1 Parallel Flow Visualization Goals NAESB BPS Meeting September 15-16, 2010.

Slides:



Advertisements
Similar presentations
2 Draft of proposed metrics for the WEQ BPS to conduct analysis and evaluation of the Parallel Flow Visualization pilot project. (PFV Pilot)
Advertisements

Flowgate Allocation Method Examples of Proportional Curtailment of FIRM PTP and GTL Houston, December 1-2, 2010.
1 Market Flow Threshold Field Test NERC ORS Meeting November 14 th and 15 th.
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Parallel Flow Visualization and Flowgate Allocations Equity Concerns of Non-Market Transmission Owners Equity Concerns of Non-Market Transmission Owners.
Commercial Implications of ERR Calculations Option 3 method vs. Transaction method.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair May 17 th, 2012.
Business Practices Subcommittee Update October 23, 2012 DRAFT.
Parallel Flow Visualization/Mitigation Proposal
Business Practices Subcommittee Update August 17, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair November 9 th, 2011.
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
©2005 PJM 1 Redispatch Credit NERC/NAESB TLR Task Force Feb 2-3, 2005 Houston, Texas Operations Reliability Subcommittee Feb 8-9, 2005 Scottsdale, AZ.
1 Credit for Redispatch Small Group Review of Unconstrained MFs NAESB BPS Meeting December 14-15, 2011.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair September 13 th, 2012.
Business Practices Subcommittee Update October 26, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair April 4 th, 2012.
Business Practices Subcommittee Update February 2, 2010.
Business Practices Subcommittee Update February 1, 2011.
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
Business Practices Subcommittee Update April 30, 2012.
North American Energy Standards Board Upadate Presented by Bob Harshbarger.
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
FEBRUARY 27, 2013 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS Parallel Flow Visualization Overview 1.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Business Practices Subcommittee
Business Practices Subcommittee Update May 4, 2010.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Reload PFV September 12, Reload PFV  Concern that need to be addressed:  The RC need to have an option in PFV to allow gradual reload of markets.
Flowgate Allocation Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Parallel Flow Visualization Project NERC ORS Meeting May 4, 2011.
Electronic Scheduling /Information Technology Subcommittees (ESS/ITS) Update 2008 Review November 4, 2008.
Business Practices Subcommittee Update Executive Committee Meeting October 20, 2015.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
Standards Review Subcommittee Update August 17, 2010.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
Generator Prioritization Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update Yasser Bahbaz IDCWG Chair BPS Update September 13 th, 2011.
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
Business Practices Subcommittee Update October 27, 2009.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
BPS First-To-Curtail/Last-To-Curtail Sub Team Conference Call October 05, 2011.
JJ Jamieson MIC Chair MIC 2015 GOALS March 24, 2015 SLC.
Business Practices Subcommittee Update August 16, 2011.
Business Practices Subcommittee Update Executive Committee Meeting February 23, 2016.
NAESB BPS UPDATE TO EXECUTIVE COMMITTEE AUGUST 21, 2012 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS PARALLEL FLOW VISUALIZATION PROJECT 1.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Interchange Distribution Calculator Working Group (IDCWG) Update
Frank Koza – PJM Dave Zwergel – Midwest ISO
Market Flow Threshold Field Test
Business Practices Subcommittee Update
Business Practices Subcommittee Update
Impact Calculation – BPS Issues
PJM & Midwest ISO Market-to-Market Coordination (APEx Conference 2007)
Pseudo-tie business procedure
Duke Energy Carolinas Quarterly Stakeholder Meeting
Future NERC Congestion Management Tool Option 3A (Proposed by NERC/NAESB TLR TF) 5/11/2005.
Market Flow Threshold Field Test
Request for Information IDC Granularity Option 3/3A
Assigned to the WEQ OASIS and WEQ OASIS/BPS Subcommittees
Two-Tier Firm Curtailment Overview
NERC Congestion Management
Assigned to the WEQ OASIS and BPS Subcommittees
Pseudo-tie business procedure
Presentation transcript:

1 Parallel Flow Visualization Goals NAESB BPS Meeting September 15-16, 2010

2 Major Issues Addressed by Parallel Flow Visualization  Replacing the current native and network load (NNL) calculation made in the IDC with the reporting of near real-time flows addresses three major issues:  NNL calculation made in IDC is used when TLR 5 is called (firm curtailments). Use of static data in NNL calculation produces questionable results, delays in calling TLR 5 and allows no after-the-fact reviews.  RCs in EI lack visualization as to the source and magnitude of parallel flows when they experience congestion.  IDC NNL calculation currently assumes all GTL impacts are firm and can only be curtailed on a pro-rata basis during TLR 5.

3 Parallel Flow Visualization Project Goals  The IDC would indicate the source of all flows on a flowgate and the priority of these flows (tag impacts and GTL impacts).  An RC experiencing congestion would have visualization of the magnitude and source of all flows affecting their flowgate using information from the IDC.  An RC experiencing congestion would request an amount of flow reduction that would be processed by the IDC. A relief obligation would be issued to all parties contributing to the loading.  NAESB will establish methodology for assigning the GTL flows into the appropriate buckets.

4 Parallel Flow Visualization Project Goals  NERC ORS passed a motion “that the ORS agrees that the future use of GTL impacts, as identified in the MISO, PJM, and SPP “Generation-to-Load Reporting Requirements” white paper, will improve visibility and as such will enhance reliability of the Eastern Interconnection. The ORS believes the IDC should be modified to accept GTL calculations. The GTL impact calculation should be consistent for all EI RCs and, as such, a single vendor should be selected to implement the methodology and to perform the actual calculations for all EI RCs.”  NAESB BPS passed a motion to “work towards developing a single approach to implementing TLR’s utilizing the enhanced IDC capability together with the identification of acceptance criteria. The BPS will request of the ORS/IDCWG that during the period of parallel operation data be gathered in order to assess the appropriateness of the approach. Failing to meet acceptance criteria could result in the creation of a new approach.  NAESB BPS will address the line item in the 2010 Annual Plan by developing a permanent solution for prioritizing GTL impacts that are reported to the IDC.