank/UNEP-led initiative to address transboundary pollution and catalyze.
1 Integrating (Mainstreaming) Sound Management of Chemicals into National Development Planning United Nations Development Programme Energy and Environment.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
The Strategic Partnership for the Mediterranean Sea Large Marine Ecosystem (MedPartnership) Zagreb, Croatia Regional Workshop on harmonizing the national.
The Male’ Declaration Proposal for Phase 4 Implementation.
Kirk BAYABOS Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation and Mongolia Baikal Project financial.
The Male’ Declaration Proposal for Phase III. Looking back to think ahead Policy Dialogue Background Materials Ministerial agreement Capacity building.
IWRM in GEF-Supported International Waters and their Transboundary Basins Dann M. Sklarew, Ph.D Director/Chief Technical.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Joint bodies according to the UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes Francesca Bernardini United.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
OFMP-2 M&E Inputs to Project Design 1. 2 GEF International Waters Focal Area Objectives GEF IW-1 - Transboundary Basins/ Aquifers: Catalyze multi-state.
Waisea Vosa Climate Change Unit Division of Political and Treaties Ministry of Foreign Affairs and International Cooperation.
A Sustainable Tourism Framework for the Caribbean Mercedes Silva Sustainable Tourism Specialist Caribbean Tourism Organization “Ma Pampo” World Ecotourism.
Dr. Sergey Kudelya Project manager Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation and Mongolia Baikal.
3rd Biennial GEF IW Conference Brasil, June UNDP/GEF Danube Regional Project GEF Danube – Black Sea Strategic Partnership 3rd Biennial GEF International.
1 Legal Frameworks for Public and Stakeholder Engagement by Carl Bruch Asia Regional Workshop on Stakeholder Engagement in International Waters Management.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
Examples for the Engagement of high level policymakers to sustain project outcomes GEF IW LEARN Workshop Jamaica March 2014 Norbert Fenzl Maria Apostolova.
Dr. Sergey Kudelya Project manager Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation and Mongolia Baikal.
Caspian Environment Programme (CEP) GEF 3rd Biannual International Waters Conference June Salvador.
1 AGRICULTURAL POLLUTION REDUCTION ACTIVITY Financed by USAID APRA ROMANIA PROJECT Project implemented by: Assistance project for MAFWE International Resources.
1 AGRICULTURAL POLLUTION REDUCTION ACTIVITY Financed by USAID APRA ROMANIA PROJECT Project implemented by: Assistance project for MAFWE International Resources.
Assessment of groundwater resources in the Baikal Basin and groundwater-related transboundary issues (Output 1.3) Assessment of groundwater resources in.
UNESCO Project Output Activity 4a UNESCO groundwater component of the GEF Lake Baikal Project Jaroslav Vrba Scientific-Technical Coordinator.
Dr. Vladimir Mamaev UNDP Regional Technical Advisor Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation.
21 November, Ulan-Ude, Russia
STATUS OF LAKE VICTORIA ENVIRONMENTAL MANAGEMENT PROJECT II
UNESCO-executed activities in GEF project “Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem” (Mongolia and Russian Federation)
GEF Project Integrated Natural Resources Management in the Baikal Basin Transboundary Ecosystems UNESCO Project Output 1.3 Groundwater resources assessment.
Dr. Sergey Kudelya Project manager
Dr. Sergey Kudelya Project manager
UN Support to SDG implementation in Seychelles.
Partnership for the Gulf of Mexico SEMARNAT GCOOS MoA
Nick Bonvoisin Secretary to the Convention on the
Strengthening Early Warning Systems in Europe
Regional Collaboration on Water Supply Issues
Gender mainstreaming in environmental
LIFE and the implementation of the Water Framework Directive
LIFE and the implementation of the Water Framework Directive
River Basin Management Plans
San Francisco Bay Water Board
Presentation transcript:

Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation and Mongolia First year budget Dr. Sergey Kudelya Project manager Inception workshop, 21 November 2011, Ulan-Ude

Total budget Amount Year 1 (USD) Amount Year 2 (USD) Amount Year 3 (USD) Amount Year 4 (USD) Total (USD) Total Outcome 1:$ $ $ $94.425$ Total Outcome 2:$ $ $ $85.214$ Total Outcome 3:$ $ $ $ Total Management$ $93.210$ $ Total:$ $ $ $ $

Outcomes budget Outcomes International Waters BiodiversityTotal Outcome 1: Strategic policy and planning framework Output 1.1. Transboundary Diagnostic Analysis of threats to the BB ecosystem including Hövsgöl lake in Mongolia completed Output 1.2. Study on the Selenga Delta habitat and water quality issues. including toxic pollution and nutrient loading. water level fluxes. sedimentation levels. and the health of the benthic zone Output 1.3. An assessment of transboundary problems in integrated surface and ground water resources management of the Baikal Basin and corresponding pollution threats Output 1.4. Pollution hot spot assessment of the transboundary Baikal Basin Output 1.5. Strategic Action Programme (SAP). including joint actions to enhance ecosystem protection Output 1.6. Biodiversity conservation standards and biodiversity management objectives for tourism (including sport fishing) and mining integrated in SAP. regional development plans; with amendments to EIA policies to address biodiversity risks Output 1.7. Sub-basin watershed management plans incorporating biodiversity management and ecosystem resilience objectives Outcome 2: Institutional Strengthening for IWRM Output 2.1. Joint Commission for the Baikal / Selenga Basin established and capacitated on the basis of the current joint Russian - Mongolian Task Force on Transboundary Water Use and Protection. 100 Output 2.2. Inter-ministerial committees established at national levels.100 Output 2.3. Training program developed and implemented for key actors in an improved and enhanced. long-term transboundary management of the Baikal Basin Output 2.4. The harmonized BB Water Quality and Aquatic Biodiversity Monitoring program Outcome 3: Demonstrating methods and approaches for water quality and biodiversity mainstreaming Output 3.1. Pilot projects on biodiversity conscious mining approaches Output 3.2. Demonstration and strategy development for (dead) livestock disposal to cease periodic anthrax outbreaks Output 3.3. Pilots for the mainstreaming of biodiversity and ecosystem health management objectives into tourism planning and practice Output 3.4. Baikal Information Center. with NGO Forum and Business and Industry Partnerships Project Management Grand Total

Outcome 1 ActivitiesY1Q1Y1Q2Y1Q3Y1Q4 1.11a) Establish Science Advisory Group $ b) Hold Science Symposium within 6 months of project inception $ c) Hold stakeholder meetings. to include civil society. industry and local government representatives. to discuss ecosystem threats. $ d) Revise and enhance preliminary TDA. including causal chain analysis $ a) Establish / upgrade monitoring sites at inflow. midpoint and outflow locations in the Delta. $ b) Establish baselines relating to water balance and fluxes. water quality. the composition of benthic systems and sediment. diversity of aquatic flora and fauna (including presence of alien species). and presence/use of terrestrial species.(yr 1-2) $ a) Undertake groundwater assessment of the basin using available monitoring sites. $ a) Identify and map all significant industrial hot spots in the Basin. including both active and closed industrial facilities. Prioritize hot spot list based on significance of known risk to surface and groundwater. focusing on: a) waters used for drinking water abstraction. b) proximity to PA. Lake Baikal and Lake Hövsgöl. and spawning grounds c) specific hazardous pollutants used in processes or stored d) significant threat in case of natural disaster: e.g. earthquake or flood. $ b) Review and rank upgrade needs for Selenga basin municipalities. including ID of ongoing and planned water and sanitation projects. $ a) Elaborate best practice conservation standards for tourism. mining using international and regional examples. $ b) Provide gap analysis concerning best practices and the existing policies and standards in Russia and Mongolia. Develop recommendations for changes to local and national policies. legislation and regional development plans to enhance biodiversity protection.(Build on findings and recommendations from self-assessments developed in 2.1.3) $ ra) Assess current basin management strengths and weaknesses $4.155 $

Outcome 2 Activities Y1Q1Y1Q2Y1Q3Y1Q a) Assist countries with selection. capacity building and information transfer to new Joint Commission participants $ b) Facilitate Joint Commission inception meeting and annual meetings $ c) Facilitate support of Science Advisory Group to the Joint Commission $ d) Support Joint Commission review process for TDA and SAP approvals $ a) Designation by countries of participants and holding of interministerial meetings $ b) At country request. participate in interministerial meetings to clarify purpose. benefits and impacts of proposals. including TDA/SAP. transboundary waters treaty. etc. $ a) Develop guidance for self-assessments $ b) Hold training workshops for persons carrying out self-assessments $ d) Identify participants and the institutes and consultants to carry out training program $ a) Identify. assess and map water quality monitoring activity in the basin. including number. location technology and contaminants screened at all monitoring sites; analysis capabilities as well as monitoring protocols (include results from Selenga Delta study 1.1.2) $ $

Outcome 3 Activities Y1Q1Y1Q2Y1Q3Y1Q4 3.31a) Develop biodiversity compatible tourism plans. $ a) Develop communication and public awareness plan $ b) Launch web site (translated) and update $ c) Conduct surveys of tourists to determine pollution awareness and ecotourism interests $ $

Activities - first year, quarter 1 Prepare the Inception report Project management

Activities - first year, quarter a) Establish Science Advisory Group 1.22a) Establish / upgrade monitoring sites at inflow. midpoint and outflow locations in the Delta. 1.45a) Identify and map all significant industrial hot spots in the Basin. including both active and closed industrial facilities. Prioritize hot spot list based on significance of known risk to surface and groundwater. focusing on: a) waters used for drinking water abstraction. b) proximity to PA. Lake Baikal and Lake Hövsgöl. and spawning grounds c) specific hazardous pollutants used in processes or stored d) significant threat in case of natural disaster: e.g. earthquake or flood. 2.11a) Assist countries with selection. capacity building and information transfer to new Joint Commission participants 3.45a) Develop communication and public awareness plan 3.45c) Conduct surveys of tourists to determine pollution awareness and ecotourism interests

Activities - first year, quarter a) Establish Science Advisory Group 1.11b) Hold Science Symposium within 6 months of project inception 1.11c) Hold stakeholder meetings. to include civil society. industry and local government representatives. to discuss ecosystem threats. 1.22a) Establish / upgrade monitoring sites at inflow. midpoint and outflow locations in the Delta. 1.22b) Establish baselines relating to water balance and fluxes. water quality. the composition of benthic systems and sediment. diversity of aquatic flora and fauna (including presence of alien species). and presence/use of terrestrial species.(yr 1-2) 1.45a) Identify and map all significant industrial hot spots in the Basin. including both active and closed industrial facilities. Prioritize hot spot list based on significance of known risk to surface and groundwater. focusing on: a) waters used for drinking water abstraction. b) proximity to PA. Lake Baikal and Lake Hövsgöl. and spawning grounds c) specific hazardous pollutants used in processes or stored d) significant threat in case of natural disaster: e.g. earthquake or flood. 1.67a) Elaborate best practice conservation standards for tourism. mining using international and regional examples. 2.11b) Facilitate Joint Commission inception meeting and annual meetings 2.11c) Facilitate support of Science Advisory Group to the Joint Commission 2.11d) Support Joint Commission review process for TDA and SAP approvals 2.33a) Develop guidance for self-assessments 2.45a) Identify. assess and map water quality monitoring activity in the basin. including number. location technology and contaminants screened at all monitoring sites; analysis capabilities as well as monitoring protocols (include results from Selenga Delta study 1.1.2) 3.45b) Launch web site (translated) and update

Activities - first year, quarter c) Hold stakeholder meetings. to include civil society. industry and local government representatives. to discuss ecosystem threats. 1.11d) Revise and enhance preliminary TDA. including causal chain analysis 1.22a) Establish / upgrade monitoring sites at inflow. midpoint and outflow locations in the Delta. 1.22b) Establish baselines relating to water balance and fluxes. water quality. the composition of benthic systems and sediment. diversity of aquatic flora and fauna (including presence of alien species). and presence/use of terrestrial species.(yr 1-2) 1.34a) Undertake groundwater assessment of the basin using available monitoring sites. 1.45a) Identify and map all significant industrial hot spots in the Basin. including both active and closed industrial facilities. Prioritize hot spot list based on significance of known risk to surface and groundwater. focusing on: a) waters used for drinking water abstraction. b) proximity to PA. Lake Baikal and Lake Hövsgöl. and spawning grounds c) specific hazardous pollutants used in processes or stored d) significant threat in case of natural disaster: e.g. earthquake or flood. 1.45b) Review and rank upgrade needs for Selenga basin municipalities. including ID of ongoing and planned water and sanitation projects. 1.67a) Elaborate best practice conservation standards for tourism. mining using international and regional examples. 1.67b) Provide gap analysis concerning best practices and the existing policies and standards in Russia and Mongolia. Develop recommendations for changes to local and national policies. legislation and regional development plans to enhance biodiversity protection.(Build on findings and recommendations from self-assessments developed in 2.1.3) 1.78ra) Assess current basin management strengths and weaknesses 2.22a) Designation by countries of participants and holding of interministerial meetings 2.22b) At country request. participate in interministerial meetings to clarify purpose. benefits and impacts of proposals. including TDA/SAP. transboundary waters treaty. etc. 2.33a) Develop guidance for self-assessments 2.33b) Hold training workshops for persons carrying out self-assessments 2.33d) Identify participants and the institutes and consultants to carry out training program 2.45a) Identify. assess and map water quality monitoring activity in the basin. including number. location technology and contaminants screened at all monitoring sites; analysis capabilities as well as monitoring protocols (include results from Selenga Delta study 1.1.2) 3.31a) Develop biodiversity compatible tourism plans.