Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.

Slides:



Advertisements
Similar presentations
Crab crossing and crab waist at super KEKB K. Ohmi (KEK) Super B workshop at SLAC 15-17, June 2006 Thanks, M. Biagini, Y. Funakoshi, Y. Ohnishi, K.Oide,
Advertisements

Sha Bai, Philip Bambade, Glen White FJPPL – FKPPL ATF2 workshop LAL, 11~13 February, 2013 Orthogonality of beam waist corrections in the presence of IPBSM.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Study of alternative optical parameters for the ILC final focus On-going work and plans Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
Halo calculations in ATF DR Dou Wang (IHEP), Philip Bambade (LAL), Kaoru Yokoya (KEK), Theo Demma (LAL), Jie Gao (IHEP) FJPPL-FKPPL Workshop on ATF2 Accelerator.
12th January 2006Cockcroft, Liverpool/Daresbury1 ATF, ATF2 and a Beam Diagnostics Section for the ILC ATF, ATF2 and a Beam Diagnostics Section for the.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Working Group 3 Summary M. Sullivan / Y. Funakoshi.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
News from ATF2 Frank Zimmermann KEK visit, February 2012 Thanks to P. Bambade, M. Barnes, A. Faus-Golfe, K. Kubo, S. Kuroda, T. Naito, T. Okugi,
ATF2: the linear collider final focus prototype at KEK - an international telescope for nanometre size beams - Philip Bambade Laboratoire de l’Accélérateur.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility EIC Collaboration Meeting, Hampton University, May 19-23,
Intermediate  configurations at the IP for commissioning and optimization Sha BAI IHEP/LAL Philip BAMBADE LAL.
Proposal of Halo collimation system for ATF2 A.Faus-Golfe, N. Fuster-Martínez J. Resta-López (IFIC) P. Bambade, S. Liu, S. Wallon (LAL) 113/02/1417th ATF2.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Study of alternative ILC final focus optical configurations Dou Wang (IHEP), Yiwei Wang (IHEP), Philip Bambade (LAL), Jie Gao (IHEP) International Workshop.
Future ATF Plans beyond JFY2012 (From JFY2013) After this, we have to submit final proposal to KEK directorates in May The approval process at KEK.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
ATF2 Report ALCW Kiyoshi KUBO, for ATF2 Collaboration.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Simulation of the α, dispersion, coupling and β multiknobs in large β optics Sha Bai, Philip Bambade, Benoit Bolzon, Javier Resta Lopez
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
LAL-IHEP collaboration on the linear collider final focus & ATF2 prototype Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
1 Updated comparison of feedback implementation for e + e - and e - e - modes of operation with realistic errors in the BDS M. Alabau Pons, P. Bambade,
ATF2 Status Background for the installation planning of Collimator
Alignment and stability session
Special ATF Session - ATF/ATF2 day on 28th September -
Philip Bambade / LAL-Orsay Sha Bai / IHEP-Beijing
Emittance measurements for LI2FE electron beams
Recent developments of optical cavity systems for advanced photon sources based on Compton backscattering A. Martens, F. Zomer, P. Favier, K. Cassou,
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
ATF2 post-IP Diamond Sensor Status
Beam-beam effects in eRHIC and MeRHIC
Oversea collaborators
Large Booster and Collider Ring
LAL Status - based on inputs from W. Kaabi and A. Stocchi - cf
Other beam-induced background at the IP
Beam-beam R&D for eRHIC Linac-Ring Option
Status of the VEPP-2000 Collider Project at Novosibirsk
Comparison of the final focus design
Study of e+ e- background due to beamstrahlung for different ILC parameter sets Stephan Gronenborn.
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
SuperB CDR Machine P. Raimondi for the SuperB Team Paris, May 9, 2007.
Beam-Beam Effects in the CEPC
Explanation of the Basic Principles and Goals
BINP Tau-Charm Project Update E.Levichev, BINP, Novosibirsk
Proposal for a CESR Damping Ring Test Facility
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
Presentation transcript:

Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France 5 th FCPPL Workshop, LAL&CEA-Saclay March 2012

 

ATF & ATF2 R&D for linear colliders  efficiency P elec N e E cm  x  y  efficiency P elec  beamstrahlung E cm  y,normalised Luminosity ~  Parameters ATF2ILCCLIC Beam Energy [GeV] L* [m]  x/y [m.rad] 5E-6 / 3E-81E-5 / 4E-86.6E-7 / 2E-8 IP  x/y [mm] 4 / / / 0.07 IP  ’ [rad]  E [%] ~ 0.1 ~ 0.3 Chromaticity ~ 1E4 ~ 5E4 Number of bunches1-3 (goal 1)~ Number of bunches3-30 (goal 2)~ Bunch population1-2E102E103.7E9 IP  y [nm] linac RF + sources beam size control & stability cost & feasibility trade-off

ATF2 Goals  Small vertical beam size - achievement of  y ~ 37 nm (cf. 5 nm in ILC)  Stabilization of beam center - down to ~ 2nm - bunch-to-bunch feedback (~300 ns)  R&D on instrumentation to measure nanometer size beams  Training of young accelerator physicists and engineers on “real system”  open & unique facility

ATF2 operation & instrumentation R&D DR extraction setup, stability Match optics into FF buffer section for input errors 2 nd order telescope fine tuning of local errors

    FCPPL FJPPL FKPPL

Installation of quadrupoles contributed by IHEP (China) in January 2008

“Shintake” beam size monitor at IP Sensitivity ranges of crossing angles

Measurement of the vertical beam size at ATF2 Example: A beam size measured (2010/May/20) Modulation Depth = 8.0 deg. mode  y = (stat.) (syst.) nm A smaller beam size, 37 nm, is one of the target of Goal-1. The reached size was 300 nm before the Great East Japan earthquake. Recover 300nm again, then continue the tuning down to 37 nm.

Great Eastern Earthquake – March 11, 2011 Beams recovered in June !  but ~9 month delay in ATF2 program… Nobuhiro Terunuma (KEK)

Essential to reduce the optical demagnification gradually ! February 2012

Is 37 nm vertical size the limit at ATF2 ? Study explores to what extent can be varied the   * Originally motivated to start ATF2 with larger   * values –More comfortable situation, less sensitive to errors (non-linear optics…) Study shows that beam size down to ~17 nm might be achievable ! –Of large interest for CLIC machine, to demonstrate the its chromaticity regime is feasible –Such low   * values are also of interest for alternative (more economical) ILC setups with “pushed” IP parameters Sha Bai (IHEP & LAL, FCPPL & Eiffel grant)

Skew sextupole tolerance compared to the measurement for the quadrupoles Best quadrupoles: QM15FF, QD10X, QF11X, QF17X, QD18X Worst quadrupoles:QD4BFF, QD0FF, QF5AFF, QF9AFF, QF5BFF Dou Wang (IHEP & KEK) “Mitigating the effects of higher order multipole fields in the magnets of ATF2”, Sha Bai (IHEP) et al., accepted for publication in Chinese Phys. C

First beam waist measurements in the final focus beam line at the KEK Accelerator Test Facility, by Sha Bai et al.: PRSTAB 13, (2010) Method first described in:

 PhD thesis topic Shan Liu (Jilin U.) has applied under the FCPPL-CSC doctoral grant scheme

Selected publications and reports P. Bambade (LAL) et al., Present status and first results of the final focus beam line at the KEK Accelerator Test Facility, PRSTAB 13, (2010) S. Bai (IHEP) et al., First beam waist measurements in the final focus beam line at the KEK Accelerator Test Facility, PRSTAB 13, (2010) S. Bai (IHEP) et al., Simulation of beam size multiknobs correction at Accelerator Test Facility 2 at KEK, Chinese Phys. C 2011 Vol.35(4): S. Bai (IHEP) et al., Mitigating the effects of higher order multipole fields in the magnets of ATF2, Accepted for publication in Chinese Phys. C, 2011 Optical configurations with variable beta* at different IP locations in ATF2, by S. Bai, P. Bambade: ATF-08-05, LAL/RT Linear Collider Test Facility: Twiss Parameter Analysis at the IP/Post-IP location of the ATF2 beam line, by B. Bolzon et al.: THPD077.PDF, Presented at the 1st International Particle Accelerator Conference (IPAC 2010), Kyoto, Japan, May 2010 ATF2 ultra-low IP betas proposal, by R. Tomas et al.: LAL-RT-09-11, Presented at the 23rd Particle Accelerator Conference (PAC09), Vancouver, Canada, 4-8 May 2009 Linear Collider Test Facility: Twiss Parameter Analysis at the IP/Post-IP location of the ATF2 beam line, by B. Bolzon et al.: THPD077.PDF, Presented at the 1st International Particle Accelerator Conference (IPAC 2010), Kyoto, Japan, May 2010 Simulation of Multiknobs Correction at ATF2, by S. Bai et al.: THPD096.PDF, Presented at the 1st International Particle Accelerator Conference (IPAC 2010), Kyoto, Japan, May 2010

Concluding comment ATF2 is making good strong progress in 2012, after recovering form the earthquake The 30 degree mode of “Shintake” monitor is now validated Collaboration with China (IHEP,…) is continuing builing on the FCPPL initial support THANK YOU !